Abstract: This paper considers the advent of 5G and the use of it in a Based Control System (BCS), posing as a basic concept the question of what the real differences and practical improvements are compared to 4G. To this purpose, a testbed hardware simulator has been designed and built where identical machines with the same sensors and management systems will communicate with different radio access network connections. This allows an objective statistical comparison of performance on the real functioning and improvement of the infrastructure with the Industrial Internet of Things (IIoT) connected to it.
Abstract: State Estimator became an intrinsic part of Energy Management Systems (EMS). The SCADA measurements received from the field are processed by the State Estimator in order to accurately determine the actual operating state of the power systems and provide that information to other real-time network applications. All EMS vendors offer a State Estimator functionality in their baseline products. However, setting up and ensuring that State Estimator consistently produces a reliable solution often consumes a substantial engineering effort. This paper provides generic recommendations and describes a simple practical approach to efficient tuning of State Estimator, based on the working experience with major EMS software platforms and consulting projects in many electrical utilities of the USA.
Abstract: This paper presents state estimation with Phasor Measurement Unit (PMU) allocation to obtain complete observability of network. A matrix is designed with modeling of zero injection constraints to minimize PMU allocations. State estimation algorithm is developed with optimal allocation of PMUs to find accurate states of network. The incorporation of PMU into traditional state estimation process improves accuracy and computational performance for large power systems. The nonlinearity integrated with zero injection (ZI) constraints is remodeled to linear frame to optimize number of PMUs. The problem of optimal PMU allocation is regarded with modeling of ZI constraints, PMU loss or line outage, cost factor and redundant measurements. The proposed state estimation with optimal PMU allocation has been compared with traditional state estimation process to show its importance. MATLAB programming on IEEE 14, 30, 57, and 118 bus networks is implemented out by Binary Integer Programming (BIP) method and compared with other methods to show its effectiveness.
Abstract: Accurate determination of wind turbine performance is necessary for economic operation of a wind farm. At present, the procedure to carry out the power performance verification of wind turbines is based on a standard of the International Electrotechnical Commission (IEC). In this paper, nonparametric statistical inference is applied to designing a simple, inexpensive method of verifying the power performance of a wind turbine. A statistical test is explained, examined, and the adequacy is tested over real data. The methods use the information that is collected by the SCADA system (Supervisory Control and Data Acquisition) from the sensors embedded in the wind turbines in order to carry out the power performance verification of a wind farm. The study has used data on the monthly output of wind farm in the Republic of Macedonia, and the time measuring interval was from January 1, 2016, to December 31, 2016. At the end, it is concluded whether the power performance of a wind turbine differed significantly from what would be expected. The results of the implementation of the proposed methods showed that the power performance of the specific wind farm under assessment was acceptable.
Abstract: This paper presents a Generalized Binary Integer Linear Programming (GBILP) method for optimal allocation of Phasor Measurement Units (PMUs) and to generate Dynamic State Estimation (DSE) solution with complete observability. The GBILP method is formulated with Zero Injection Bus (ZIB) constraints to reduce the number of locations for placement of PMUs in the case of normal and single line contingency. The integration of PMU and conventional measurements is modeled in DSE process to estimate accurate states of the system. To estimate the dynamic behavior of the power system with proposed method, load change up to 40% considered at a bus in the power system network. The proposed DSE method is compared with traditional Weighted Least Squares (WLS) state estimation method in presence of load changes to show the impact of PMU measurements. MATLAB simulations are carried out on IEEE 14, 30, 57, and 118 bus systems to prove the validity of the proposed approach.
Abstract: Feeder protection is important in transmission and distribution side because if any fault occurs in any feeder or transformer, man power is needed to identify the problem and it will take more time. In the existing system, directional overcurrent elements with load further secured by a load encroachment function can be used to provide necessary security and sensitivity for faults on remote points in a circuit. It is validated only in renewable plant collector circuit protection applications over a wide range of operating conditions. In this method, the directional overcurrent feeder protection is developed by using monitoring of feeder section through internet. In this web based monitoring, the fault and power theft are identified by using Toro dial sensor and its information is received by SCADA (Supervisory Control and Data Acquisition) and controlled by ARM microcontroller. This web based monitoring is also used to monitor the feeder management, directional current detection, demand side management, overload fault. This monitoring system is capable of monitoring the distribution feeder over a large area depending upon the cost. It is also used to reduce the power theft, time and man power. The simulation is done by MATLAB software.
