CNet Module Design of IMCS

IMCS is Integrated Monitoring and Control System for thermal power plant. This system consists of mainly two parts; controllers and OIS (Operator Interface System). These two parts are connected by Ethernet-based communication. The controller side of communication is managed by CNet module and OIS side is managed by data server of OIS. CNet module sends the data of controller to data server and receives commend data from data server. To minimizes or balance the load of data server, this module buffers data created by controller at every cycle and send buffered data to data server on request of data server. For multiple data server, this module manages the connection line with each data server and response for each request from multiple data server. CNet module is included in each controller of redundant system. When controller fail-over happens on redundant system, this module can provide data of controller to data sever without loss. This paper presents three main features – separation of get task, usage of ring buffer and monitoring communication status –of CNet module to carry out these functions.

Housing Rehabilitation as a Means of Urban Regeneration and Population Integration

The proposed paper examines strategies whose aim is to counter the all too often sighted process of abandonment that characterizes contemporary cities. The city of Nicosia in Cyprus is used as an indicative case study, whereby several recent projects are presented as capitalizing on traditional cultural assets to revive the downtown. The reuse of existing building stock as museums, performing arts centers and theaters but also as in the form of various housing typologies is geared to strengthen the ranks of local residents and to spur economic growth. Unlike the examples from the 1960s, the architecture of more recent adaptive reuse for urban regeneration seems to be geared in reinforcing a connection to the city where the buildings often reflect the characteristics of their urban context.

Behavior and Strength of Slab-Edge Beam-Column Connections under Shear Force and Moment

A total of fourteen slab-edge beam-column connection specimens were tested gradually to failure under the effect of simultaneous action of shear force and moment. The objective was to investigate the influence of some parameters thought to be important on the behavior and strength of slab-column connections with edge beams encountered in flat slab flooring and roofing systems. The parameters included the existence and strength of edge beam, depth and width of edge beam, steel reinforcement ratio of slab, ratio of moment to shear force, and the existence of openings in the region next to the column. Results obtained demonstrated the importance of the studied parameters on the strength and behavior of slab-column connections with edge beams.

Experimental Investigation on Cold-formed Steel Wall Plate System

A series of tests on cold-formed steel (CFS) wall plate system subjected to uplift force at the mid span of the wall plate is presented. The aim of the study was to study the behaviour and identify the modes of failure of CFS wall plate system. Two parameters were considered in these studies: 1) different dimension of U-bracket at the supports and 2) different sizes of lipped C-channel. The lipped C-channels used were C07508, C07512 and C10012. The dimensions of the leg of U-bracket were 50x35 mm and 50x60 mm respectively, where 25 mm clearance was provided to the connections for specimens with clearance. Results show that specimens with and without clearance experienced the same mode of failure. Failure began with the yielding of the connectors followed by distortional buckling of the wall plate. However, when C075 sections were used as wall plate, the system behaved differently. There was a large deformation in the wall plate and failure began in the distortional buckling of the wall plate followed by bearing of the connecting plates at the supports (U-bracket). The ultimate strength of the system also decreased dramatically when C075 sections were used.

An Experimental Method for Measuring Clamping Force in Bolted Connections and Effect of Bolt Threads Lubrication on Its Value

In this paper, the details of an experimental method to measure the clamping force value at bolted connections due to application of wrenching torque to tighten the nut have been presented. A simplified bolted joint including a holed plate with a single bolt was considered to carry out the experiments. This method was designed based on Hooke-s law by measuring compressive axial strain of a steel bush placed between the nut and the plate. In the experimental procedure, the values of clamping force were calculated for seven different levels of applied torque, and this process was repeated three times for each level of the torque. Moreover, the effect of lubrication of threads on the clamping value was studied using the same method. In both conditions (dry and lubricated threads), relation between the torque and the clamping force have been displayed in graphs.

