Abstract: The cables in a nuclear power plant are designed to be
used for about 40 years in safe operation environment. However, the
heat and radiation in the nuclear power plant causes the rapid
performance deterioration of cables in nuclear vessels and heat
exchangers, which requires cable lifetime estimation. The most
accurate method of estimating the cable lifetime is to evaluate the
cables in a laboratory. However, removing cables while the plant is
operating is not allowed because of its safety and cost. In this paper, a
robot system to estimate the cable lifetime in nuclear power plants is
developed and tested. The developed robot system can calculate a
modulus value to estimate the cable lifetime even when the nuclear
power plant is in operation.
Abstract: As an effort to promote wind power industry in Korea,
Korea South-East Power Corporation has been developing 22MW
YeungHeung wind farm consisting of nine 2 to 3MW wind turbines
supplied by three manufacturers. To maximize its availability and
reliability and to solve the difficulty of operating three kinds of
SCADA systems, Korea Electric Power Corporation has been
developing a condition monitoring system integrated with control
functions. This paper presents the developed condition monitoring
system and its application to YeungHeung wind test bed, and the
design of its control functions.
Abstract: Wind turbine should be controlled to capture maximum
wind energy and to prevent the turbine from being stalled. To achieve
those two goals, wind turbine controller controls torque on generator
and limits input torque from wind by pitching blade. Usually, torque
on generator is controlled using inverter torque set point. However,
verifying a control algorithm in actual wind turbine needs a lot of
efforts to test and the actual wind turbine could be broken while testing
a control algorithm. So, several software have developed and
commercialized by Garrad Hassan, GH Bladed, and NREL, FAST.
Even though, those programs can simulate control system modeling
with subroutines or DLLs. However, those simulation programs are
not able to emulate detailed generator or PMSG. In this paper, a small
size wind turbine simulator is developed with induction motor and
small size drive train. The developed system can simulate wind turbine
control algorithm in the region before rated power.