Abstract: CO₂-based gas mixtures exhibit huge potential as the interruption medium for replacing SF₆ in high voltage switchgears. In this paper, the recovery characteristics of dielectric strength of CO₂-O₂ mixture in the post arc phase after the current zero are presented. As representative examples, the dielectric recovery curves under conditions of different gas filling pressures and short-circuit current amplitudes are presented. A series of dielectric recovery measurements suggests that the dielectric recovery rate is proportional to the mass flux of the blowing gas, and the dielectric strength recovers faster in the case of lower short circuit currents.
Abstract: Time base maintenance (TBM) is conventionally applied by the power utilities to maintain circuit breakers (CBs), transformers, bus bars and cables, which may result in under maintenance or over maintenance. As information and communication technology (ICT) industry develops, the maintenance policies of many power utilities have gradually changed from TBM to condition base maintenance (CBM) to improve system operating efficiency, operation cost and power supply reliability. This paper discusses the feasibility of using intelligent electronic devices (IEDs) to construct a CB CBM management platform. CBs in power substations can be monitored using IEDs with additional logic configuration and wire connections. The CB monitoring data can be sent through intranet to a control center and be analyzed and integrated by the Elipse Power Studio software. Finally, a human-machine interface (HMI) of supervisory control and data acquisition (SCADA) system can be designed to construct a CBM management platform to provide maintenance decision information for the maintenance personnel, management personnel and CB manufacturers.
Abstract: The purpose of this paper is to acquire the remote electrical parameters like Voltage, Current, and Frequency from Smart grid and send these real time values over GSM network using GSM Modem/phone along with temperature at power station. This project is also designed to protect the electrical circuitry by operating an Electromagnetic Relay. The Relay can be used to operate a Circuit Breaker to switch off the main electrical supply. User can send commands in the form of SMS messages to read the remote electrical parameters. This system also can automatically send the real time electrical parameters periodically (based on time settings) in the form of SMS. This system also send SMS alerts whenever the Circuit Breaker trips or whenever the Voltage or Current exceeds the predefined limits.
Abstract: Various studies have showed that about 90% of single line to ground faults occurred on High voltage transmission lines have transient nature. This type of faults is cleared by temporary outage (by the single phase auto-reclosure). The interval between opening and reclosing of the faulted phase circuit breakers is named “Dead Time” that is varying about several hundred milliseconds. For adjustment of traditional single phase auto-reclosures that usually are not intelligent, it is necessary to calculate the dead time in the off-line condition precisely. If the dead time used in adjustment of single phase auto-reclosure is less than the real dead time, the reclosing of circuit breakers threats the power systems seriously. So in this paper a novel approach for precise calculation of dead time in power transmission lines based on the network equivalencing in time domain is presented. This approach has extremely higher precision in comparison with the traditional method based on Thevenin equivalent circuit. For comparison between the proposed approach in this paper and the traditional method, a comprehensive simulation by EMTP-ATP is performed on an extensive power network.
Abstract: This paper presents the results of a preventive maintenance application-based study and modeling of failure rates in breakers of electrical distribution systems. This is a critical issue in the reliability assessment of a system. In the analysis conducted in this paper, the impacts of failure rate variations caused by a preventive maintenance are examined. This is considered as a part of a Reliability Centered Maintenance (RCM) application program. A number of load point reliability indices is derived using the mathematical model of the failure rate, which is established using the observed data in a distribution system.
Abstract: The electrical substation components are often subject to degradation due to over-voltage or over-current, caused by a short circuit or a lightning. A particular interest is given to the circuit breaker, regarding the importance of its function and its dangerous failure. This component degrades gradually due to the use, and it is also subject to the shock process resulted from the stress of isolating the fault when a short circuit occurs in the system. In this paper, based on failure mechanisms developments, the wear out of the circuit breaker contacts is modeled. The aim of this work is to evaluate its reliability and consequently its residual lifetime. The shock process is based on two random variables such as: the arrival of shocks and their magnitudes. The arrival of shocks was modeled using homogeneous Poisson process (HPP). By simulation, the dates of short-circuit arrivals were generated accompanied with their magnitudes. The same principle of simulation is applied to the amount of cumulative wear out contacts. The objective reached is to find the formulation of the wear function depending on the number of solicitations of the circuit breaker.
Abstract: The two significant overvoltages in power system,
switching overvoltage and lightning overvoltage, are investigated in
this paper. Firstly, the effect of various power system parameters on
Line Energization overvoltages is evaluated by simulation in ATP.
The dominant parameters include line parameters; short-circuit
impedance and circuit breaker parameters. Solutions to reduce
switching overvoltages are reviewed and controlled closing using
switchsync controllers is proposed as proper method.
This paper also investigates lightning overvoltages in the
overhead-cable transition. Simulations are performed in
PSCAD/EMTDC. Surge arresters are applied in both ends of cable to
fulfill the insulation coordination. The maximum amplitude of
overvoltages inside the cable is surveyed which should be of great
concerns in insulation coordination studies.
Abstract: The paper presents an investigation in to the effect of neural network predictive control of UPFC on the transient stability performance of a multimachine power system. The proposed controller consists of a neural network model of the test system. This model is used to predict the future control inputs using the damped Gauss-Newton method which employs ‘backtracking’ as the line search method for step selection. The benchmark 2 area, 4 machine system that mimics the behavior of large power systems is taken as the test system for the study and is subjected to three phase short circuit faults at different locations over a wide range of operating conditions. The simulation results clearly establish the robustness of the proposed controller to the fault location, an increase in the critical clearing time for the circuit breakers, and an improved damping of the power oscillations as compared to the conventional PI controller.