Evaluating Performance of Quality-of-Service Routing in Large Networks

The performance and complexity of QoS routing depends on the complex interaction between a large set of parameters. This paper investigated the scaling properties of source-directed link-state routing in large core networks. The simulation results show that the routing algorithm, network topology, and link cost function each have a significant impact on the probability of successfully routing new connections. The experiments confirm and extend the findings of other studies, and also lend new insight designing efficient quality-of-service routing policies in large networks.

Mission of Russian Orthodox Church in Kazakhstan in the XIX Century: Activity, Expectations and Results

The focus of this research is in the area of the soviet period and the mission of the Russian Orthodox Church in Kazakhstan in the XIX century. There was close connection of national customs and traditions with religious practices, outlooks and attitudes. In particular, such an approach has alleged estimation by Kazakh historians of the process of Christianization of the local population. Some of them are inclined to consider the small number of Christening Kazakhs as evidence that the Russian Orthodox Church didn’t achieve its mission. The number of historians who think that the church didn’t achieve its mission has thousand over the last centuries, however our calculations of the number of Kazakhs who became Orthodox Christian is much more than other historians think. Such Christians can be divided into 3 groups: Some remained Christian until their deaths, others had two faiths and the third hid their true religions, having returned to their former belief. Therefore, to define the exact amount of Christening Kazakhs represented a challenge. Some data does not create a clear picture of the level of Christianization, constant and accurate was not collected. The data appearing in reports of spiritual attendants and civil authorities is not always authentic. Article purpose is illumination and the analysis missionary activity of Russian Orthodox Church in Kazakhstan. 

Dynamic Window Secured Implicit Geographic Forwarding Routing for Wireless Sensor Network

Routing security is a major concerned in Wireless Sensor Network since a large scale of unattended nodes is deployed in ad hoc fashion with no possibility of a global addressing due to a limitation of node-s memory and the node have to be self organizing when the systems require a connection with the other nodes. It becomes more challenging when the nodes have to act as the router and tightly constrained on energy and computational capabilities where any existing security mechanisms are not allowed to be fitted directly. These reasons thus increasing vulnerabilities to the network layer particularly and to the whole network, generally. In this paper, a Dynamic Window Secured Implicit Geographic Forwarding (DWSIGF) routing is presented where a dynamic time is used for collection window to collect Clear to Send (CTS) control packet in order to find an appropriate hoping node. The DWIGF is expected to minimize a chance to select an attacker as the hoping node that caused by a blackhole attack that happen because of the CTS rushing attack, which promise a good network performance with high packet delivery ratios.

Methods of Forming Informational Culture Students

Along with the basic features of students\' culture information, with its widely usage oriented on implementation of the new information technologies in educational process that determines the search for ways of pointing to the similarity of interdisciplinary connections content, aims and objectives of the study. In this regard, the article questions about students\' information culture, and also presented information about the aims and objectives of the information culture process among students. In the formation of a professional interest in relevant information, which is an opportunity to assist in informing the professional activities of the essence of effective use of interactive methods and innovative technologies in the learning process. The result of the experiment proves the effectiveness of the information culture process of students in training the system of higher education based on the credit technology. The main purpose of this paper is a comprehensive review of students\' information culture.

Effects of Capacitor Bank Defects on Harmonic Distortion and Park's Pattern Analysis in Induction Motors

Properly sized capacitor banks are connected across induction motors for several reasons including power factor correction, reducing distortions, increasing capacity, etc. Total harmonic distortion (THD) and power factor (PF) are used in such cases to quantify the improvements obtained through connection of the external capacitor banks. On the other hand, one of the methods for assessing the motor internal condition is by the use of Park-s pattern analysis. In spite of taking adequate precautionary measures, the capacitor banks may sometimes malfunction. Such a minor fault in the capacitor bank is often not apparently discernible. This may however, give rise to substantial degradation of power factor correction performance and may also damage the supply profile. The case is more severe with the fact that the Park-s pattern gets distorted due to such external capacitor faults, and can give anomalous results about motor internal fault analyses. The aim of this paper is to present simulation and hardware laboratory test results to have an understanding of the anomalies in harmonic distortion and Park-s pattern analyses in induction motors due to capacitor bank defects.