Abstract: This paper presents a configuration software solution in Linux, which is used for the control of space environment simulator. After introducing the structure and basic principle, it is said that the developing of QT software frame and the dynamic data exchanging between PLC and computer. The OPC driver in Linux is also developed. This driver realizes many-to-many communication between hardware devices and SCADA software. Moreover, an algorithm named “Scan PRI” is put forward. This algorithm is much more optimizable and efficient compared with "Scan in sequence" in Windows. This software has been used in practical project. It has a good control effect and can achieve the expected goal.
Abstract: This paper will explore integration model between GIS–SCADA system and enclosure quantification model to approach the impact of failure-safe event. There are real demands to identify spatial objects and improve control system performance. Nevertheless, the employed methodology is predicting electro-mechanic operations and corresponding time to environmental incident variations. Open processing, as object systems technology, is presented for integration enclosure database with minimal memory size and computation time via connectivity drivers such as ODBC:JDBC during main stages of GIS–SCADA connection. The function of Geographic Information System is manipulating power distribution in contrast to developing issues. In other ward, GIS-SCADA systems integration will require numerical objects of process to enable system model calibration and estimation demands, determine of past events for analysis and prediction of emergency situations for response training.
Abstract: Industrial Control Systems (ICS) such as Supervisory Control And Data Acquisition (SCADA) can be seen in many different critical infrastructures, from nuclear management to utility, medical equipment, power, waste and engine management on ships and planes. The role SCADA plays in critical infrastructure has resulted in a call to secure them. Many lives depend on it for daily activities and the attack vectors are becoming more sophisticated. Hence, the security of ICS is vital as malfunction of it might result in huge risk. This paper describes how the application of Prey Predator (PP) approach in flocks of birds could enhance the detection of malicious activities on ICS. The PP approach explains how these animals in groups or flocks detect predators by following some simple rules. They are not necessarily very intelligent animals but their approach in solving complex issues such as detection through corporation, coordination and communication worth emulating. This paper will emulate flocking behavior seen in birds in detecting predators. The PP approach will adopt six nearest bird approach in detecting any predator. Their local and global bests are based on the individual detection as well as group detection. The PP algorithm was designed following MapReduce methodology that follows a Split Detection Convergence (SDC) approach.
Abstract: The selection of diffractive events in the ALICE experiment during the first data taking period (RUN-I) of the Large Hadron Collider (LHC) was limited by the range over which rapidity gaps occur. It would be possible to achieve better measurements by expanding the range in which the production of particles can be detected. For this purpose, the ALICE Diffractive (AD0) detector has been installed and commissioned for the second phase (RUN-II). Any new detector should be able to take the data synchronously with all other detectors and be operated through the ALICE central systems. One of the key elements that must be developed for the AD0 detector is the Detector Control System (DCS). The DCS must be designed to operate safely and correctly this detector. Furthermore, the DCS must also provide optimum operating conditions for the acquisition and storage of physics data and ensure these are of the highest quality. The operation of AD0 implies the configuration of about 200 parameters, from electronics settings and power supply levels to the archiving of operating conditions data and the generation of safety alerts. It also includes the automation of procedures to get the AD0 detector ready for taking data in the appropriate conditions for the different run types in ALICE. The performance of AD0 detector depends on a certain number of parameters such as the nominal voltages for each photomultiplier tube (PMT), their threshold levels to accept or reject the incoming pulses, the definition of triggers, etc. All these parameters define the efficiency of AD0 and they have to be monitored and controlled through AD0 DCS. Finally, AD0 DCS provides the operator with multiple interfaces to execute these tasks. They are realized as operating panels and scripts running in the background. These features are implemented on a SCADA software platform as a distributed control system which integrates to the global control system of the ALICE experiment.
