Abstract: A Multi-dimensional computational fluid dynamics
(CFD) two-phase model was developed with the aim to simulate
the in-core coolant circuit of a pressurized heavy water reactor
(PHWR) of a commercial nuclear power plant (NPP). Due to the
fact that this PHWR is a Reactor Pressure Vessel type (RPV),
three-dimensional (3D) detailed modelling of the large reservoirs of
the RPV (the upper and lower plenums and the downcomer) were
coupled with an in-house finite volume one-dimensional (1D) code
in order to model the 451 coolant channels housing the nuclear fuel.
Regarding the 1D code, suitable empirical correlations for taking into
account the in-channel distributed (friction losses) and concentrated
(spacer grids, inlet and outlet throttles) pressure losses were used.
A local power distribution at each one of the coolant channels
was also taken into account. The heat transfer between the coolant
and the surrounding moderator was accurately calculated using a
two-dimensional theoretical model. The implementation of subcooled
boiling and condensation models in the 1D code along with the use
of functions for representing the thermal and dynamic properties of
the coolant and moderator (heavy water) allow to have estimations
of the in-core steam generation under nominal flow conditions for a
generic fission power distribution. The in-core mass flow distribution
results for steady state nominal conditions are in agreement with the
expected from design, thus getting a first assessment of the coupled
1/3D model. Results for nominal condition were compared with
those obtained with a previous 1/3D single-phase model getting more
realistic temperature patterns, also allowing visualize low values of
void fraction inside the upper plenum. It must be mentioned that the
current results were obtained by imposing prescribed fission power
functions from literature. Therefore, results are showed with the aim
of point out the potentiality of the developed model.
Abstract: This paper reports the viability of developing Zn-27Al
alloy matrix hybrid composites reinforced with alumina, graphite and
fly ash (solid waste bye product of coal in thermal power plants).
This research work was aimed at developing low cost-high
performance Zn-27Al matrix composite with low density. Alumina
particulates (Al2O3), graphite added with 0, 2, 3, 4 and 5 wt% fly ash
were utilized to prepare 10wt% reinforcing phase with Zn-27Al alloy
as matrix using two-step stir casting method. Density measurement,
estimated percentage porosity, tensile testing, micro hardness
measurement and optical microscopy were used to assess the
performance of the composites produced. The results show that the
hardness, ultimate tensile strength, and percent elongation of the
hybrid composites decrease with increase in fly ash content. The
maximum decrease in hardness and ultimate tensile strength of
13.72% and 15.25% respectively were observed for composite grade
containing 5wt% fly ash. The percentage elongation of composite
sample without fly ash is 8.9% which is comparable with that of the
sample containing 2wt% fly ash with percentage elongation of 8.8%.
The fracture toughness of the fly ash containing composites was
however superior to those of composites without fly ash with 5wt%
fly ash containing composite exhibiting the highest fracture
toughness. The results show that fly ash can be utilized as
complementary reinforcement in ZA-27 alloy matrix composite to
reduce cost.
Abstract: In this study, failure analysis of pipe system at a micro
hydroelectric power plant is investigated. Failure occurred at the pipe
system in the powerhouse during shut down operation of the water
flow by a valve. This locking had caused a sudden shock wave, also
called “Water-hammer effect”, resulting in noise and inside pressure
increase. After visual investigation of the effect of the shock wave on
the system, a circumference crack was observed at the pipe flange
weld region. To establish the reason for crack formation, calculations
of pressure and stress values at pipe, flange and welding seams were
carried out and concluded that safety factor was high (2.2), indicating
that no faulty design existed. By further analysis, pipe system and
hydroelectric power plant was examined. After observations it is
determined that the plant did not include a ventilation nozzle (air
trap), that prevents the system of sudden pressure increase inside the
pipes which is caused by water-hammer effect. Analyses were carried
out to identify the influence of water-hammer effect on inside
pressure increase and it was concluded that, according Jowkowsky’s
equation, shut down time is effective on inside pressure increase. The
valve closing time was uncertain but by a shut down time of even one
minute, inside pressure would increase by 7.6 bar (working pressure
was 34.6 bar). Detailed investigations were also carried out on the
assembly of the pipe-flange system by considering technical
drawings. It was concluded that the pipe-flange system was not
installed according to the instructions. Two of five weld seams were
not applied and one weld was carried out faulty. This incorrect and
inadequate weld seams resulted in; insufficient connection of the pipe
to the flange constituting a strong notch effect at weld seam regions,
increase in stress values and the decrease of strength and safety
factor.
