Abstract: This paper examines the utilization of public-private
partnerships for the building and operation of wastewater treatment
plants. Our research focuses on risk allocation in this kind of projects.
Our analysis builds on more than hundred wastewater treatment
plants built and operated through PPP projects in Aragon (Spain).
The paper illustrates the consequences of an inadequate management
of construction risk and an unsuitable transfer of demand risk in
wastewater treatment plants. It also shows that the involvement of
many public bodies at local, regional and national level further
increases the complexity of this kind of projects and make time
delays more likely.
Abstract: Durian is the flagship fruit of Mindanao and there is
an abundance of several cultivars with many confusing identities/
names.
The project was conducted to develop procedure for reliable and
rapid detection and sorting of durian planting materials. Moreover, it
is also aimed to establish specific genetic or DNA markers for routine
testing and authentication of durian cultivars in question.
The project developed molecular procedures for routine testing.
SSR primers were also screened and identified for their utility in
discriminating durian cultivars collected.
Results of the study showed the following accomplishments:
1. Twenty (29) SSR primers were selected and identified based on
their ability to discriminate durian cultivars,
2. Optimized and established standard procedure for identification
and authentication of Durian cultivars
3. Genetic profile of durian is now available at Biotech Unit
Our results demonstrate the relevance of using molecular
techniques in evaluating and identifying durian clones. The most
polymorphic primers tested in this study could be useful tools for
detecting variation even at the early stage of the plant especially for
commercial purposes. The process developed combines the efficiency
of the microsatellites development process with the optimization of
non-radioactive detection process resulting in a user-friendly protocol
that can be performed in two (2) weeks and easily incorporated into
laboratories about to start microsatellite development projects. This
can be of great importance to extend microsatellite analyses to other
crop species where minimal genetic information is currently
available. With this, the University can now be a service laboratory
for routine testing and authentication of durian clones.
Abstract: The paper tackles the topic of determining the cost of
innovation in software development projects. Innovation can be
achieved either in a planned or unplanned manner. The paper
approaches the scenarios were innovation is planned for. As a starting
point an innovative software development project is analyzed. The
project is depicted step by step as it was implemented, from inception
to delivery. Costs that are proprietary to innovation in software
development are isolated based on the author’s personal experience
in managing the above mentioned project. Innovation costs
components identified by the author are then validated using open
discussions with software development professionals and projects
managers on LinkedIn groups. In order to receive relevant feedback
only groups that focus on software development and innovation
management are targeted. Additional innovation cost components
suggested by software development professionals and projects
managers are also considered. Based on the identified cost
components an indicator is built. The indicator is meant to formalize
the process of determining the cost of innovation in a software
development project. The indicator aggregates all the innovation cost
components that are identified in the research process. The process of
calculating each cost component is also described. Conclusions are
formulated and new related research topics are submitted for debate.
Abstract: While millings materials from old pavement surface
can be an important component of cost effective maintenance
operation, their use in maintenance projects are not uniform and well
documented. This study documents the different maintenance
practices followed by four transportation districts of New Mexico
Department of Transportation (NMDOT) in an attempt to find
whether millings are being used in maintenance projects by those
districts. Based on existing literature, a questionnaire was developed
related to six common maintenance practices. NMDOT district
personal were interviewed face to face to discuss and get answers to
that questionnaire. It revealed that NMDOT districts mainly use chip
seal and patching. Other maintenance procedures such as sand seal,
scrub seal, slurry seal, and thin overlay have limited use. Two out of
four participating districts do not have any documents on chip
sealing; rather they employ the experiences of the chip seal crew. All
districts use polymer modified high float emulsion (HFE100P) for
chip seal with an application rate ranging from 0.4 to 0.56 gallons per
square yard. Chip application rate varies from 15 to 40 lb/ square
yard. State wide, the thickness of chip seal varies from 3/8'' to 1'' and
life varies from 3 to 10 years. NMDOT districts mainly use three type
of patching: pothole, dig-out and blade patch. Pothole patches are
used for small potholes and during emergency, dig-out patches are
used for all type of potholes sometimes after pothole patching, and
blade patch is used when a significant portion of the pavement is
damaged. Pothole patches last as low as three days whereas, blade
patch lasts as long as 3 years. It was observed that all participating
districts use millings in maintenance projects.
