Abstract: Sustainable economic growth is nowadays driving firms to extend toward the adoption of many green supply chain management (GSCM) solutions. However, the evaluation and selection of these solutions is a matter of concern that needs very serious decisions, involving complexity owing to the presence of various associated factors. To resolve this problem, a comparative analysis approach based on multi-criteria decision-making methods is proposed for adequate evaluation of sustainable supply chain management solutions. In the present paper, we propose an integrated decision-making model based on FAHP (Fuzzy Analytic Hierarchy Process), TOPSIS (Technique for Order of Preference by Similarity to Ideal Solution) and PROMETHEE (Preference Ranking Organisation METHod for Enrichment Evaluations) to contribute to a better understanding and development of new sustainable strategies for industrial organizations. Due to the varied importance of the selected criteria, FAHP is used to identify the evaluation criteria and assign the importance weights for each criterion, while TOPSIS and PROMETHEE methods employ these weighted criteria as inputs to evaluate and rank the alternatives. The main objective is to provide a comparative analysis based on TOPSIS and PROMETHEE processes to help make sound and reasoned decisions related to the selection problem of GSCM solution.
Abstract: Buildings cause a variety of loads on the environment due to activities performed at each stage of the building life cycle. Construction is the first stage that affects both the natural and built environments at different steps of the process, which can be defined as transportation of materials within the construction site, formation and preparation of materials on-site and the application of materials to realize the building subsystems. All of these steps require the use of technology, which varies based on the facilities that contractors and subcontractors have. Hence, environmental consequences of the construction process should be tackled by focusing on construction technology options used in every step of the process. This paper presents an environmental decision-making model for assessing on-site performances of subcontractors based on the construction technology options which they can supply. First, construction technologies, which constitute information, tools and methods, are classified. Then, environmental performance criteria are set forth related to resource consumption, ecosystem quality, and human health issues. Finally, the model is developed based on the relationships between the construction technology components and the environmental performance criteria. The Fuzzy Analytical Hierarchy Process (FAHP) method is used for weighting the environmental performance criteria according to environmental priorities of decision-maker(s), while the Technique for Order Preference by Similarity to Ideal Solution (TOPSIS) method is used for ranking on-site environmental performances of subcontractors using quantitative data related to the construction technology components. Thus, the model aims to provide an insight to decision-maker(s) about the environmental consequences of the construction process and to provide an opportunity to improve the overall environmental performance of construction sites.
Abstract: During airport planning and design stages, the major issues of capacity and safety in construction and operation of an airport need to be taken into consideration. The airside of an airport is a major and critical infrastructure that usually consists of runway(s), taxiway system, and apron(s) etc., which have to be designed according to the international standards and recommendations, and local limitations to accommodate the forecasted demands. However, in many cases, airport airsides are suffering from unexpected risks that occurred during airport operations. Therefore, safety risk assessment should be applied in the planning and design of airsides to cope with the probability of risks and their consequences, and to make decisions to reduce the risks to as low as reasonably practicable (ALARP) based on safety risk assessment. This paper presents a combination approach of Failure Modes, Effect, and Criticality Analysis (FMECA), Fuzzy Reasoning Approach (FRA), and Fuzzy Analytic Hierarchy Process (FAHP) to develop a risk analysis model for safety risk assessment. An illustrated example is used to the demonstrate risk assessment process on how the design of an airside in an airport can be analysed by using the proposed safety design risk assessment model.
Abstract: Information Technology (IT) projects are always
accompanied by various risks and because of high rate of failure in
such projects, managing risks in order to neutralize or at least
decrease their effects on the success of the project is strongly
essential. In this paper, fuzzy analytical hierarchy process (FAHP) is
exploited as a means of risk evaluation methodology to prioritize and
organize risk factors faced in IT projects. A real case of IT projects, a
project of design and implementation of an integrated information
system in a vehicle producing company in Iran is studied. Related
risk factors are identified and then expert qualitative judgments about
these factors are acquired. Translating these judgments to fuzzy
numbers and using them as an input to FAHP, risk factors are then
ranked and prioritized by FAHP in order to make project managers
aware of more important risks and enable them to adopt suitable
measures to deal with these highly devastative risks.
Abstract: A lot of computer-based methods have been developed
to assess the evacuation capability (EC) of high-rise buildings.
Because softwares are time-consuming and not proper for on scene
applications, we adopted two methods, fuzzy analytic hierarchy
process (FAHP) and technique for order preference by similarity to an
ideal solution (TOPSIS), for EC assessment of a high-rise building in
Jinan. The EC scores obtained with the two methods and the
evacuation time acquired with Pathfinder 2009 for floors 47-60 of the
building were compared with each other. The results show that FAHP
performs better than TOPSIS for EC assessment of high-rise buildings,
especially in the aspect of dealing with the effect of occupant type and
distance to exit on EC, tackling complex problem with multi-level
structure of criteria, and requiring less amount of computation.
However, both FAHP and TOPSIS failed to appropriately handle the
situation where the exit width changes while occupants are few.
Abstract: In today's day and age, one of the important topics in
information security is authentication. There are several alternatives
to text-based authentication of which includes Graphical Password
(GP) or Graphical User Authentication (GUA). These methods stems
from the fact that humans recognized and remembers images better
than alphanumerical text characters. This paper will focus on the
security aspect of GP algorithms and what most researchers have
been working on trying to define these security features and
attributes. The goal of this study is to develop a fuzzy decision model
that allows automatic selection of available GP algorithms by taking
into considerations the subjective judgments of the decision makers
who are more than 50 postgraduate students of computer science. The
approach that is being proposed is based on the Fuzzy Analytic
Hierarchy Process (FAHP) which determines the criteria weight as a
linear formula.
Abstract: In highly competitive environments, a growing
number of companies must regularly launch new products speedily
and successfully. A company-s success is based on the systematic,
conscious product designing method which meets the market
requirements and takes risks as well as resources into consideration.
Research has found that developing and launching new products are
inherently risky endeavors. Hence in this research, we aim at
introducing a risk evaluation framework for the new product
innovation process. Our framework is based on the fuzzy analytical
hierarchy process (FAHP) methodology. We have applied all the
stages of the framework on the risk evaluation process of a
pharmaceuticals company.
Abstract: To help the client to select a competent agent
construction enterprise (ACE), this study aims to investigate the
selection standards by using the Fuzzy Analytic Hierarchy Process
(FAHP) and build an evaluation mathematical model with Grey
Relational Analysis (GRA). According to the outputs of literature
review, four orderly levels are established within the model, taking the
consideration of various agent construction models in practice. Then,
the process of applying FAHP and GRA is discussed in detailed.
Finally, through a case study, this paper illustrates how to apply these
methods in getting the weights of each standard and the final
assessment result.