Abstract: To improve the satisfaction of residents' travel, this paper analyzes the characteristics and influencing factors of urban residents' travel behavior. First, a Multinominal Logit Model (MNL) model is built to analyze the characteristics of residents' travel behavior, reveal the influence of individual attributes, family attributes and travel characteristics on the choice of travel mode, and identify the significant factors. Then put forward suggestions for policy improvement. Finally, Support Vector Machine (SVM) and Multi-Layer Perceptron (MLP) models are introduced to evaluate the policy effect. This paper selects Futian Street in Futian District, Shenzhen City for investigation and research. The results show that gender, age, education, income, number of cars owned, travel purpose, departure time, journey time, travel distance and times all have a significant influence on residents' choice of travel mode. Based on the above results, two policy improvement suggestions are put forward from reducing public transportation and non-motor vehicle travel time, and the policy effect is evaluated. Before the evaluation, the prediction effect of MNL, SVM and MLP models was evaluated. After parameter optimization, it was found that the prediction accuracy of the three models was 72.80%, 71.42%, and 76.42%, respectively. The MLP model with the highest prediction accuracy was selected to evaluate the effect of policy improvement. The results showed that after the implementation of the policy, the proportion of public transportation in plan 1 and plan 2 increased by 14.04% and 9.86%, respectively, while the proportion of private cars decreased by 3.47% and 2.54%, respectively. The proportion of car trips decreased obviously, while the proportion of public transport trips increased. It can be considered that the measures have a positive effect on promoting green trips and improving the satisfaction of urban residents, and can provide a reference for relevant departments to formulate transportation policies.
Abstract: Transition from tertiary level education to employment is one of the challenges that many fresh university graduates face after graduation. The transition period or the waiting time to obtain the first employment varies with the socio-economic factors and the general characteristics of a graduate. Compared to other fields of study, Arts graduates in Sri Lanka, have to wait a long time to find their first employment. The objective of this study is to identify the determinants of the transition from higher education to employment of these graduates using survival models. The study is based on a survey that was conducted in the year 2016 on a stratified random sample of Arts graduates from Sri Lankan universities who had graduated in 2012. Among the 469 responses, 36 (8%) waiting times were interval censored and 13 (3%) were right censored. Waiting time for the first employment varied between zero to 51 months. Initially, the log-rank and the Gehan-Wilcoxon tests were performed to identify the significant factors. Gender, ethnicity, GCE Advanced level English grade, civil status, university, class received, degree type, sector of first employment, type of first employment and the educational qualifications required for the first employment were significant at 10%. The Cox proportional hazards model was fitted to model the waiting time for first employment with these significant factors. All factors, except ethnicity and type of employment were significant at 5%. However, since the proportional hazard assumption was violated, the lognormal Accelerated failure time (AFT) model was fitted to model the waiting time for the first employment. The same factors were significant in the AFT model as in Cox proportional model.
Abstract: Construction industry mainly focuses on the superstructure, infrastructure, and oil and gas industry. The development of infrastructure projects in developing countries attracted a lot of foreign construction contractors, consultants, suppliers and diversified workforce to interfere and to be evolved in such huge investment. Reducing worksite delays in such projects require knowledge and attention. Therefore, it is important to identify the influencing delay attributes affecting construction projects. The significant project factors affecting construction delays were investigated. Data collection was carried out through an online web survey system to capture significant factors. Significant factors were determined with importance index and relevant recommendations are made. The output of the data analysis would lead the industry experts better assess the impact of construction delays on construction projects.
Abstract: Improving performance measures in the construction
processes has been a major concern for managers and decision
makers in the industry. They seek for ways to recognize the key
factors which have the largest effect on the process. Identifying such
factors can guide them to focus on the right parts of the process in
order to gain the best possible result. In the present study design of
experiment (DOE) has been applied to a computer simulation model
of brick laying process to determine significant factors while
productivity has been chosen as the response of the experiment. To
this end, four controllable factors and their interaction have been
experimented and the best factor level has been calculated for each
one. The results indicate that three factors, namely, labor of brick,
labor of mortar and inter arrival time of mortar along with interaction
of labor of brick and labor of mortar are significant.
Abstract: Response Surface Methodology (RSM) is a powerful
and efficient mathematical approach widely applied in the
optimization of cultivation process. Cellulase enzyme production by
Trichoderma reesei RutC30 using agricultural waste rice straw and
banana fiber as carbon source were investigated. In this work,
sequential optimization strategy based statistical design was
employed to enhance the production of cellulase enzyme through
submerged cultivation. A fractional factorial design (26-2) was applied
to elucidate the process parameters that significantly affect cellulase
production. Temperature, Substrate concentration, Inducer
concentration, pH, inoculum age and agitation speed were identified
as important process parameters effecting cellulase enzyme synthesis.
The concentration of lignocelluloses and lactose (inducer) in the
cultivation medium were found to be most significant factors. The
steepest ascent method was used to locate the optimal domain and a
Central Composite Design (CCD) was used to estimate the quadratic
response surface from which the factor levels for maximum
production of cellulase were determined.
Abstract: Response surface methodology was used for
quantitative investigation of water and solids transfer during osmotic
dehydration of beetroot in aqueous solution of salt. Effects of
temperature (25 – 45oC), processing time (30–150 min), salt
concentration (5–25%, w/w) and solution to sample ratio (5:1 – 25:1)
on osmotic dehydration of beetroot were estimated. Quadratic
regression equations describing the effects of these factors on the
water loss and solids gain were developed. It was found that effects
of temperature and salt concentrations were more significant on the
water loss than the effects of processing time and solution to sample
ratio. As for solids gain processing time and salt concentration were
the most significant factors. The osmotic dehydration process was
optimized for water loss, solute gain, and weight reduction. The
optimum conditions were found to be: temperature – 35oC,
processing time – 90 min, salt concentration – 14.31% and solution
to sample ratio 8.5:1. At these optimum values, water loss, solid gain
and weight reduction were found to be 30.86 (g/100 g initial sample),
9.43 (g/100 g initial sample) and 21.43 (g/100 g initial sample)
respectively.