Abstract: IMCS is Integrated Monitoring and Control System for
thermal power plant. This system consists of mainly two parts; controllers and OIS (Operator Interface System). These two parts are
connected by Ethernet-based communication. The controller side of communication is managed by CNet module and OIS side is managed
by data server of OIS. CNet module sends the data of controller to data
server and receives commend data from data server. To minimizes or
balance the load of data server, this module buffers data created by controller at every cycle and send buffered data to data server on request of data server. For multiple data server, this module manages
the connection line with each data server and response for each request
from multiple data server. CNet module is included in each controller
of redundant system. When controller fail-over happens on redundant system, this module can provide data of controller to data sever
without loss. This paper presents three main features – separation of get task, usage of ring buffer and monitoring communication status –of CNet module to carry out these functions.
Abstract: In this paper we propose a family of algorithms based
on 3rd and 4th order cumulants for blind single-input single-output
(SISO) Non-Minimum Phase (NMP) Finite Impulse Response (FIR)
channel estimation driven by non-Gaussian signal. The input signal
represents the signal used in 10GBASE-T (or IEEE 802.3an-2006)
as a Tomlinson-Harashima Precoded (THP) version of random
Pulse-Amplitude Modulation with 16 discrete levels (PAM-16). The
proposed algorithms are tested using three non-minimum phase
channel for different Signal-to-Noise Ratios (SNR) and for different
data input length. Numerical simulation results are presented to
illustrate the performance of the proposed algorithms.