Abstract: Main objective of this paper is to establish a link
between inertial forces of the bearings used in construction of wind
power plant and its behavior. Using bearings with lower inertial
forces has the immediate effect of decreasing inertia rotor system,
with significant results in increased energy efficiency, due to
decreased friction forces between rollers and raceways. The F.E.M.
analysis shows the appearance of uniform contact stress at the ends of
the rollers, demonstrated the necessity of production of low mass
bearings. Favorable results are expected in the economic field, by
reducing material consumption and by increasing the durability of
bearings. Using low mass bearings with hollow rollers instead of
solid rollers has an impact on working temperature, on vibrations and
noise which decrease. Implementation of types of hollow rollers of
cylindrical tubular type, instead of expensive rollers with logarithmic
profile, will bring significant inertial forces decrease with large
benefits in behavior of wind power plant.
Abstract: This paper presents the results obtained by numerical
simulation using the software ANSYS CFX-CFD for the air
pollutants dispersion in the atmosphere coming from the evacuation
of combustion gases resulting from the fuel combustion in an electric
thermal power plant. The model uses the Navier-Stokes equation to
simulate the dispersion of pollutants in the atmosphere. It is
considered as important factors in elaboration of simulation the
atmospheric conditions (pressure, temperature, wind speed, wind
direction), the exhaust velocity of the combustion gases, chimney
height and the obstacles (buildings). Using the air quality monitoring
stations it is measured the concentrations of main pollutants (SO2,
NOx and PM). The pollutants were monitored over a period of 3
months, after that the average concentration are calculated, which is
used by the software. The concentrations are: 8.915 μg/m3 (NOx),
9.587 μg/m3 (SO2) and 42 μg/m3 (PM). A comparison of test data
with simulation results demonstrated that CFX was able to describe
the dispersion of the pollutant as well the concentration of this
pollutants in the atmosphere.
Abstract: This paper represents the results of experimental work to investigate the suitability of a waste material (WM) for soft soil stabilisation. In addition, the effect of particle size distribution (PSD) of the waste material on its performance as a soil stabiliser was investigated. The WM used in this study is produced from the incineration processes in domestic energy power plant and it is available in two different grades of fineness (coarse waste material (CWM) and fine waste material (FWM)). An intermediate plasticity silty clayey soil with medium organic matter content has been used in this study. The suitability of the CWM and FWM to improve the physical and engineering properties of the selected soil was evaluated dependant on the results obtained from the consistency limits, compaction characteristics (optimum moisture content (OMC) and maximum dry density (MDD)); along with the unconfined compressive strength test (UCS). Different percentages of CWM were added to the soft soil (3, 6, 9, 12 and 15%) to produce various admixtures. Then the UCS test was carried out on specimens under different curing periods (zero, 7, 14, and 28 days) to find the optimum percentage of CWM. The optimum and other two percentages (either side of the optimum content) were used for FWM to evaluate the effect of the fineness of the WM on UCS of the stabilised soil. Results indicated that both types of the WM used in this study improved the physical properties of the soft soil where the index of plasticity (IP) was decreased significantly. IP was decreased from 21 to 13.64 and 13.10 with 12% of CWM and 15% of FWM respectively. The results of the unconfined compressive strength test indicated that 12% of CWM was the optimum and this percentage developed the UCS value from 202kPa to 500kPa for 28 days cured samples, which is equal, approximately 2.5 times the UCS value for untreated soil. Moreover, this percentage provided 1.4 times the value of UCS for stabilized soil-CWA by using FWM which recorded just under 700kPa after 28 days curing.
Abstract: In a practical power system, the power plants are not
located at the same distance from the center of loads and their fuel
costs are different. Also, under normal operating conditions, the
generation capacity is more than the total load demand and losses.
