Simulation Study of Lateral Trench Gate Power MOSFET on 4H-SiC

A lateral trench-gate power metal-oxide-semiconductor on 4H-SiC is proposed. The device consists of two separate trenches in which two gates are placed on both sides of P-body region resulting two parallel channels. Enhanced current conduction and reduced-surface-field effect in the structure provide substantial improvement in the device performance. Using two dimensional simulations, the performance of proposed device is evaluated and compare of with that of the conventional device for same cell pitch. It is demonstrated that the proposed structure provides two times higher output current, 11% decrease in threshold voltage, 70% improvement in transconductance, 70% reduction in specific ON-resistance, 52% increase in breakdown voltage, and nearly eight time improvement in figure-of-merit over the conventional device.

On the Operation Mechanism and Device Modeling of AlGaN/GaN High Electron Mobility Transistors (HEMTs)

In this work, the physical based device model of AlGaN/GaN high electron mobility transistors (HEMTs) has been established and the corresponding device operation behavior has been investigated also by using Sentaurus TCAD from Synopsys. Advanced AlGaN/GaN hetero-structures with GaN cap layer and AlN spacer have been considered and the GaN cap layer and AlN spacer are found taking important roles on the gate leakage blocking and off-state breakdown voltage enhancement.

An Intelligent System Framework for Generating Activity List of a Project Using WBS Mind map and Semantic Network

Work Breakdown Structure (WBS) is one of the most vital planning processes of the project management since it is considered to be the fundamental of other processes like scheduling, controlling, assigning responsibilities, etc. In fact WBS or activity list is the heart of a project and omission of a simple task can lead to an irrecoverable result. There are some tools in order to generate a project WBS. One of the most powerful tools is mind mapping which is the basis of this article. Mind map is a method for thinking together and helps a project manager to stimulate the mind of project team members to generate project WBS. Here we try to generate a WBS of a sample project involving with the building construction using the aid of mind map and the artificial intelligence (AI) programming language. Since mind map structure can not represent data in a computerized way, we convert it to a semantic network which can be used by the computer and then extract the final WBS from the semantic network by the prolog programming language. This method will result a comprehensive WBS and decrease the probability of omitting project tasks.

Nonlinear Conduction in Pure and Doped ZnO Varistors

We report here structural, mechanical and I-V characteristics of Zn1-xMxO ceramic samples with various x and M. It is found that the considered dopants does not influence the wellknown peaks related to wurtzite structure of ZnO ceramics, while the shape and size of grains are clearly affected. Average crystalline diameters, deduced from XRD are between 42 nm and 54 nm, which are 70 times lower than those obtained from SEM micrographs. Interestingly, the potential barrier could be formed by adding Cu up to 0.20, and it is completely deformed by 0.025 Ni additions. The breakdown field could be enhanced up to 4138 V/cm by 0.025 Cu additions, followed by a decrease with further increase of Cu . On the other hand a gradual decrease in VHN is reported for both dopants and their values are higher in Ni samples as compared to Cu samples. The electrical conductivity is generally improved by Ni, while addition of Cu improved it only in the over doped region (≥ 0.10). These results are discussed in terms of the difference of valency and ferromagnetic ordering for both dopants as compared to undoped sample.

New EEM/BEM Hybrid Method for Electric Field Calculation in Cable Joints

A power cable is widely used for power supply in power distributing networks and power transmission lines. Due to limitations in the production, delivery and setting up power cables, they are produced and delivered in several separate lengths. Cable itself, consists of two cable terminations and arbitrary number of cable joints, depending on the cable route length. Electrical stress control is needed to prevent a dielectric breakdown at the end of the insulation shield in both the air and cable insulation. Reliability of cable joint depends on its materials, design, installation and operating environment. The paper describes design and performance results for new modeled cable joints. Design concepts, based on numerical calculations, must be correct. An Equivalent Electrodes Method/Boundary Elements Method-hybrid approach that allows electromagnetic field calculations in multilayer dielectric media, including inhomogeneous regions, is presented.

Artificial Accelerated Ageing Test of 22 kVXLPE Cable for Distribution System Applications in Thailand

This paper presents the experimental results on artificial ageing test of 22 kV XLPE cable for distribution system application in Thailand. XLPE insulating material of 22 kV cable was sliced to 60-70 μm in thick and was subjected to ac high voltage at 23 Ôùª C, 60 Ôùª C and 75 Ôùª C. Testing voltage was constantly applied to the specimen until breakdown. Breakdown voltage and time to breakdown were used to evaluate life time of insulating material. Furthermore, the physical model by J. P. Crine for predicts life time of XLPE insulating material was adopted as life time model and was calculated in order to compare the experimental results. Acceptable life time results were obtained from Crine-s model comparing with the experimental result. In addition, fourier transform infrared spectroscopy (FTIR) for chemical analysis and scanning electron microscope (SEM) for physical analysis were conducted on tested specimens.

The Role Played by Swift Change of the Stability Characteristic of Mean Flow in Bypass Transition

The scenario of bypass transition is generally described as follows: the low-frequency disturbances in the free-stream may generate long stream-wise streaks in the boundary layer, which later may trigger secondary instability, leading to rapid increase of high-frequency disturbances. Then possibly turbulent spots emerge, and through their merging, lead to fully developed turbulence. This description, however, is insufficient in the sense that it does not provide the inherent mechanism of transition that during the transition, a large number of waves with different frequencies and wave numbers appear almost simultaneously, producing sufficiently large Reynolds stress, so the mean flow profile can change rapidly from laminar to turbulent. In this paper, such a mechanism will be figured out from analyzing DNS data of transition.