Abstract: Measurements of capacitance C and dissipation
factor tand of the stator insulation system provide useful information
about internal defects within the insulation. The index k is defined as
the proportionality constant between the changes at high voltage of
capacitance DC and of the dissipation factor Dtand . DC and
Dtand values were highly correlated when small flat defects were
within the insulation and that correlation was lost in the presence of
large narrow defects like electrical treeing. The discrimination
between small and large defects is made resorting to partial discharge
PD phase angle analysis. For the validation of the results, C and tand
measurements were carried out in a 15MVA 4160V steam turbine
turbogenerator placed in a sugar mill. In addition, laboratory test
results obtained by other authors were analyzed jointly. In such
laboratory tests, model coil bars subjected to thermal cycling resulted
highly degraded and DC and Dtand values were not correlated. Thus,
the index k could not be calculated.
Abstract: This paper presents the results of a comprehensive
investigation of five blackouts that occurred on 28 August to 8
September 2011 due to bushing failures of the 132/33 kV, 125 MVA
transformers at JBB Ali Grid station. The investigation aims to
explore the root causes of the bushing failures and come up with
recommendations that help in rectifying the problem and avoiding the
reoccurrence of similar type of incidents. The incident reports about
the failed bushings and the SCADA reports at this grid station were
examined and analyzed. Moreover, comprehensive power quality
field measurements at ten 33/11 kV substations (S/Ss) in JBB Ali
area were conducted, and frequency scans were performed to verify
any harmonic resonance frequencies due to power factor correction
capacitors. Furthermore, the daily operations of the on-load tap
changers (OLTCs) of both the 125 MVA and 20 MVA transformers
at JBB Ali Grid station have been analyzed. The investigation
showed that the five bushing failures were due to a local problem, i.e.
internal degradation of the bushing insulation. This has been
confirmed by analyzing the time interval between successive OLTC
operations of the faulty grid transformers. It was also found that
monitoring the number of OLTC operations can help in predicting
bushing failure.