Thus, there are many options for scheduling generation. In an
interconnected power system, the objective is to find the real and
reactive power scheduling of each power plant in such a way as to
minimize the operating cost. This means that the generator’s real and
reactive powers are allowed to vary within certain limits so as to meet
a particular load demand with minimum fuel cost. This is called
optimal power flow problem. In this paper, Economic Load Dispatch
(ELD) of real power generation is considered. Economic Load
Dispatch (ELD) is the scheduling of generators to minimize total
operating cost of generator units subjected to equality constraint of
power balance within the minimum and maximum operating limits of
the generating units. In this paper, genetic algorithms are considered.
ELD solutions are found by solving the conventional load flow
equations while at the same time minimizing the fuel costs.
Abstract: In this research, TRACE model of Chinshan BWR/4
nuclear power plant (NPP) has been developed for the simulation and
analysis of ultimate response guideline (URG).The main actions of
URG are the depressurization and low pressure water injection of
reactor and containment venting. This research focuses to verify the
URG efficiency under Fukushima-like conditions. TRACE analysis
results show that the URG can keep the PCT below the criteria
1088.7 K under Fukushima-like conditions. It indicated that Chinshan
NPP was safe.
Abstract: The article presents a plasma chemical technology for
processing solid fuels, using examples of bituminous and brown
coals. Thermodynamic and experimental investigation of the
technology was made. The technology allows producing synthesis
gas from the coal organic mass and valuable components (technical
silicon, ferrosilicon, aluminum, and carbon silicon, as well as
microelements of rare metals, such as uranium, molybdenum,
vanadium, etc.) from the mineral mass. The thusly produced highcalorific
synthesis gas can be used for synthesis of methanol, as a
high-calorific reducing gas instead of blast-furnace coke as well as
power gas for thermal power plants.
Abstract: Coal is an important non-renewable energy source of
and can be associated with radioactive elements. In Figueira city,
Paraná state, Brazil, it was recorded high uranium activity near the
coal mine that supplies a local thermoelectric power plant. In this
context, the radon activity (Rn-222, produced by the Ra-226 decay in
the U-238 natural series) was evaluated in groundwater, river water
and effluents produced from the acid mine drainage in the coal reject
dumps. The samples were collected in August 2013 and in February
2014 and analyzed at LABIDRO (Laboratory of Isotope and
Hydrochemistry), UNESP, Rio Claro city, Brazil, using an alpha
spectrometer (AlphaGuard) adjusted to evaluate the mean radon
activity concentration in five cycles of 10 minutes. No radon activity
concentration above 100 Bq.L-1, which was a previous critic value
established by the World Health Organization. The average radon
activity concentration in groundwater was higher than in surface
water and in effluent samples, possibly due to the accumulation of
uranium and radium in the aquifer layers that favors the radon
trapping. The lower value in the river waters can indicate dilution and
the intermediate value in the effluents may indicate radon absorption
in the coal particles of the reject dumps. The results also indicate that
the radon activities in the effluents increase with the sample
acidification, possibly due to the higher radium leaching and the
subsequent radon transport to the drainage flow. The water samples
of Laranjinha River and Ribeirão das Pedras stream, which,
respectively, supply Figueira city and receive the mining effluent,
exhibited higher pH values upstream the mine, reflecting the acid
mine drainage discharge. The radionuclides transport indicates the
importance of monitoring their activity concentration in natural
waters due to the risks that the radioactivity can represent to human
health.
Abstract: Reflux condensation occurs in vertical channels and tubes when there is an upward core flow of vapour (or gas-vapour mixture) and a downward flow of the liquid film. The understanding of this condensation configuration is crucial in the design of reflux condensers, distillation columns, and in loss-of-coolant safety analyses in nuclear power plant steam generators. The unique feature of this flow is the upward flow of the vapour-gas mixture (or pure vapour) that retards the liquid flow via shear at the liquid-mixture interface. The present model solves the full, elliptic governing equations in both the film and the gas-vapour core flow. The computational mesh is non-orthogonal and adapts dynamically the phase interface, thus produces a sharp and accurate interface. Shear forces and heat and mass transfer at the interface are accounted for fundamentally. This modeling is a big step ahead of current capabilities by removing the limitations of previous reflux condensation models which inherently cannot account for the detailed local balances of shear, mass, and heat transfer at the interface. Discretisation has been done based on finite volume method and co-located variable storage scheme. An in-house computer code was developed to implement the numerical solution scheme. Detailed results are presented for laminar reflux condensation from steam-air mixtures flowing in vertical parallel plate channels. The results include velocity and gas mass fraction profiles, as well as axial variations of film thickness.
