Abstract: An electric power system includes a generating, a
transmission, a distribution, and consumers subsystems. An electrical
power network in Tanzania keeps growing larger by the day and
become more complex so that, most utilities have long wished for
real-time monitoring and remote control of electrical power system
elements such as substations, intelligent devices, power lines,
capacitor banks, feeder switches, fault analyzers and other physical
facilities. In this paper, the concept of automation of management of
power systems from generation level to end user levels was
determined by using Power System Simulator for Engineering
(PSS/E) version 30.3.2.
Abstract: Improving the reactive power and voltage profile of a
distribution substation is investigated in this paper. The purpose is to
properly determination of the shunt capacitors on/off status and
suitable tap changer (TC) position of a substation transformer. In
addition, the limitation of secondary bus voltage, the maximum
allowable number of switching operation in a day for on load tap
changer and on/off status of capacitors are taken into account. To
achieve these goals, an artificial neural network (ANN) is designed to
provide preliminary scheduling. Input of ANN is active and reactive
powers of transformer and its primary and secondary bus voltages.
The output of ANN is capacitors on/off status and TC position. The
preliminary schedule is further refined by fuzzy dynamic
programming in order to reach the final schedule. The operation of
proposed method in Q/V improving is compared with the results
obtained by operator operation in a distribution substation.
Abstract: In this paper we propose an intelligent agent approach
to control the electric power grid at a smaller granularity in order to
give it self-healing capabilities. We develop a method using the
influence model to transform transmission substations into
information processing, analyzing and decision making (intelligent
behavior) units. We also develop a wireless communication method
to deliver real-time uncorrupted information to an intelligent
controller in a power system environment. A combined networking
and information theoretic approach is adopted in meeting both the
delay and error probability requirements. We use a mobile agent
approach in optimizing the achievable information rate vector and in
the distribution of rates to users (sensors). We developed the concept
and the quantitative tools require in the creation of cooperating semiautonomous
subsystems which puts the electric grid on the path
towards intelligent and self-healing system.
Abstract: The electrical substation components are often subject to degradation due to over-voltage or over-current, caused by a short circuit or a lightning. A particular interest is given to the circuit breaker, regarding the importance of its function and its dangerous failure. This component degrades gradually due to the use, and it is also subject to the shock process resulted from the stress of isolating the fault when a short circuit occurs in the system. In this paper, based on failure mechanisms developments, the wear out of the circuit breaker contacts is modeled. The aim of this work is to evaluate its reliability and consequently its residual lifetime. The shock process is based on two random variables such as: the arrival of shocks and their magnitudes. The arrival of shocks was modeled using homogeneous Poisson process (HPP). By simulation, the dates of short-circuit arrivals were generated accompanied with their magnitudes. The same principle of simulation is applied to the amount of cumulative wear out contacts. The objective reached is to find the formulation of the wear function depending on the number of solicitations of the circuit breaker.
Abstract: Based on the component approach, three kinds of
dynamic load models, including a single –motor model, a two-motor
model and composite load model have been developed for the
stability studies of Khuzestan power system. The study results are
presented in this paper. Voltage instability is a dynamic phenomenon
and therefore requires dynamic representation of the power system
components. Industrial loads contain a large fraction of induction
machines. Several models of different complexity are available for
the description investigations. This study evaluates the dynamic
performances of several dynamic load models in combination with
the dynamics of a load changing transformer. Case study is steel
industrial substation in Khuzestan power systems.
Abstract: The economical criterion is accounted as the objective
function to develop a computer program for designing lightning
protection systems for substations by using masts and Matlab in this
work. Masts are needed to be placed at desired locations; the program
will then show mast heights whose sum is the smallest, i.e. satisfies
the economical criterion. The program is helpful for engineers to
quickly design a lightning protection system for a substation. To
realize this work, methodology and limited conditions of the program,
as well as an example of the program result, were described in this
paper.
Abstract: At present, the tendency to implement the conditionbased
maintenance (CBM), which allows the optimization of the
expenses for equipment monitoring, is more and more evident; also,
the transformer substations with remote monitoring are increasingly
used. This paper reviews all the advantages of the on-line monitoring
and presents an equipment for on-line monitoring of bushings, which
is the own contribution of specialists who are the authors of this
paper. The paper presents a study of the temperature field, using the
finite element method. For carrying out this study, the 3D modelling
of the above mentioned bushing was performed. The analysis study is
done taking into account the extreme thermal stresses, focusing at the
level of the first cooling wing section of the ceramic insulator. This
fact enables to justify the tanδ variation in time, depending on the
transformer loading and the environmental conditions. With a view
to reducing the variation of dielectric losses in bushing insulation, the
use of ferrofuids instead of mineral oils is proposed.