Abstract: This project aims at building an efficient and
automatic power monitoring SCADA system, which is capable of
monitoring the electrical parameters of high voltage powered devices
in real time for example RMS voltage and current, frequency, energy
consumed, power factor etc. The system uses RS-485 serial
communication interface to transfer data over longer distances.
Embedded C programming is the platform used to develop two
hardware modules namely: RTU and Master Station modules, which
both use the CC2540 BLE 4.0 microcontroller configured in slave /
master mode. The Si8900 galvanic ally isolated microchip is used to
perform ADC externally. The hardware communicates via UART
port and sends data to the user PC using the USB port. Labview
software is used to design a user interface to display current state of
the power loads being monitored as well as logs data to excel
spreadsheet file. An understanding of the Si8900’s auto baud rate
process is key to successful implementation of this project.
Abstract: There are a number of Distributed Generations (DGs)
installed in microgrid, which may have diverse path and direction of
power flow or fault current. The overcurrent protection scheme for the
traditional radial type distribution system will no longer meet the
needs of microgrid protection. Integrating the Intelligent Electronic
Device (IED) and a Supervisory Control and Data Acquisition
(SCADA) with IEC 61850 communication protocol, the paper
proposes a Microgrid Protection Management System (MPMS) to
protect power system from the fault. In the proposed method, the
MPMS performs logic programming of each IED to coordinate their
tripping sequence. The GOOSE message defined in IEC 61850 is used
as the transmission information medium among IEDs. Moreover, to
cope with the difference in fault current of microgrid between
grid-connected mode and islanded mode, the proposed MPMS applies
the group setting feature of IED to protect system and robust
adaptability. Once the microgrid topology varies, the MPMS will
recalculate the fault current and update the group setting of IED.
Provided there is a fault, IEDs will isolate the fault at once. Finally, the
Matlab/Simulink and Elipse Power Studio software are used to
simulate and demonstrate the feasibility of the proposed method.
Abstract: Implementation of advanced technologies requires
sophisticated instruments that deal with the operation, control,
restoration and protection of rapidly growing power system network
under normal and abnormal conditions. Presently, the applications of
Phasor Measurement Unit (PMU) are widely found in real time
operation, monitoring, controlling and analysis of power system
network as it eliminates the various limitations of supervisory control
and data acquisition system (SCADA) conventionally used in power
system. The use of PMU data is very rapidly increasing its
importance for online and offline analysis. Wide area measurement
system (WAMS) is developed as new technology by use of multiple
PMUs in power system. The present paper proposes a model of
Matlab based PMU using Discrete Fourier Transform (DFT)
algorithm and evaluation of its operation under different
contingencies. In this paper, PMU based two bus system having
WAMS network is presented as a case study.
Abstract: In order to better understand the long term
implications of the grout wear failure mode in large-diameter plainsided
grouted connections, a numerical model has been developed
and calibrated that can take advantage of existing operational plant
data to predict the wear accumulation for the actual load conditions
experienced over a given period, thus limiting the requirement for
expensive monitoring systems. This model has been derived and
calibrated based on site structural condition monitoring (SCM) data
and supervisory control and data acquisition systems (SCADA) data
for two operational wind turbine generator substructures afflicted
with this challenge, along with experimentally derived wear rates.
Abstract: The investigation on wind turbine degradation was
carried out using the nacelle wind data. The three Vestas V80-2MW
wind turbines of Sungsan wind farm in Jeju Island, South Korea were
selected for this work. The SCADA data of the wind farm for five
years were analyzed to draw power curve of the turbines. It is assumed
that the wind distribution is the Rayleigh distribution to calculate the
normalized capacity factor based on the drawn power curve of the
three wind turbines for each year. The result showed that the reduction
of power output from the three wind turbines occurred every year and
the normalized capacity factor decreased to 0.12%/year on average.