Abstract: The formulated problem of optimization of the
technological process of water treatment for thermal power plants is
considered in this article. The problem is of multiparametric nature.
To optimize the process, namely, reduce the amount of waste water, a
new technology was developed to reuse such water. A mathematical
model of the technology of wastewater reuse was developed.
Optimization parameters were determined. The model consists of a
material balance equation, an equation describing the kinetics of ion
exchange for the non-equilibrium case and an equation for the ion
exchange isotherm. The material balance equation includes a
nonlinear term that depends on the kinetics of ion exchange. A direct
problem of calculating the impurity concentration at the outlet of the
water treatment plant was numerically solved. The direct problem
was approximated by an implicit point-to-point computation
difference scheme. The inverse problem was formulated as relates to
determination of the parameters of the mathematical model of the
water treatment plant operating in non-equilibrium conditions. The
formulated inverse problem was solved. Following the results of
calculation the time of start of the filter regeneration process was
determined, as well as the period of regeneration process and the
amount of regeneration and wash water. Multi-parameter
optimization of water treatment process for thermal power plants
allowed decreasing the amount of wastewater by 15%.
Abstract: At present, the cascade PID control is widely used to
control the superheating temperature (main steam temperature). As
Main Steam Temperature has the characteristics of large inertia, large
time-delay and time varying, etc., conventional PID control strategy
cannot achieve good control performance. In order to overcome the
bad performance and deficiencies of main steam temperature control
system, Model Free Adaptive Control (MFAC) - P cascade control
system is proposed in this paper. By substituting MFAC in PID of the
main control loop of the main steam temperature control, it can
overcome time delays, non-linearity, disturbance and time variation.
Abstract: In this study, the performance analyses of the twenty
five Coal-Fired Power Plants (CFPPs) used for electricity generation
are carried out through various Data Envelopment Analysis (DEA)
models. Three efficiency indices are defined and pursued. During the
calculation of the operational performance, energy and non-energy
variables are used as input, and net electricity produced is used as
desired output (Model-1). CO2 emitted to the environment is used as
the undesired output (Model-2) in the computation of the pure
environmental performance while in Model-3 CO2 emissions is
considered as detrimental input in the calculation of operational and
environmental performance. Empirical results show that most of the
plants are operating in increasing returns to scale region and Mettur
plant is efficient one with regards to energy use and environment.
The result also indicates that the undesirable output effect is
insignificant in the research sample. The present study will provide
clues to plant operators towards raising the operational and
environmental performance of CFPPs.
Abstract: One of the major difficulties introduced with wind
power penetration is the inherent uncertainty in production originating
from uncertain wind conditions. This uncertainty impacts many
different aspects of power system operation, especially the balancing
power requirements. For this reason, in power system development
planing, it is necessary to evaluate the potential uncertainty in future
wind power generation. For this purpose, simulation models are
required, reproducing the performance of wind power forecasts.
This paper presents a wind power forecast error simulation models
which are based on the stochastic process simulation. Proposed
models capture the most important statistical parameters recognized
in wind power forecast error time series. Furthermore, two distinct
models are presented based on data availability. First model uses
wind speed measurements on potential or existing wind power plant
locations, while the seconds model uses statistical distribution of wind
speeds.
Abstract: Since large part of electricity is generated by using
fossil based resources, energy is an important agenda for countries. In
this context, renewable energy sources are alternative to conventional
sources due to the depletion of fossil resources, increasing awareness
of climate change and global warming concerns. Solar, wind and
hydropower energy are the main renewable energy sources. Among
of them, since installed capacity of wind power has increased
approximately eight times between 2008 - November of 2014, wind
energy is a promising source for Turkey. Furthermore, signing of
Kyoto Protocol can be accepted as a milestone for Turkey's energy
policy. Turkish Government has announced Vision 2023 (energy
targets by 2023) in 2010-2014 Strategic Plan prepared by Ministry of
Energy and Natural Resources (MENR). Energy targets in this plan
can be summarized as follows: Share of renewable energy sources in
electricity generation is 30% of total electricity generation by 2023.