Abstract: A knowledge-based expert system with the acronym
RASPE is developed as an application tool to help decision makers in
construction companies make informed decisions about managing
risks in pipeline construction projects. Choosing to use expert
systems from all available artificial intelligence techniques is due to
the fact that an expert system is more suited to representing a
domain’s knowledge and the reasoning behind domain-specific
decisions. The knowledge-based expert system can capture the
knowledge in the form of conditional rules which represent various
project scenarios and potential risk mitigation/response actions. The
built knowledge in RASPE is utilized through the underlying
inference engine that allows the firing of rules relevant to a project
scenario into consideration. Paper provides an overview of the
knowledge acquisition process and goes about describing the
knowledge structure which is divided up into four major modules.
The paper shows one module in full detail for illustration purposes
and concludes with insightful remarks.
Abstract: Learning through creation of contextual games is a
very promising approach when undertaking interdisciplinary and
international group projects. During 2013 and 2014 the authors
organized two intensive student projects. The two projects were in
different countries and different conditions. Between them, the two
projects involved 68 students and 12 mentors from five EU countries
and from various academic disciplines. In this paper we share our
experience of these two projects and we suggest approaches that can
be utilized to strengthen the chances of succeeding in short (12-15
days long) intensive student projects.
Abstract: Enterprise Architecture (EA) Implementation
Methodologies have become an important part of EA projects.
Several implementation methodologies have been proposed, as a
theoretical and practical approach, to facilitate and support the
development of EA within an enterprise. A significant question when
facing the starting of EA implementation is deciding which
methodology to utilize. In order to answer this question, a framework
with several criteria is applied in this paper for the comparative
analysis of existing EA implementation methodologies. Five EA
implementation methodologies including: EAP, TOGAF, DODAF,
Gartner, and FEA are selected in order to compare with proposed
framework. The results of the comparison indicate that those
methodologies have not reached a sufficient maturity as whole due to
lack of consideration on requirement management, maintenance,
continuum, and complexities in their process. The framework has
also ability for the evaluation of any kind of EA implementation
methodologies.
Abstract: Inland Waterway Transportation (IWT) is playing an
important role in national transport systems, water transportation is
considered to be safe, energy efficient and environmentally friendly
mode of transport, all benefits of IWT cause national awareness
increase, for instance the Colombian government is planning to
restore the navigability of the most important river of the country, the
Magdalena’s River navigability, embrace waterway transportation in
Colombia could strength competitiveness while reduce most of the
transport externalities. However, the current situation of the
Magdalena is deplorable, the most important river of Colombia has
been abandoned for decades and the solution is beyond of a single
administrative entity. This paper analyzes the outcomes of the
Navigation And Inland Waterway Action and Development in
Europe program (NAIADES) as a prospective to develop a similar
program in Colombia with similar objectives and guidelines,
considering sustainability, guarantying the long-term future results
and adaptability of the program. Identifying stakeholders and policy
experts, a set of individual interviews were carried out; findings
support the idea of lack of integration within governmental
institutions and lack of importance in marketing promotion as
possible drawbacks on the implementation of IWT projects.
Abstract: The sub-task pattern in terms of deviations and defects
should be identified and understood in order to improve the quality of
practices in construction projects. Therefore, sub-task susceptibility
to exposure to deviations and defects has been evaluated and
classified via six classifications proposed in this study. Thirty-four
case studies of specific sub-tasks (from compression members in
constructed concrete structures) were collected from seven
construction projects in order to examine the study’s proposed
classifications. The study revealed that the sub-task has a high
sensitivity to deviation, where 91% of the cases were recorded as
deviations; however, only 19% of cases were recorded as defects.
Other findings were that the actual work during the execution process
is a high source of deviation for this sub-task (74%), while only 26%
of the source of deviation was due to both design documentation and
the actual work. These findings significantly imply that the study’s
proposed classifications could be used to determine the pattern of
each sub-task and develop proactive actions to overcome issues of
sub-task deviations and defects.
