Abstract: Time base maintenance (TBM) is conventionally applied by the power utilities to maintain circuit breakers (CBs), transformers, bus bars and cables, which may result in under maintenance or over maintenance. As information and communication technology (ICT) industry develops, the maintenance policies of many power utilities have gradually changed from TBM to condition base maintenance (CBM) to improve system operating efficiency, operation cost and power supply reliability. This paper discusses the feasibility of using intelligent electronic devices (IEDs) to construct a CB CBM management platform. CBs in power substations can be monitored using IEDs with additional logic configuration and wire connections. The CB monitoring data can be sent through intranet to a control center and be analyzed and integrated by the Elipse Power Studio software. Finally, a human-machine interface (HMI) of supervisory control and data acquisition (SCADA) system can be designed to construct a CBM management platform to provide maintenance decision information for the maintenance personnel, management personnel and CB manufacturers.
Abstract: This paper deals with the conceptual design of Experimental Helium Cooling Loop (EHCL) for Indian Test Blanket Module (TBM) and its related thermal hydraulic experiments. Indian TBM team is developing Lead Lithium cooled Ceramic Breeder (IN-LLCB) TBM to be tested in ITER. The TBM box structure is cooled by high pressure (8 MPa) and high temperature (300-500C) helium gas.
The first wall of TBM made of complex channel geometry having several parallel channels carrying helium gas for efficient heat extraction. Several mock-ups of these channels need to be tested before finalizing the TBM first wall design and fabrication. Besides the individual testing of such mock-ups of breeding blanket, the testing of Pb-Li to helium heat exchanger, the operational experience of helium loop and understanding of the behavior of high pressure and high temperature system components are very essential for final development of Helium Cooling System for LLCB TBM in ITER. The main requirements and characteristics of the EHCL and its conceptual design are presented in this paper.
Abstract: The development and extension of large cities induced
a need for shallow tunnel in soft ground of building areas. Estimation
of ground settlement caused by the tunnel excavation is important
engineering point. In this paper, prediction of surface subsidence
caused by tunneling in one section of seventh line of Tehran subway
is considered. On the basis of studied geotechnical conditions of the
region, tunnel with the length of 26.9km has been excavated applying
a mechanized method using an EPB-TBM with a diameter of 9.14m.
In this regard, settlement is estimated utilizing both analytical and
numerical finite element method. The numerical method shows that
the value of settlement in this section is 5cm. Besides, the analytical
consequences (Bobet and Loganathan-Polous) are 5.29 and 12.36cm,
respectively. According to results of this study, due tosaturation of
this section, there are good agreement between Bobet and numerical
methods. Therefore, tunneling processes in this section needs a
special consolidation measurement and support system before the
passage of tunnel boring machine.
Abstract: The belief decision tree (BDT) approach is a decision
tree in an uncertain environment where the uncertainty is represented
through the Transferable Belief Model (TBM), one interpretation
of the belief function theory. The uncertainty can appear either in
the actual class of training objects or attribute values of objects to
classify. In this paper, we develop a post-pruning method of belief
decision trees in order to reduce size and improve classification
accuracy on unseen cases. The pruning of decision tree has a
considerable intention in the areas of machine learning.