Simulation Study for Performance Comparison of Routing Protocols in Mobile Adhoc Network

Due to insufficient frequency band and tremendous growth of the mobile users, complex computation is needed for the use of resources. Long distance communication began with the introduction of telegraphs and simple coded pulses, which were used to transmit short messages. Since then numerous advances have rendered reliable transfer of information both easier and quicker. Wireless network refers to any type of computer network that is wireless, and is commonly associated with a telecommunications network whose interconnections between nodes is implemented without the use of wires. Wireless network can be broadly categorized in infrastructure network and infrastructure less network. Infrastructure network is one in which we have a base station to serve the mobile users and in the infrastructure less network is one in which no infrastructure is available to serve the mobile users this kind of networks are also known as mobile Adhoc networks. In this paper we have simulated the result for different scenarios with protocols like AODV and DSR; we simulated the result for throughput, delay and receiving traffic in the given scenario.

Detection of Linkages Between Extreme Flow Measures and Climate Indices

Large scale climate signals and their teleconnections can influence hydro-meteorological variables on a local scale. Several extreme flow and timing measures, including high flow and low flow measures, from 62 hydrometric stations in Canada are investigated to detect possible linkages with several large scale climate indices. The streamflow data used in this study are derived from the Canadian Reference Hydrometric Basin Network and are characterized by relatively pristine and stable land-use conditions with a minimum of 40 years of record. A composite analysis approach was used to identify linkages between extreme flow and timing measures and climate indices. The approach involves determining the 10 highest and 10 lowest values of various climate indices from the data record. Extreme flow and timing measures for each station were examined for the years associated with the 10 largest values and the years associated with the 10 smallest values. In each case, a re-sampling approach was applied to determine if the 10 values of extreme flow measures differed significantly from the series mean. Results indicate that several stations are impacted by the large scale climate indices considered in this study. The results allow the determination of any relationship between stations that exhibit a statistically significant trend and stations for which the extreme measures exhibit a linkage with the climate indices.

Health Risk Assessment for Sewer Workers using Bayesian Belief Networks

The sanitary sewerage connection rate becomes an important indicator of advanced cities. Following the construction of sanitary sewerages, the maintenance and management systems are required for keeping pipelines and facilities functioning well. These maintenance tasks often require sewer workers to enter the manholes and the pipelines, which are confined spaces short of natural ventilation and full of hazardous substances. Working in sewers could be easily exposed to a risk of adverse health effects. This paper proposes the use of Bayesian belief networks (BBN) as a higher level of noncarcinogenic health risk assessment of sewer workers. On the basis of the epidemiological studies, the actual hospital attendance records and expert experiences, the BBN is capable of capturing the probabilistic relationships between the hazardous substances in sewers and their adverse health effects, and accordingly inferring the morbidity and mortality of the adverse health effects. The provision of the morbidity and mortality rates of the related diseases is more informative and can alleviate the drawbacks of conventional methods.

Harmonic Reduction In Three-Phase Parallel Connected Inverter

This paper presents the design and analysis of a parallel connected inverter configuration of. The configuration consists of parallel connected three-phase dc/ac inverter. Series resistors added to the inverter output to maintain same current in each inverter of the two parallel inverters, and to reduce the circulating current in the parallel inverters to the minimum. High frequency third harmonic injection PWM (THIPWM) employed to reduce the total harmonic distortion and to make maximum use of the voltage source. DSP was used to generate the THIPWM and the control algorithm for the converter. Selected experimental results have been shown to validate the proposed system.

Dual-Link Hierarchical Cluster-Based Interconnect Architecture for 3D Network on Chip

Network on Chip (NoC) has emerged as a promising on chip communication infrastructure. Three Dimensional Integrate Circuit (3D IC) provides small interconnection length between layers and the interconnect scalability in the third dimension, which can further improve the performance of NoC. Therefore, in this paper, a hierarchical cluster-based interconnect architecture is merged with the 3D IC. This interconnect architecture significantly reduces the number of long wires. Since this architecture only has approximately a quarter of routers in 3D mesh-based architecture, the average number of hops is smaller, which leads to lower latency and higher throughput. Moreover, smaller number of routers decreases the area overhead. Meanwhile, some dual links are inserted into the bottlenecks of communication to improve the performance of NoC. Simulation results demonstrate our theoretical analysis and show the advantages of our proposed architecture in latency, throughput and area, when compared with 3D mesh-based architecture.