Installed capacity of wind energy will be 20 GW by 2023. Other
renewable energy sources such as solar, hydropower and geothermal
are encouraged with new incentive mechanisms. Dependence on
foreign energy is reduced for sustainability and energy security. On
the other hand, since Turkey is surrounded by three coastal areas,
wind energy potential is convenient for wind power application. As
of November of 2014, total installed capacity of wind power plants is
3.51 GW and a lot of wind power plants are under construction with
capacity 1.16 GW. Turkish government also encourages the locally
manufactured equipments. In this context, one of the projects funded
by private sector, universities and TUBİTAK names as MILRES is
an important project aimed to promote the use wind energy in
electricity generation. Within this project, wind turbine with 500 kW
power has been produced and will be installed at the beginning of the
2015. After that, by using the experience obtained from the first
phase of the project, a wind turbine with 2.5 MW power will be
manufactured in an industrial scale.
Abstract: The operation of nuclear power plants involves
continuous monitoring of the environment in their area. This
monitoring is performed using a complex data acquisition system,
which collects status information about the system itself and values
of many important physical variables e.g. temperature, humidity,
dose rate etc. This paper describes a proposal and optimization of
communication that takes place in teledosimetric system between the
central control server responsible for the data processing and storing
and the decentralized measuring stations, which are measuring the
physical variables. Analyzes of ongoing communication were
performed and consequently the optimization of the system
architecture and communication was done.
Abstract: Electricity is recognized as fundamental to
industrialization and improving the quality of life of the people.
Harnessing the immense untapped hydropower potential in Tripura
region opens avenues for growth and provides an opportunity to
improve the well-being of the people of the region, while making
substantial contribution to the national economy. Gumti hydro power
plant generates power to mitigate the crisis of power in Tripura,
India. The first unit of hydro power plant (5MW) was commissioned
in June 1976 & another two units of 5 MW was commissioned
simultaneously. But out of 15MW capacity at present only 8MW-
9MW power is produced from Gumti hydro power plant during rainy
season. But during lean season the production reduces to 0.5MW due
to shortage of water. Now, it is essential to implement some
mitigation measures so that the further atrocities can be prevented
and originality will be possible to restore. The decision making
ability of the Analytic Hierarchy Process (AHP) and Concordance
Analysis Techniques (CAT) are utilized to identify the better decision
or solution to the present problem. Some related attributes are
identified by the method of surveying within the experts and the
available reports and literatures. Similar criteria are removed and
ultimately seven relevant ones are identified. All the attributes are
compared with each other and rated accordingly to their importance
over the other with the help of Pair wise Comparison Matrix. In the
present investigation different mitigation measures are identified and
compared to find the best suitable alternative which can solve the
present uncertainties involving the existence of the Gumti Hydro
Power Plant.
Abstract: This article describes the information system for
measuring and evaluating the dose rate in the environment of nuclear
power plants Mochovce and Bohunice in Slovakia.
The article presents the results achieved in the implementation of
the EU project – Research of monitoring and evaluation of nonstandard
conditions in the area of nuclear power plants. The
objectives included improving the system of acquisition, measuring
and evaluating data with mobile and autonomous units applying new
knowledge from research.
The article provides basic and specific features of the system and
compared to the previous version of the system, also new functions.
Abstract: Kuosheng nuclear power plant (NPP) is a BWR/6 type
NPP and located on the northern coast of Taiwan. First, Kuosheng
NPP TRACE model were developed in this research. In order to assess
the system response of Kuosheng NPP TRACE model, startup tests
data were used to evaluate Kuosheng NPP TRACE model. Second, the
overpressurization transient analysis of Kuosheng NPP TRACE model
was performed. Besides, in order to confirm the mechanical property
and integrity of fuel rods, FRAPTRAN analysis was also performed in
this study.