Abstract: Time base maintenance (TBM) is conventionally applied by the power utilities to maintain circuit breakers (CBs), transformers, bus bars and cables, which may result in under maintenance or over maintenance. As information and communication technology (ICT) industry develops, the maintenance policies of many power utilities have gradually changed from TBM to condition base maintenance (CBM) to improve system operating efficiency, operation cost and power supply reliability. This paper discusses the feasibility of using intelligent electronic devices (IEDs) to construct a CB CBM management platform. CBs in power substations can be monitored using IEDs with additional logic configuration and wire connections. The CB monitoring data can be sent through intranet to a control center and be analyzed and integrated by the Elipse Power Studio software. Finally, a human-machine interface (HMI) of supervisory control and data acquisition (SCADA) system can be designed to construct a CBM management platform to provide maintenance decision information for the maintenance personnel, management personnel and CB manufacturers.
Abstract: A SCADA (Supervisory Control And Data
Acquisition) system is an industrial control and monitoring system for
national infrastructures. The SCADA systems were used in a closed
environment without considering about security functionality in the
past. As communication technology develops, they try to connect the
SCADA systems to an open network. Therefore, the security of the
SCADA systems has been an issue. The study of key management for
SCADA system also has been performed. However, existing key
management schemes for SCADA system such as SKE(Key
establishment for SCADA systems) and SKMA(Key management
scheme for SCADA systems) cannot support broadcasting
communication. To solve this problem, an Advanced Key
Management Architecture for Secure SCADA Communication has
been proposed by Choi et al.. Choi et al.-s scheme also has a problem
that it requires lots of computational cost for multicasting
communication. In this paper, we propose an enhanced scheme which
improving computational cost for multicasting communication with
considering the number of keys to be stored in a low power
communication device (RTU).
Abstract: In this paper, we present a cost-effective wireless
distributed load shedding system for non-emergency scenarios. In
power transformer locations where SCADA system cannot be used,
the proposed solution provides a reasonable alternative that combines
the use of microcontrollers and existing GSM infrastructure to send
early warning SMS messages to users advising them to proactively
reduce their power consumption before system capacity is reached
and systematic power shutdown takes place.
A novel communication protocol and message set have been
devised to handle the messaging between the transformer sites, where
the microcontrollers are located and where the measurements take
place, and the central processing site where the database server is
hosted. Moreover, the system sends warning messages to the endusers
mobile devices that are used as communication terminals. The
system has been implemented and tested via different experimental
results.
Abstract: Since IEC61850 substation communication standard represents the trend to develop new generations of Substation Automation System (SAS), many IED manufacturers pursue this technique and apply for KEMA. In order to put on the market to meet customer demand as fast as possible, manufacturers often apply their products only for basic environment standard certification but claim to conform to IEC61850 certification. Since verification institutes generally perform verification tests only on specific IEDs of the manufacturers, the interoperability between all certified IEDs cannot be guaranteed. Therefore the interoperability between IEDs from different manufacturers needs to be tested. Based upon the above reasons, this study applies the definitions of the information models, communication service, GOOSE functionality and Substation Configuration Language (SCL) of the IEC61850 to build the concept of communication protocols, and build the test environment. The procedures of the test of the data collection and exchange of the P2P communication mode and Client / Server communication mode in IEC61850 are outlined as follows. First, test the IED GOOSE messages communication capability from different manufacturers. Second, collect IED data from each IED with SCADA system and use HMI to display the SCADA platform. Finally, problems generally encountered in the test procedure are summarized.
Abstract: As an effort to promote wind power industry in Korea,
Korea South-East Power Corporation has been developing 22MW
YeungHeung wind farm consisting of nine 2 to 3MW wind turbines
supplied by three manufacturers. To maximize its availability and
reliability and to solve the difficulty of operating three kinds of
SCADA systems, Korea Electric Power Corporation has been
developing a condition monitoring system integrated with control
functions. This paper presents the developed condition monitoring
system and its application to YeungHeung wind test bed, and the
design of its control functions.