Abstract: Brass terminal, one of the several crude oil and
petroleum products storage/handling facilities in the Niger Delta was
built in the 1980s. Activities at this site, over the years, released
crude oil into this 3 m-deep, 1500 m-long canal lying adjacent to the
terminal with oil floating on it and its sediment heavily polluted. To
ensure effective clean-up, three major activities were planned: site
characterization, bioremediation pilot plant construction and testing
and full-scale bioremediation of contaminated sediment / bank soil by
land farming. The canal was delineated into 12 lots and each
characterized, with reference to the floating oily phase, contaminated
sediment and canal bank soil. As a result of site characterization, a
pilot plant for on-site bioremediation was designed and a treatment
basin constructed for carrying out pilot bioremediation test.
Following a designed sampling protocol, samples from this pilot
plant were collected for analysis at two laboratories as a quality
assurance / quality control check. Results showed that Brass Canal
upstream is contaminated with dark, thick and viscous oily film with
characteristic hydrocarbon smell while downstream, thin oily film
interspersed with water was observed. Sediments were observed to be
dark with mixture of brownish sandy soil with TPH ranging from
17,800 mg/kg in Lot 1 to 88,500 mg/kg in Lot 12 samples. Brass
Canal bank soil was observed to be sandy from ground surface to 3m,
below ground surface (bgs) it was silty-sandy and brownish while
subsurface soil (4-10m bgs) was sandy-clayey and whitish/grayish
with typical hydrocarbon smell. Preliminary results obtained so far
have been very promising but were proprietary. This project is
considered, to the best of technical literature knowledge, the first
large-scale on-site bioremediation project in the Niger Delta region,
Nigeria.
Abstract: This paper examines the utilization of public-private
partnerships for the building and operation of wastewater treatment
plants. Our research focuses on risk allocation in this kind of projects.
Our analysis builds on more than hundred wastewater treatment
plants built and operated through PPP projects in Aragon (Spain).
The paper illustrates the consequences of an inadequate management
of construction risk and an unsuitable transfer of demand risk in
wastewater treatment plants. It also shows that the involvement of
many public bodies at local, regional and national level further
increases the complexity of this kind of projects and make time
delays more likely.
Abstract: Durian is the flagship fruit of Mindanao and there is
an abundance of several cultivars with many confusing identities/
names.
The project was conducted to develop procedure for reliable and
rapid detection and sorting of durian planting materials. Moreover, it
is also aimed to establish specific genetic or DNA markers for routine
testing and authentication of durian cultivars in question.
The project developed molecular procedures for routine testing.
SSR primers were also screened and identified for their utility in
discriminating durian cultivars collected.
Results of the study showed the following accomplishments:
1. Twenty (29) SSR primers were selected and identified based on
their ability to discriminate durian cultivars,
2. Optimized and established standard procedure for identification
and authentication of Durian cultivars
3. Genetic profile of durian is now available at Biotech Unit
Our results demonstrate the relevance of using molecular
techniques in evaluating and identifying durian clones. The most
polymorphic primers tested in this study could be useful tools for
detecting variation even at the early stage of the plant especially for
commercial purposes. The process developed combines the efficiency
of the microsatellites development process with the optimization of
non-radioactive detection process resulting in a user-friendly protocol
that can be performed in two (2) weeks and easily incorporated into
laboratories about to start microsatellite development projects. This
can be of great importance to extend microsatellite analyses to other
crop species where minimal genetic information is currently
available. With this, the University can now be a service laboratory
for routine testing and authentication of durian clones.
Abstract: The arsenic and iron environments in different growth
stages have been studied with EXAFS and XANES using
Brookhaven Synchrotron Light Source. Collard Greens plants were
grown and tissue samples were harvested. The project studied the
EXAFS and XANES of tissue samples using As and Fe K-edges. The
Fe absorption and the Fourier transform bond length information
were used as a control comparison. The Fourier transform of the
XAFS data revealed the coexistence of As (III) and As (V) in the As
bonding environment inside the studied plant tissue samples,
although the soil only had As (III). The data suggests that Collard
Greens has a novel pathway to handle arsenic absorption in soil.