Abstract: This paper presents the significant factor and give
some suggestion that should know before design. The main objective of this paper is guide the first step for someone who attends to design of grounding system before study in details later. The overview of
grounding system can protect damage from fault such as can save a human life and power system equipment. The unsafe conditions have
three cases. Case 1) maximum touch voltage exceeds the safety
criteria. In this case, the conductor compression ratio of the ground gird should be first adjusted to have optimal spacing of ground grid
conductors. If it still over limit, earth resistivity should be consider afterward. Case 2) maximum step voltage exceeds the safety criteria.
In this case, increasing the number of ground grid conductors around
the boundary can solve this problem. Case 3) both of maximum touch
and step voltage exceed the safety criteria. In this case, follow the solutions explained in case 1 and case 2. Another suggestion, vary depth of ground grid until maximum step and touch voltage do not
exceed the safety criteria.
Abstract: With Power system movement toward restructuring along with factors such as life environment pollution, problems of transmission expansion and with advancement in construction technology of small generation units, it is expected that small units like wind turbines, fuel cells, photovoltaic, ... that most of the time connect to the distribution networks play a very essential role in electric power industry. With increase in developing usage of small generation units, management of distribution networks should be reviewed. The target of this paper is to present a new method for optimal management of active and reactive power in distribution networks with regard to costs pertaining to various types of dispersed generations, capacitors and cost of electric energy achieved from network. In other words, in this method it-s endeavored to select optimal sources of active and reactive power generation and controlling equipments such as dispersed generations, capacitors, under load tapchanger transformers and substations in a way that firstly costs in relation to them are minimized and secondly technical and physical constraints are regarded. Because the optimal management of distribution networks is an optimization problem with continuous and discrete variables, the new evolutionary method based on Ant Colony Algorithm has been applied. The simulation results of the method tested on two cases containing 23 and 34 buses exist and will be shown at later sections.
Abstract: This paper presents the results of a comprehensive
investigation of five blackouts that occurred on 28 August to 8
September 2011 due to bushing failures of the 132/33 kV, 125 MVA
transformers at JBB Ali Grid station. The investigation aims to
explore the root causes of the bushing failures and come up with
recommendations that help in rectifying the problem and avoiding the
reoccurrence of similar type of incidents. The incident reports about
the failed bushings and the SCADA reports at this grid station were
examined and analyzed. Moreover, comprehensive power quality
field measurements at ten 33/11 kV substations (S/Ss) in JBB Ali
area were conducted, and frequency scans were performed to verify
any harmonic resonance frequencies due to power factor correction
capacitors. Furthermore, the daily operations of the on-load tap
changers (OLTCs) of both the 125 MVA and 20 MVA transformers
at JBB Ali Grid station have been analyzed. The investigation
showed that the five bushing failures were due to a local problem, i.e.
internal degradation of the bushing insulation. This has been
confirmed by analyzing the time interval between successive OLTC
operations of the faulty grid transformers. It was also found that
monitoring the number of OLTC operations can help in predicting
bushing failure.
Abstract: Worldwide many electrical equipment insulation
failures have been reported caused by switching operations, while
those equipments had previously passed all the standard tests and
complied with all quality requirements. The problem is mostly
associated with high-frequency overvoltages generated during
opening or closing of a switching device. The transients generated
during switching operations in a Gas Insulated Substation (GIS) are
associated with high frequency components in the order of few tens
of MHz.
The frequency spectrum of the VFTO generated in the 220/66 kV
Wadi-Hoff GIS is analyzed using Fast Fourier Transform technique.
The main frequency with high voltage amplitude due to the operation
of disconnector (DS5) is 5 to 10 MHz, with the highest amplitude at 9
MHz. The main frequency with high voltage amplitude due to the
operation of circuit breaker (CB5) is 1 to 25 MHz, with the highest
amplitude at 2 MHz.
Mitigating techniques damped the oscillating frequencies
effectively. The using of cable terminal reduced the frequency
oscillation effectively than that of OHTL terminal. The using of a
shunt capacitance results in vanishing the high frequency
components. Ferrite rings reduces the high frequency components
effectively especially in the range 2 to 7 MHz. The using of RC and
RL filters results in vanishing the high frequency components.
Abstract: The demand on High voltage (HV) infrastructures is growing due to the corresponding growth in industries and population. Many areas are being developed and therefore require additional electrical power to comply with the demand. Substation upgrade is one of the rapid solutions to ensure the continuous supply of power to customers. This upgrade requires civil modifications to structures and fences. The civil work requires excavation and steel works that may create unsafe touch conditions. This paper presents a brief theoretical overview of the touch voltage inside and around substations and uses CDEGS software to simulate a case study.
Abstract: In nature, electromagnetic fields always appear like
atmosphere static electric field, the earth's static magnetic field and
the wide-rang frequency electromagnetic field caused by lightening.