IFRS for SMEs: Challenge for Emerging Countries? Case of Czech Republic and Ukraine

Increase in globalization of capital markets brings the higher requirements on financial information provided for investors who look for a highly comparable information. Paper deals with the advantages and limitations of applying International Financial Reporting Standards (IFRS) in the Czech Republic and Ukraine. As a greatest limit for full adoption of IFRS shall be acknowledged the strong connection of continental accounting to tax system and enormous high administrative burden for IFRS appliers.

Thermal Analysis of the Current Path from Circuit Breakers Using Finite Element Method

This paper describes a three-dimensional thermal model of the current path included in the low voltage power circuit breakers. The model can be used to analyse the thermal behaviour of the current path during both steady-state and transient conditions. The current path lengthwise temperature distribution and timecurrent characteristic of the terminal connections of the power circuit breaker have been obtained. The influence of the electric current and voltage drop on main electric contact of the circuit breaker has been investigated. To validate the three-dimensional thermal model, some experimental tests have been done. There is a good correlation between experimental and simulation results.

LFC Design of a Deregulated Power System with TCPS Using PSO

In the LFC problem, the interconnections among some areas are the input of disturbances, and therefore, it is important to suppress the disturbances by the coordination of governor systems. In contrast, tie-line power flow control by TCPS located between two areas makes it possible to stabilize the system frequency oscillations positively through interconnection, which is also expected to provide a new ancillary service for the further power systems. Thus, a control strategy using controlling the phase angle of TCPS is proposed for provide active control facility of system frequency in this paper. Also, the optimum adjustment of PID controller's parameters in a robust way under bilateral contracted scenario following the large step load demands and disturbances with and without TCPS are investigated by Particle Swarm Optimization (PSO), that has a strong ability to find the most optimistic results. This newly developed control strategy combines the advantage of PSO and TCPS and has simple stricture that is easy to implement and tune. To demonstrate the effectiveness of the proposed control strategy a three-area restructured power system is considered as a test system under different operating conditions and system nonlinearities. Analysis reveals that the TCPS is quite capable of suppressing the frequency and tie-line power oscillations effectively as compared to that obtained without TCPS for a wide range of plant parameter changes, area load demands and disturbances even in the presence of system nonlinearities.

Dynamic Response of a Water Tower Composed of Interlocked Panels

Earthquakes produce some of the most violent loading situations that a structure can be subjected to and if a structure fails under these loads then inevitably human life is put at risk. One of the most common methods by which a structure fails under seismic loading is at the connection of structural elements. The research presented in this paper investigates the interlock systems as a novel method for building structures. The main objective of this experimental study wasto determine the dynamic characteristics and the seismic behaviour of the proposed structures compared to conventional structural systemsduring seismic motions. Results of this study indicate that the interlock mechanism of the panels influences the behaviour of lateral load-resisting systems of the structures during earthquakes, contributing to better structural flexibility and easier maintenance.

Development of Coronal Field and Solar Wind Components for MHD Interplanetary Simulations

The connection between solar activity and adverse phenomena in the Earth’s environment that can affect space and ground based technologies has spurred interest in Space Weather (SW) research. A great effort has been put on the development of suitable models that can provide advanced forecast of SW events. With the progress in computational technology, it is becoming possible to develop operational large scale physics based models which can incorporate the most important physical processes and domains of the Sun-Earth system. In order to enhance our SW prediction capabilities we are developing advanced numerical tools. With operational requirements in mind, our goal is to develop a modular simulation framework of propagation of the disturbances from the Sun through interplanetary space to the Earth. Here, we report and discuss on the development of coronal field and solar wind components for a large scale MHD code. The model for these components is based on a potential field source surface model and an empirical Wang-Sheeley-Arge solar wind relation.