Abstract: The aim of this paper is to present the concept of an
agile enterprise model and to initiate discussion on the research
assumptions of the model presented. The implementation of the
research project "The agility of enterprises in the process of adapting
to the environment and its changes" began in August 2014 and is
planned to last three years. The article has the form of a work-inprogress
paper which aims to verify and initiate a debate over the
proposed research model. In the literature there are very few
publications relating to research into agility; it can be concluded that
the most controversial issue in this regard is the method of measuring
agility. In previous studies the operationalization of agility was often
fragmentary, focusing only on selected areas of agility, for example
manufacturing, or analysing only selected sectors. As a result the
measures created to date can only be treated as contributory to the
development of precise measurement tools. This research project
aims to fill a cognitive gap in the literature with regard to the
conceptualization and operationalization of an agile company. Thus,
the original contribution of the author of this project is the
construction of a theoretical model that integrates manufacturing
agility (consisting mainly in adaptation to the environment) and
strategic agility (based on proactive measures). The author of this
research project is primarily interested in the attributes of an agile
enterprise which indicate that the company is able to rapidly adapt to
changing circumstances and behave pro-actively.
Abstract: The problems arising from unbalanced data sets
generally appear in real world applications. Due to unequal class
distribution, many researchers have found that the performance of
existing classifiers tends to be biased towards the majority class. The
k-nearest neighbors’ nonparametric discriminant analysis is a method
that was proposed for classifying unbalanced classes with good
performance. In this study, the methods of discriminant analysis are
of interest in investigating misclassification error rates for classimbalanced
data of three diabetes risk groups. The purpose of this
study was to compare the classification performance between
parametric discriminant analysis and nonparametric discriminant
analysis in a three-class classification of class-imbalanced data of
diabetes risk groups. Data from a project maintaining healthy
conditions for 599 employees of a government hospital in Bangkok
were obtained for the classification problem. The employees were
divided into three diabetes risk groups: non-risk (90%), risk (5%),
and diabetic (5%). The original data including the variables of
diabetes risk group, age, gender, blood glucose, and BMI were
analyzed and bootstrapped for 50 and 100 samples, 599 observations
per sample, for additional estimation of the misclassification error
rate. Each data set was explored for the departure of multivariate
normality and the equality of covariance matrices of the three risk
groups. Both the original data and the bootstrap samples showed nonnormality
and unequal covariance matrices. The parametric linear
discriminant function, quadratic discriminant function, and the
nonparametric k-nearest neighbors’ discriminant function were
performed over 50 and 100 bootstrap samples and applied to the
original data. Searching the optimal classification rule, the choices of
prior probabilities were set up for both equal proportions (0.33: 0.33:
0.33) and unequal proportions of (0.90:0.05:0.05), (0.80: 0.10: 0.10)
and (0.70, 0.15, 0.15). The results from 50 and 100 bootstrap samples
indicated that the k-nearest neighbors approach when k=3 or k=4 and
the defined prior probabilities of non-risk: risk: diabetic as 0.90:
0.05:0.05 or 0.80:0.10:0.10 gave the smallest error rate of
misclassification. The k-nearest neighbors approach would be
suggested for classifying a three-class-imbalanced data of diabetes
risk groups.
Abstract: Evolutionary optimization methods such as genetic
algorithms have been used extensively for the construction site layout
problem. More recently, ant colony optimization algorithms, which
are evolutionary methods based on the foraging behavior of ants,
have been successfully applied to benchmark combinatorial
optimization problems. This paper proposes a formulation of the site
layout problem in terms of a sequencing problem that is suitable for
solution using an ant colony optimization algorithm.
In the construction industry, site layout is a very important
planning problem. The objective of site layout is to position
temporary facilities both geographically and at the correct time such
that the construction work can be performed satisfactorily with
minimal costs and improved safety and working environment. During
the last decade, evolutionary methods such as genetic algorithms
have been used extensively for the construction site layout problem.
This paper proposes an ant colony optimization model for
construction site layout. A simple case study for a highway project is
utilized to illustrate the application of the model.