However, besides natural electromagnetic fields (EMF), today human
beings are mostly exposed to artificial electromagnetic fields due to
technology progress and outspread use of electrical devices. To
evaluate nuisance of EMF, it is necessary to know field intensity for
every frequency which appears and compare it with allowed values.
Low frequency EMF-s around transmission and distribution lines are
time-varying quasi-static electromagnetic fields which have
conservative component of low frequency electrical field caused by
charges and eddy component of low frequency magnetic field caused
by currents. Displacement current or field delay are negligible, so
energy flow in quasi-static EMF involves diffusion, analog like heat
transfer. Electrical and magnetic field can be analyzed separately.
This paper analysis the numerical calculations in ELF-400 software
of EMF in distribution substation in shopping center. Analyzing the
results it is possible to specify locations exposed to the fields and
give useful suggestion to eliminate electromagnetic effect or reduce it
on acceptable level within the non-ionizing radiation norms and
norms of protection from EMF.
Abstract: Losses reduction initiatives in distribution systems
have been activated due to the increasing cost of supplying
electricity, the shortage in fuel with ever-increasing cost to produce
more power, and the global warming concerns. These initiatives have
been introduced to the utilities in shape of incentives and penalties.
Recently, the electricity distribution companies in Oman have been
incentivized to reduce the distribution technical and non-technical
losses with an equal annual reduction rate for 6 years. In this paper,
different techniques for losses reduction in Mazoon Electricity
Company (MZEC) are addressed. In this company, high numbers of
substation and feeders were found to be non-compliant with the
Distribution System Security Standard (DSSS). Therefore, 33
projects have been suggested to bring non-complying 29 substations
and 28 feeders to meet the planed criteria and to comply with the
DSSS. The largest part of MZEC-s network (South Batinah region)
was modeled by ETAP software package. The model has been
extended to implement the proposed projects and to examine their
effects on losses reduction. Simulation results have shown that the
implementation of these projects leads to a significant improvement
in voltage profile, and reduction in the active and the reactive power
losses. Finally, the economical analysis has revealed that the
implementation of the proposed projects in MZEC leads to an annual
saving of about US$ 5 million.
Abstract: This paper presents an approach for daily optimal operation of distribution networks considering Distributed Generators (DGs). Due to private ownership of DGs, a cost based compensation method is used to encourage DGs in active and reactive power generation. The objective function is summation of electrical energy generated by DGs and substation bus (main bus) in the next day. A genetic algorithm is used to solve the optimal operation problem. The approach is tested on an IEEE34 buses distribution feeder.
Abstract: Preliminary studies on Kuwait high voltage
transmission system show significant increase in the short circuit
level at some of the grid substations and some generating stations.
This increase results from the growth in the power transmission
systems in size and complexity. New generating stations are expected
to be added to the system within the next few years. This paper
describes the study analysis performed to evaluate the available and
potential solutions to control SC levels in Kuwait power system. It
also presents a modified planning of the transmission network in
order to fulfill this task.
Abstract: This article discusses the questions concerning of creating small packet networks for energy companies with application of high voltage power line carrier equipment (PLC) with functionality of IP traffic transmission. The main idea is to create converged PLC links between substations and dispatching centers where packet data and voice are transmitted in one data flow. The article contents description of basic conception of the network, evaluation of voice traffic transmission parameters, and discussion of header compression techniques in relation to PLC links. The results of exploration show us, that convergent packet PLC links can be very useful in the construction of small packet networks between substations in remote locations, such as deposits or low populated areas.
Abstract: As new challenges emerge in power electrical
workplace safety, it is the responsibility of the systems designer to
seek out new approaches and solutions that address them. Design
decisions made today will impact cost, safety and serviceability of
the installed systems for 40 or 50 years during the useful life for the
owner. Studies have shown that this cost is an order of magnitude of
7 to 10 times the installed cost of the power distribution equipment.
This paper reviews some aspects of earthing system design in power
substation surrounded by residential houses. The electrical potential
rise and split factors are discussed and a few recommendations are
provided to achieve a safety voltage in the area beyond the boundary
of the substation.
Abstract: The most important parameter in transformers life
expectancy is the hot-spot temperature level which accelerates the
rate of aging of the insulation. The aim of this paper is to present
thermal models for transformers loaded at prefabricated MV/LV
transformer substations and outdoor situations. The hot-spot
temperature of transformers is studied using their top-oil temperature
rise models. The thermal models proposed for hot-spot and top-oil
temperatures of different operating situations are compared. Since the
thermal transfer is different for indoor and outdoor transformers
considering their operating conditions, their hot-spot thermal models
differ from each other. The proposed thermal models are verified by
the results obtained from the experiments carried out on a typical
1600 kVA, 30 /0.4 kV, ONAN transformer for both indoor and
outdoor situations.