Abstract: Efforts to secure supervisory control and data acquisition
(SCADA) systems must be supported under the guidance of
sound security policies and mechanisms to enforce them. Critical
elements of the policy must be systematically translated into a format
that can be used by policy enforcement components. Ideally, the
goal is to ensure that the enforced policy is a close reflection of
the specified policy. However, security controls commonly used to
enforce policies in the IT environment were not designed to satisfy
the specific needs of the SCADA environment. This paper presents
a language, based on the well-known XACML framework, for the
expression of authorization policies for SCADA systems.
Abstract: This paper presents the results of a comprehensive
investigation of five blackouts that occurred on 28 August to 8
September 2011 due to bushing failures of the 132/33 kV, 125 MVA
transformers at JBB Ali Grid station. The investigation aims to
explore the root causes of the bushing failures and come up with
recommendations that help in rectifying the problem and avoiding the
reoccurrence of similar type of incidents. The incident reports about
the failed bushings and the SCADA reports at this grid station were
examined and analyzed. Moreover, comprehensive power quality
field measurements at ten 33/11 kV substations (S/Ss) in JBB Ali
area were conducted, and frequency scans were performed to verify
any harmonic resonance frequencies due to power factor correction
capacitors. Furthermore, the daily operations of the on-load tap
changers (OLTCs) of both the 125 MVA and 20 MVA transformers
at JBB Ali Grid station have been analyzed. The investigation
showed that the five bushing failures were due to a local problem, i.e.
internal degradation of the bushing insulation. This has been
confirmed by analyzing the time interval between successive OLTC
operations of the faulty grid transformers. It was also found that
monitoring the number of OLTC operations can help in predicting
bushing failure.