Abstract: Roadway planning and design is a very complex
process involving five key phases before a project is completed;
planning, project development, final design, right-of-way, and
construction. The planning phase for a new roadway transportation
project is a very critical phase as it greatly affects all latter phases of
the project. A location study is usually performed during the
preliminary planning phase in a new roadway project. The objective
of the location study is to develop alignment alternatives that are cost
efficient considering land acquisition and construction costs. This
paper describes a methodology to develop optimal preliminary
roadway alignments utilizing spatial-data. Four optimization criteria
are taken into consideration; roadway length, land cost, land slope,
and environmental impacts. The basic concept of the methodology is
to convert the proposed project area into a grid, which represents the
search space for an optimal alignment. The aforementioned
optimization criteria are represented in each of the grid’s cells. A
spatial-data optimization technique is utilized to find the optimal
alignment in the search space based on the four optimization criteria.
Two case studies for new roadway projects in Duval County in the
State of Florida are presented to illustrate the methodology. The
optimization output alignments are compared to the proposed Florida
Department of Transportation (FDOT) alignments. The comparison is
based on right-of-way costs for the alignments. For both case studies,
the right-of-way costs for the developed optimal alignments were
found to be significantly lower than the FDOT alignments.
Abstract: This work sets out to debate the tensions involved in
the processes of contamination and self-purification in the urban
space, particularly in the streams that run through the Buenos Aires
metropolitan area. For much of their course, those streams are piped;
their waters do not come into contact with the outdoors until they
have reached deeply impoverished urban areas with high levels of
environmental contamination. These are peripheral zones that, until
thirty years ago, were marshlands and fields. They are now densely
populated areas largely lacking in urban infrastructure.
The Cárcova neighborhood, where this project is underway, is in
the José León Suárez section of General San Martín county, Buenos
Aires province. A stretch of José León Suarez canal crosses the
neighborhood. Starting upstream, this canal carries pollutants due to
the sewage and industrial waste released into it. Further downstream,
in the neighborhood, domestic drainage is poured into the stream. In
this paper, we formulate a hypothesis diametrical to the one that
holds that these neighborhoods are the primary source of
contamination, suggesting instead that in the stretch of the canal that
runs through the neighborhood the stream’s waters are actually
cleaned and the sediments accumulate pollutants. Indeed, the
stretches of water that runs through these neighborhoods act as water
processing plants for the metropolis.
This project has studied the different organic-load polluting
contributions to the water in a certain stretch of the canal, the
reduction of that load over the course of the canal, and the
incorporation of pollutants into the sediments. We have found that
the surface water has considerable ability to self-purify, mostly due to
processes of sedimentation and adsorption. The polluting load is
accumulated in the sediments where that load stabilizes slowly by
means of anaerobic processes. In this study, we also investigated the
risks of sediment management and the use of the processes studied
here in controlled conditions as tools of environmental restoration.
Abstract: Public-private partnerships (PPP) arrangements have
been extensively used in Canada, where the participation of private
companies in financing and managing infrastructure projects has
increased significantly in the last decade, particularly in the
transportation sector. This paper analyses the evolution of the PPP
market for transportation projects in Canada and examines the
participation of Spanish developers in this market, which have been
particularly successful in winning PPP contracts during the last
decade.
Abstract: The following article presents Technology Centre of
Ostrava (TCO) in the Czech Republic describing the structure and
main research areas realized by the project ENET - Energy Units for
Utilization of non Traditional Energy Sources. More details are
presented from the research program dealing with transformation,
accumulation and distribution of electric energy. Technology Centre
has its own energy mix consisting of alternative sources of fuel
sources that use of process gases from the storage part and also the
energy from distribution network. The article will be focus on the
properties and application possibilities SiC semiconductor devices for
power semiconductor converter for photovoltaic systems.
Abstract: Every year, a considerable amount of money is being
invested on research, mainly in the form of funding allocated to
universities and research institutes. To better distribute the available
funds and to set the most proper R&D investment strategies for the
future, evaluation of the productivity of the funded researchers and
the impact of such funding is crucial. In this paper, using the data on
15 years of journal publications of the NSERC (Natural Sciences and
Engineering research Council of Canada) funded researchers and by
means of bibliometric analysis, the scientific development of the
funded researchers and their scientific collaboration patterns will be
investigated in the period of 1996-2010. According to the results it
seems that there is a positive relation between the average level of
funding and quantity and quality of the scientific output. In addition,
whenever funding allocated to the researchers has increased, the
number of co-authors per paper has also augmented. Hence, the
increase in the level of funding may enable researchers to get
involved in larger projects and/or scientific teams and increase their
scientific output respectively.
