Abstract: The purpose of this paper is to contribute to the
enhancement of a hydroelectric plant protection by coordinating
protection measures / existing security and introducing new measures
under a risk management process. In addition, plan identifies key
critical elements of a hydroelectric plant, from its level vulnerabilities
and threats it is subjected to in order to achieve the necessary
protection measures to reduce the level of risk.
Abstract: In this study, failure analysis of pipe system at a micro
hydroelectric power plant is investigated. Failure occurred at the pipe
system in the powerhouse during shut down operation of the water
flow by a valve. This locking had caused a sudden shock wave, also
called “Water-hammer effect”, resulting in noise and inside pressure
increase. After visual investigation of the effect of the shock wave on
the system, a circumference crack was observed at the pipe flange
weld region. To establish the reason for crack formation, calculations
of pressure and stress values at pipe, flange and welding seams were
carried out and concluded that safety factor was high (2.2), indicating
that no faulty design existed. By further analysis, pipe system and
hydroelectric power plant was examined. After observations it is
determined that the plant did not include a ventilation nozzle (air
trap), that prevents the system of sudden pressure increase inside the
pipes which is caused by water-hammer effect. Analyses were carried
out to identify the influence of water-hammer effect on inside
pressure increase and it was concluded that, according Jowkowsky’s
equation, shut down time is effective on inside pressure increase. The
valve closing time was uncertain but by a shut down time of even one
minute, inside pressure would increase by 7.6 bar (working pressure
was 34.6 bar). Detailed investigations were also carried out on the
assembly of the pipe-flange system by considering technical
drawings. It was concluded that the pipe-flange system was not
installed according to the instructions. Two of five weld seams were
not applied and one weld was carried out faulty. This incorrect and
inadequate weld seams resulted in; insufficient connection of the pipe
to the flange constituting a strong notch effect at weld seam regions,
increase in stress values and the decrease of strength and safety
factor.
Abstract: Energy generated by the force of water in hydropower
can provide a more sustainable, non-polluting alternative to fossil
fuels, along with other renewable sources of energy, such as wind,
solar and tidal power, bio energy and geothermal energy. Small scale
hydroelectricity in Iran is well suited for “off-grid" rural electricity
applications, while other renewable energy sources, such as wind,
solar and biomass, can be beneficially used as fuel for pumping
groundwater for drinking and small scale irrigation in remote rural
areas or small villages. Small Hydro Power plants in Iran have very
low operating and maintenance costs because they consume no fossil
or nuclear fuel and do not involve high temperature processes. The
equipment is relatively simple to operate and maintain. Hydropower
equipment can adjust rapidly to load changes. The extended
equipment life provides significant economic advantages. Some
hydroelectric plants installed 100 years ago still operate reliably. The
Polkolo river is located on Karun basin at southwest of Iran. Situation
and conditions of Polkolo river are evaluated for construction of
small hydropower in this article. The topographical conditions and
the existence of permanent water from springs provide the suitability
to install hydroelectric power plants on the river Polkolo. The
cascade plant consists of 9 power plants connected with each other
and is having the total head as 1100m and discharge about 2.5cubic
meter per second. The annual production of energy is 105.5 million
kwh.
Abstract: A bond graph model of a hydroelectric plant is
proposed. In order to analyze the system some structural properties
of a bond graph are used. The structural controllability of
the hydroelctric plant is described. Also, the steady state of the
state variables applying the bond graph in a derivative causality
assignment is obtained. Finally, simulation results of the system
are shown.