Abstract: There are several methods to monitor software
projects and the objective for monitoring is to ensure that the
software projects are developed and delivered successfully. A
performance measurement is a method that is closely associated with
monitoring and it can be scrutinized by looking at two important
attributes which are efficiency and effectiveness both of which are
factors that are important for the success of a software project.
Consequently, a successful steering is achieved by monitoring and
controlling a software project via the performance measurement
criteria and metrics. Hence, this paper is aimed at identifying the
performance measurement criteria and the metrics for monitoring the
performance of a software project by using the Goal Question
Metrics (GQM) approach. The GQM approach is utilized to ensure
that the identified metrics are reliable and useful. These identified
metrics are useful guidelines for project managers to monitor the
performance of their software projects.
Abstract: This study discovers a novel framework of individual
level technology adoption known as I-P (Individual- Privacy) towards
health information application in Smart National Identity Card. Many
countries introduced smart national identity card (SNIC) with various
applications such as health information application embedded inside
it. However, the degree to which citizens accept and use some of the
embedded applications in smart national identity remains unknown to
many governments and application providers as well. Moreover, the
factors of trust, perceived risk, Privacy concern and perceived
credibility need to be incorporated into more comprehensive models
such as extended Unified Theory of Acceptance and Use of
Technology known as UTAUT2. UTAUT2 is a mainly widespread
and leading theory up to now. This research identifies factors
affecting the citizens’ behavioural intention to use health information
application embedded in SNIC and extends better understanding on
the relevant factors that the government and the application providers
would need to consider in predicting citizens’ new technology
acceptance in the future. We propose a conceptual framework by
combining the UTAUT2 and Privacy Calculus Model constructs and
also adding perceived credibility as a new variable. The proposed
framework may provide assistance to any government planning,
decision, and policy makers involving e-government projects.
Empirical study may be conducted in the future to provide proof and
empirically validate this I-P framework.
Abstract: The work proposes a decision support methodology
for the credit risk minimization in selection of investment projects.
The methodology provides two stages of projects’ evaluation.
Preliminary selection of projects with minor credit risks is made
using the Expertons Method. The second stage makes ranking of
chosen projects using the Possibilistic Discrimination Analysis
Method. The latter is a new modification of a well-known Method of
Fuzzy Discrimination Analysis.
Abstract: The construction of a new airport or the extension of
an existing one requires massive investments and many times public
private partnerships were considered in order to make feasible such
projects. One characteristic of these projects is uncertainty with
respect to financial and environmental impacts on the medium to long
term. Another one is the multistage nature of these types of projects.
While many airport development projects have been a success, some
others have turned into a nightmare for their promoters.
This communication puts forward a new approach for airport
investment risk assessment. The approach takes explicitly into
account the degree of uncertainty in activity levels prediction and
proposes milestones for the different stages of the project for
minimizing risk. Uncertainty is represented through fuzzy dual theory
and risk management is performed using dynamic programming. An
illustration of the proposed approach is provided.
Abstract: The applicability of Net Present Value (NPV) in an
investment project is becoming more and more popular in the field
of engineering economics. The classical NPV methodology involves
only the precise and accurate data of the investment project. In the
present communication, we give a new mathematical model for NPV
which uses the concept of intuitionistic fuzzy set theory. The proposed
model is based on triangular intuitionistic fuzzy number, which may
be known as Intuitionistic Fuzzy Net Present Value (IFNPV). The
model has been applied to an example and the results are presented.
Abstract: Finnish national research project, User- and Business-oriented Suburb Renovation Concept (KLIKK), was started in January 2012 and will end in June 2014. The perspective of energy efficiency is emphasised in the project, but also it addresses what improving the energy efficiency of suburban apartment buildings means from the standpoint of architecturally valuable buildings representing different periods. The project will also test the impacts of stricter energy efficiency requirements on renovation projects.
The primary goal of the project is to develop a user-oriented, industrial, economic renovation concept for suburban apartment building renovation, extension and construction of additional storeys. The concept will make it possible to change from performance- and cost-based operation to novel service- and user-oriented, site-specifically tailored renovation methods utilizing integrated order and delivery chains.