Abstract: PhilSHORE is a multi-site, multi-device and multicriteria
decision support tool designed to support the development of
tidal current energy in the Philippines. Its platform is based on
Geographic Information Systems (GIS) which allows for the
collection, storage, processing, analyses and display of geospatial
data. Combining GIS tools with open source web development
applications, PhilSHORE becomes a webGIS-based marine spatial
planning tool. To date, PhilSHORE displays output maps and graphs
of power and energy density, site suitability and site-device analysis.
It enables stakeholders and the public easy access to the results of
tidal current energy resource assessments and site suitability
analyses. Results of the initial development show that PhilSHORE is
a promising decision support tool for ORE project developments.
Abstract: The purpose of the paper is to examine the most
critical and important factor which will affect the implementation of
Total Quality Management (TQM) in the construction industry in the
United Arab Emirates. It also examines the most effected Project
outcome from implementing TQM. A framework was also proposed
depending on the literature studies. The method used in this paper is a
quantitative study. A survey with a sample of 60 respondents was
created and distributed in a construction company in Abu Dhabi,
which includes 15 questions to examine the most critical factor that
will affect the implementation of TQM in addition to the most
effected project outcome from implementing TQM. The survey
showed that management commitment is the most important factor in
implementing TQM in a construction company. Also it showed that
Project cost is most effected outcome from the implementation of
TQM.
Management commitment is very important for implementing
TQM in any company. If the management loose interest in quality
then everyone in the organization will do so. The success of TQM
will depend mostly on the top of the pyramid. Also cost is reduced
and money is saved when the project team implement TQM. While if
no quality measures are present within the team, the project will
suffer a commercial failure.
Based on literature, more factors can be examined and added to
the model. In addition, more construction companies could be
surveyed in order to obtain more accurate results. Also this study
could be conducted outside the United Arab Emirates for further
enchantment.
Abstract: Availability of different genetic tests after completion
of Human Genome Project increases the physicians’ responsibility to
keep themselves update on the potential implementation of these
genetic tests in their daily practice. However, due to numbers of
barriers, still many of physicians are not either aware of these tests or
are not willing to offer or refer their patients for genetic tests. This
study was conducted an anonymous, cross-sectional, mailed-based
survey to develop a primary data of Malaysian physicians’ level of
knowledge and perception of gene profiling. Questionnaire had 29
questions. Total scores on selected questions were used to assess the
level of knowledge. The highest possible score was 11. Descriptive
statistics, one way ANOVA and chi-squared test was used for
statistical analysis. Sixty three completed questionnaires were
returned by 27 general practitioners (GPs) and 36 medical specialists.
Responders’ age ranges from 24 to 55 years old (mean 30.2 ± 6.4).
About 40% of the participants rated themselves as having poor level
of knowledge in genetics in general whilst 60% believed that they
have fair level of knowledge; however, almost half (46%) of the
respondents felt that they were not knowledgeable about available
genetic tests. A majority (94%) of the responders were not aware of
any lab or company which is offering gene profiling services in
Malaysia. Only 4% of participants were aware of using gene profiling
for detection of dosage of some drugs. Respondents perceived greater
utility of gene profiling for breast cancer (38%) compared to the
colorectal familial cancer (3%). The score of knowledge ranged from
2 to 8 (mean 4.38 ± 1.67). Non- significant differences between score
of knowledge of GPs and specialists were observed, with score of
4.19 and 4.58 respectively. There was no significant association
between any demographic factors and level of knowledge. However,
those who graduated between years 2001 to 2005 had higher level of
knowledge. Overall, 83% of participants showed relatively high level
of perception on value of gene profiling to detect patient’s risk of
disease. However, low perception was observed for both statements
of using gene profiling for general population in order to alter their
lifestyle (25%) as well as having the full sequence of a patient
genome for the purpose of determining a patient’s best match for
treatment (18%). The lack of clinical guidelines, limited provider
knowledge and awareness, lack of time and resources to educate
patients, lack of evidence-based clinical information and cost of tests
were the most barriers of ordering gene profiling mentioned by
physicians. In conclusion Malaysian physicians who participate in
this study had mediocre level of knowledge and awareness in gene
profiling. The low exposure to the genetic questions and problems
might be a key predictor of lack of awareness and knowledge on
available genetic tests. Educational and training workshop might be useful in helping Malaysian physicians incorporate genetic profiling
into practice for eligible patients.
