Access Policy Specification for SCADA Networks

Efforts to secure supervisory control and data acquisition (SCADA) systems must be supported under the guidance of sound security policies and mechanisms to enforce them. Critical elements of the policy must be systematically translated into a format that can be used by policy enforcement components. Ideally, the goal is to ensure that the enforced policy is a close reflection of the specified policy. However, security controls commonly used to enforce policies in the IT environment were not designed to satisfy the specific needs of the SCADA environment. This paper presents a language, based on the well-known XACML framework, for the expression of authorization policies for SCADA systems.

Analysis of the Root Causes of Transformer Bushing Failures

This paper presents the results of a comprehensive investigation of five blackouts that occurred on 28 August to 8 September 2011 due to bushing failures of the 132/33 kV, 125 MVA transformers at JBB Ali Grid station. The investigation aims to explore the root causes of the bushing failures and come up with recommendations that help in rectifying the problem and avoiding the reoccurrence of similar type of incidents. The incident reports about the failed bushings and the SCADA reports at this grid station were examined and analyzed. Moreover, comprehensive power quality field measurements at ten 33/11 kV substations (S/Ss) in JBB Ali area were conducted, and frequency scans were performed to verify any harmonic resonance frequencies due to power factor correction capacitors. Furthermore, the daily operations of the on-load tap changers (OLTCs) of both the 125 MVA and 20 MVA transformers at JBB Ali Grid station have been analyzed. The investigation showed that the five bushing failures were due to a local problem, i.e. internal degradation of the bushing insulation. This has been confirmed by analyzing the time interval between successive OLTC operations of the faulty grid transformers. It was also found that monitoring the number of OLTC operations can help in predicting bushing failure.