The present project is collaborating with Ministry of the Environment and participating cities in developing a new type of lighter town planning model for suburban renovations and in-fill construction. To support this, the project will simultaneously develop practices for environmental impact assessment tools in renovation and suburban supplementary and in-fill construction.
Abstract: Preference for different conflict resolution styles is
influenced by cultural background and power distance of two parties
involving in conflict. This research put forward 7 hypotheses and
tested the preference differences of the five conflict resolution styles
between Chinese owner and contractor as well as the preference
differences concerning the same style between two parties. The
research sample includes 202 practitioners from construction
enterprises in mainland China. Research result found that theories
concerning conflict resolution styles could be applied in the Chinese
construction industry. Some results of this research were not in line
with former research, and this research also gave explanation to the
differences from the characteristics of construction projects. Based on
the findings, certain suggestions were made to serve as a guidance for
managers to choose appropriate conflict resolution styles for a better
handling of conflict.
Abstract: Seismic retrofitting of important structures is essential in seismological active zones. The importance is doubled when it comes to some buildings like schools, hospitals, bridges etc. because they are required to continue their serviceability even after a major earthquake. Generally, seismic retrofitting codes have paid little attention to retrofitting of foundations due to its construction complexity. In this paper different methods for seismic retrofitting of tall buildings’ foundations will be discussed and evaluated. Foundations are considered in three different categories. First, foundations those are in danger of liquefaction of their underlying soil. Second, foundations located on slopes in seismological active regions. Third, foundations designed according to former design codes and may show structural defects under earthquake loads. After describing different methods used in different countries for retrofitting of the existing foundations in seismological active regions, comprehensive comparison between these methods with regard to the above mentioned categories is carried out. This paper gives some guidelines to choose the best method for seismic retrofitting of tall buildings’ foundations in retrofitting projects.
Abstract: Measuring the reusability of Object-Oriented (OO) program code is important to ensure a successful and timely adaptation and integration of the reused code in new software projects. It has become even more relevant with the availability of huge amounts of open-source projects. Reuse saves cost, increases the speed of development and improves software reliability. Measuring this reusability is not s straight forward process due to the variety of metrics and qualities linked to software reuse and the lack of comprehensive empirical studies to support the proposed metrics or models. In this paper, a conceptual model is proposed to measure the reusability of OO program code. A comprehensive set of metrics is used to compute the most significant factors of reusability and an empirical investigation is conducted to measure the reusability of the classes of randomly selected open-source Java projects. Additionally, the impact of using inner and anonymous classes on the reusability of their enclosing classes is assessed. The results obtained are thoroughly analyzed to identify the factors behind lack of reusability in open-source OO program code and the impact of nesting on it.
Abstract: The new product development (NPD) literature emphasizes the importance of introducing new products on the market for continuing business success. New products are responsible for employment, economic growth, technological progress, and high standards of living. Therefore, the study of NPD and the processes through which they emerge is important. The goal of our research is to propose a framework of critical success factors, metrics, and tools and techniques for implementing metrics for each stage of the new product development (NPD) process. An extensive literature review was undertaken to investigate decades of studies on NPD success and how it can be achieved. These studies were scanned for common factors for firms that enjoyed success of new products on the market. The paper summarizes NPD success factors, suggests metrics that should be used to measure these factors, and proposes tools and techniques to make use of these metrics. This was done for each stage of the NPD process, and brought together in a framework that the authors propose should be followed for complex NPD projects. While many studies have been conducted on critical success factors for NPD, these studies tend to be fragmented and focus on one or a few phases of the NPD process.
Abstract: In this study, we analyzed the factors that affect research funds using linear regression analysis to increase the effectiveness of investments in national research projects. We collected 7,916 items of data on research projects that were in the process of being finished or were completed between 2010 and 2011. Data pre-processing and visualization were performed to derive statistically significant results. We identified factors that affected funding using analysis of fit distributions and estimated increasing or decreasing tendencies based on these factors.