Abstract: This paper presents a part of the project solving which
is dedicated to the identification of the hazardous waste with the most
critical production within the Czech Republic with the aim to study
and find the optimal composition of the cement matrix that will
ensure maximum content disposal of chosen hazardous waste. In the
first stage of project solving – which represents this paper – a specific
hazardous waste was chosen, its properties were identified and
suitable solidification agents were chosen. Consequently
solidification formulas and testing methodology was proposed.
Abstract: In our research we aimed to test a managerial
approach for the fuzzy front end (FFE) of innovation by creating
controlled experiment/ business case in a breakthrough innovation
development. The experiment was in the sport industry and covered
all aspects of the customer discovery stage from ideation to
prototyping followed by patent application. In the paper we describe
and analyze mile stones, tasks, management challenges, decisions
made to create the break through innovation, evaluate overall
managerial efficiency that was at the considered FFE stage.
We set managerial outcome of the FFE stage as a valid product
concept in hand. In our paper we introduce hypothetical construct
“Q-factor” that helps us in the experiment to distinguish quality of
FFE outcomes.
The experiment simulated for entrepreneur the FFE of innovation
and put on his shoulders responsibility for the outcome of valid
product concept. While developing managerial approach to reach the
outcome there was a decision to look on product concept from the
cognitive psychology and cognitive science point of view. This view
helped us to develop the profile of a person whose projection (mental
representation) of a new product could optimize for a manager or
entrepreneur FFE activities. In the experiment this profile was tested
to develop breakthrough innovation for swimmers. Following the
managerial approach the product concept was created to help
swimmers to feel/sense water. The working prototype was developed
to estimate the product concept validity and value added effect for
customers.
Based on feedback from coachers and swimmers there were strong
positive effect that gave high value for customers, and for the
experiment – the valid product concept being developed by proposed
managerial approach for the FFE.
In conclusions there is a suggestion of managerial approach that
was derived from experiment.
Abstract: A model was constructed to predict the amount of
solar radiation that will make contact with the surface of the earth in
a given location an hour into the future. This project was supported
by the Southern Company to determine at what specific times during
a given day of the year solar panels could be relied upon to produce
energy in sufficient quantities. Due to their ability as universal
function approximators, an artificial neural network was used to
estimate the nonlinear pattern of solar radiation, which utilized
measurements of weather conditions collected at the Griffin, Georgia
weather station as inputs. A number of network configurations and
training strategies were utilized, though a multilayer perceptron with
a variety of hidden nodes trained with the resilient propagation
algorithm consistently yielded the most accurate predictions. In
addition, a modeled direct normal irradiance field and adjacent
weather station data were used to bolster prediction accuracy. In later
trials, the solar radiation field was preprocessed with a discrete
wavelet transform with the aim of removing noise from the
measurements. The current model provides predictions of solar
radiation with a mean square error of 0.0042, though ongoing efforts
are being made to further improve the model’s accuracy.
Abstract: This paper describes an Action Research project
which was undertaken to inform professional practice in order to
develop a newly created Centre for Student Success in the specific
context of transnational medical and nursing education in the Middle
East. The objectives were to enhance the academic performance,
persistence, integration and personal and professional development of
a multinational study body, in particular in relation to pre-clinical
medical students, and to establish a comfortable, friendly and
student-driven environment within an Irish medical university
recently established in Bahrain. The outcomes of the project resulted
in the development of a specific student success ‘signature’ for this
particular transnational higher education context.
Abstract: Flash Floods, together with landslides, are a common
natural threat for people living in mountainous regions and foothills.
One way to deal with this constant menace is the use of Early
Warning Systems, which have become a very important mitigation
strategy for natural disasters.
In this work we present our proposal for a pilot Flash Flood Early
Warning System for Santiago, Chile, the first stage of a more
ambitious project that in a future stage shall also include early
warning of landslides.
To give a context for our approach, we first analyze three existing
Flash Flood Early Warning Systems, focusing on their general
architectures. We then present our proposed system, with main focus
on the decision support system, a system that integrates empirical
models and fuzzy expert systems to achieve reliable risk estimations.