Deviations and Defects of the Sub-Task’s Requirements in Construction Projects

The sub-task pattern in terms of deviations and defects should be identified and understood in order to improve the quality of practices in construction projects. Therefore, sub-task susceptibility to exposure to deviations and defects has been evaluated and classified via six classifications proposed in this study. Thirty-four case studies of specific sub-tasks (from compression members in constructed concrete structures) were collected from seven construction projects in order to examine the study’s proposed classifications. The study revealed that the sub-task has a high sensitivity to deviation, where 91% of the cases were recorded as deviations; however, only 19% of cases were recorded as defects. Other findings were that the actual work during the execution process is a high source of deviation for this sub-task (74%), while only 26% of the source of deviation was due to both design documentation and the actual work. These findings significantly imply that the study’s proposed classifications could be used to determine the pattern of each sub-task and develop proactive actions to overcome issues of sub-task deviations and defects.