Abstract: The fault current levels through the electric devices
have a significant impact on failure probability. New fault current
results in exceeding the rated capacity of circuit breaker and switching
equipments and changes operation characteristic of overcurrent relay.
In order to solve these problems, SFCL (Superconducting Fault
Current Limiter) has rising as one of new alternatives so as to improve
these problems. A fault current reduction differs depending on
installed location. Therefore, a location of SFCL is very important.
Also, SFCL decreases the fault current, and it prevents surrounding
protective devices to be exposed to fault current, it then will bring a
change of reliability. In this paper, we propose method which
determines the optimal location when SFCL is installed in power
system. In addition, the reliability about the power system which
SFCL was installed is evaluated. The efficiency and effectiveness of
this method are also shown by numerical examples and the reliability
indices are evaluated in this study at each load points. These results
show a reliability change of a system when SFCL was installed.
Abstract: The continuity in the electric supply of the electric installations is becoming one of the main requirements of the electric supply network (generation, transmission, and distribution of the electric energy). The achievement of this requirement depends from one side on the structure of the electric network and on the other side on the avaibility of the reserve source provided to maintain the supply in case of failure of the principal one. The avaibility of supply does not only depends on the reliability parameters of the both sources (principal and reserve) but it also depends on the reliability of the circuit breaker which plays the role of interlocking the reserve source in case of failure of the principal one. In addition, the principal source being under operation, its control can be ideal and sure, however, for the reserve source being in stop, a preventive maintenances which proceed on time intervals (periodicity) and for well defined lengths of time are envisaged, so that this source will always available in case of the principal source failure. The choice of the periodicity of preventive maintenance of the source of reserve influences directly the reliability of the electric feeder system In this work and on the basis of the semi- markovian's processes, the influence of the time of interlocking the reserve source upon the reliability of an industrial electric network is studied and is given the optimal time of interlocking the reserve source in case of failure the principal one, also the influence of the periodicity of the preventive maintenance of the source of reserve is studied and is given the optimal periodicity.
Abstract: This paper describes a three-dimensional thermal
model of the current path included in the low voltage power circuit
breakers. The model can be used to analyse the thermal behaviour of
the current path during both steady-state and transient conditions.
The current path lengthwise temperature distribution and timecurrent
characteristic of the terminal connections of the power circuit
breaker have been obtained. The influence of the electric current and
voltage drop on main electric contact of the circuit breaker has been
investigated. To validate the three-dimensional thermal model, some
experimental tests have been done. There is a good correlation
between experimental and simulation results.
Abstract: Since large power transformers are the most
expensive and strategically important components of any power
generator and transmission system, their reliability is crucially
important for the energy system operation. Also, Circuit breakers are
very important elements in the power transmission line so monitoring
the events gives a knowledgebase to determine time to the next
maintenance. This paper deals with the introduction of the
comparative method of the state estimation of transformers and
Circuit breakers using continuous monitoring of voltage, current.
This paper gives details a new method based on wavelet to apparatus
insulation monitoring. In this paper to insulation monitoring of
transformer, a new method based on wavelet transformation and
neutral point analysis is proposed. Using the EMTP tools, fault in
transformer winding and the detailed transformer winding model
were simulated. The current of neutral point of winding was analyzed
by wavelet transformation. It is shown that the neutral current of the
transformer winding has useful information about fault in insulation
of the transformer.
Abstract: Worldwide many electrical equipment insulation
failures have been reported caused by switching operations, while
those equipments had previously passed all the standard tests and
complied with all quality requirements. The problem is mostly
associated with high-frequency overvoltages generated during
opening or closing of a switching device. The transients generated
during switching operations in a Gas Insulated Substation (GIS) are
associated with high frequency components in the order of few tens
of MHz.
The frequency spectrum of the VFTO generated in the 220/66 kV
Wadi-Hoff GIS is analyzed using Fast Fourier Transform technique.
The main frequency with high voltage amplitude due to the operation
of disconnector (DS5) is 5 to 10 MHz, with the highest amplitude at 9
MHz. The main frequency with high voltage amplitude due to the
operation of circuit breaker (CB5) is 1 to 25 MHz, with the highest
amplitude at 2 MHz.
Mitigating techniques damped the oscillating frequencies
effectively. The using of cable terminal reduced the frequency
oscillation effectively than that of OHTL terminal. The using of a
shunt capacitance results in vanishing the high frequency
components. Ferrite rings reduces the high frequency components
effectively especially in the range 2 to 7 MHz. The using of RC and
RL filters results in vanishing the high frequency components.
Abstract: This paper presents the development of adaptive
distance relay for protection of parallel transmission line with mutual
coupling. The proposed adaptive relay, automatically adjusts its
operation based on the acquisition of the data from distance relay of
adjacent line and status of adjacent line from line circuit breaker IED
(Intelligent Electronic Device). The zero sequence current of the
adjacent parallel transmission line is used to compute zero sequence
current ratio and the mutual coupling effect is fully compensated.
The relay adapts to changing circumstances, like failure in
communication from other relays and non - availability of adjacent
transmission line. The performance of the proposed adaptive relay is
tested using steady state and dynamic test procedures. The fault
transients are obtained by simulating a realistic parallel transmission
line system with mutual coupling effect in PSCAD. The evaluation
test results show the efficacy of adaptive distance relay over the
conventional distance relay.