Analysis of a TBM Tunneling Effect on Surface Subsidence: A Case Study from Tehran, Iran

The development and extension of large cities induced a need for shallow tunnel in soft ground of building areas. Estimation of ground settlement caused by the tunnel excavation is important engineering point. In this paper, prediction of surface subsidence caused by tunneling in one section of seventh line of Tehran subway is considered. On the basis of studied geotechnical conditions of the region, tunnel with the length of 26.9km has been excavated applying a mechanized method using an EPB-TBM with a diameter of 9.14m. In this regard, settlement is estimated utilizing both analytical and numerical finite element method. The numerical method shows that the value of settlement in this section is 5cm. Besides, the analytical consequences (Bobet and Loganathan-Polous) are 5.29 and 12.36cm, respectively. According to results of this study, due tosaturation of this section, there are good agreement between Bobet and numerical methods. Therefore, tunneling processes in this section needs a special consolidation measurement and support system before the passage of tunnel boring machine.

A New Correlation for Overall Sherwood Number in Packed Liquid-Liquid Extraction Column

Using plug flow model in conjunction with experimental solute concentration profiles, overall volumetric mass transfer coefficient based on continuous phase (Koca), in a packed liquid-liquid extraction column has been optimized. Number of 12 experiments has been done using standard system of water/acid acetic/toluene in a 6 cm diameter, 120 cm height column. Thorough consideration of influencing parameters we intended to correlate dimensionless parameters in term of overall Sherwood number which has an acceptable average error of about 15.8%.