Abstract: Batch production plants provide a wide range of
scheduling problems. In pharmaceutical industries a batch process
is usually described by a recipe, consisting of an ordering of tasks
to produce the desired product. In this research work we focused
on pharmaceutical production processes requiring the culture of
a microorganism population (i.e. bacteria, yeasts or antibiotics).
Several sources of uncertainty may influence the yield of the culture
processes, including (i) low performance and quality of the cultured
microorganism population or (ii) microbial contamination. For
these reasons, robustness is a valuable property for the considered
application context. In particular, a robust schedule will not collapse
immediately when a cell of microorganisms has to be thrown away
due to a microbial contamination. Indeed, a robust schedule should
change locally in small proportions and the overall performance
measure (i.e. makespan, lateness) should change a little if at all.
In this research work we formulated a constraint programming
optimization (COP) model for the robust planning of antibiotics
production. We developed a discrete-time model with a multi-criteria
objective, ordering the different criteria and performing a
lexicographic optimization. A feasible solution of the proposed
COP model is a schedule of a given set of tasks onto available
resources. The schedule has to satisfy tasks precedence constraints,
resource capacity constraints and time constraints. In particular
time constraints model tasks duedates and resource availability
time windows constraints. To improve the schedule robustness, we
modeled the concept of (a, b) super-solutions, where (a, b) are input
parameters of the COP model. An (a, b) super-solution is one in
which if a variables (i.e. the completion times of a culture tasks)
lose their values (i.e. cultures are contaminated), the solution can be
repaired by assigning these variables values with a new values (i.e.
the completion times of a backup culture tasks) and at most b other
variables (i.e. delaying the completion of at most b other tasks).
The efficiency and applicability of the proposed model is
demonstrated by solving instances taken from a real-life
pharmaceutical company. Computational results showed that
the determined super-solutions are near-optimal.
Abstract: The efficient and economic allocation of resources is
one main goal in the field of production planning and control.
Nowadays, a new variable gains in importance throughout the
planning process: Energy. Energy-efficiency has already been widely
discussed in literature, but with a strong focus on reducing the overall
amount of energy used in production. This paper provides a brief
systematic approach, how energy-supply-orientation can be used for
an energy-cost-efficient production planning and thus combining the
idea of energy-efficiency and energy-flexibility.
Abstract: This paper presents a state-of-the-art survey of the
operations research models developed for internal audit planning.
Two alternative approaches have been followed in the literature for
audit planning: (1) identifying the optimal audit frequency; and (2)
determining the optimal audit resource allocation. The first approach
identifies the elapsed time between two successive audits, which can
be presented as the optimal number of audits in a given planning
horizon, or the optimal number of transactions after which an audit
should be performed. It also includes the optimal audit schedule. The
second approach determines the optimal allocation of audit frequency
among all auditable units in the firm. In our review, we discuss both
the deterministic and probabilistic models developed for audit
planning. In addition, game theory models are reviewed to find the
optimal auditing strategy based on the interactions between the
auditors and the clients.
Abstract: The study is in application and analysis of two tourism
management tools that can contribute to making public managers
decision: the Barometer of Tourism Sustainability (BTS) and the
Ecological Footprint (EF). The results have shown that BTS allows
you to have an integrated view of the tourism system, awakening to
the need for planning of appropriate actions so that it can achieve the
positive scale proposed (potentially sustainable). Already the
methodology of ecological tourism footprint is an important tool to
measure potential impacts generated by tourism to tourist reality.
Abstract: The paper provides a comprehensive analysis of the
sustainable development in the Belgrade Metropolitan Region - BMA
(level NUTS 2) preliminary evaluating the three chosen components:
1) economic growth and developmental changes; 2) competitiveness;
and 3) territorial concentration and industrial specialization. First, we
identified the main results of development changes and economic
growth by applying Shift-share analysis on the metropolitan level.
Second, the empirical evaluation of competitiveness in the BMA is
based on the analysis of absolute and relative values of eight
indicators by Spider method. Paper shows that the consideration of
the national share, industrial mix and metropolitan/regional share in
total Shift share of the BMA, as well as economic/functional
specialization of the BMA indicate very strong process of
deindustrialization. Allocative component of the BMA economic
growth has positive value, reflecting the above-average sector
productivity compared to the national average. Third, the important
positive role of metropolitan/regional component in decomposition of
the BMA economic growth is highlighted as one of the key results.
Finally, comparative analysis of the industrial territorial
concentration in the BMA in relation to Serbia is based on location
quotient (LQ) or Balassa index as a valid measure. The results
indicate absolute and relative differences in decrease of industry
territorial concentration as well as inefficiency of utilizing territorial
capital in the BMA. Results are important for the increase of regional
competitiveness and territorial distribution in this area as well as for
improvement of sustainable metropolitan and sector policies,
planning and governance on this level.
Abstract: Socio-economic development, which is seen around
the world today, has contributed to the emergence of new problems
of a social nature. Different political, historical, geographical or
economic conditions cause that, in addition to global issues of social
policy such as an aging population, unemployment, migration,
countries, regions, there are also specific new problems that require
diagnosis, individualized approach and efficient, planned solutions.
These should include, among others, digital addiction, peer violence,
obesity among children, the problem of ‘legal highs’, stress,
depression, diseases associated with environmental pollution etc. The
central authorities, selected most often with the tools specific to
representative democracy, that is, the general election, for many
reasons, inter alia, organizational, communication, are not able to
effectively diagnose their intensity, territorial distribution, and thus to
effectively fight them. This article aims to show how in Poland,
citizens influence solving problems related to the broader social
policy implemented at the local government level and indicates the
possibilities of improving those solutions. The conclusions of
theoretical analysis have been supported by empirical studies, which
tested the use of instruments of participatory democracy in the
planning and creation of communal strategies for solving social
problems in one of the Polish voivodeships.
Abstract: Floorplanning plays a vital role in the physical design
process of Very Large Scale Integrated (VLSI) chips. It is an
essential design step to estimate the chip area prior to the optimized
placement of digital blocks and their interconnections. Since VLSI
floorplanning is an NP-hard problem, many optimization techniques
were adopted in the literature. In this work, a music-inspired
Harmony Search (HS) algorithm is used for the fixed die outline
constrained floorplanning, with the aim of reducing the total chip
area. HS draws inspiration from the musical improvisation process of
searching for a perfect state of harmony. Initially, B*-tree is used to
generate the primary floorplan for the given rectangular hard
modules and then HS algorithm is applied to obtain an optimal
solution for the efficient floorplan. The experimental results of the
HS algorithm are obtained for the MCNC benchmark circuits.
Abstract: This paper proposes a novel heuristic algorithm that aims to determine the best size and location of distributed generators in unbalanced distribution networks. The proposed heuristic algorithm can deal with the planning cases where power loss is to be optimized without violating the system practical constraints. The distributed generation units in the proposed algorithm is modeled as voltage controlled node with the flexibility to be converted to constant power factor node in case of reactive power limit violation. The proposed algorithm is implemented in MATLAB and tested on the IEEE 37 -node feeder. The results obtained show the effectiveness of the proposed algorithm.
Abstract: This paper reviews the model-based qualitative and
quantitative Operations Management research in the context of
Construction Supply Chain Management (CSCM). Construction
industry has been traditionally blamed for low productivity, cost and
time overruns, waste, high fragmentation and adversarial
relationships. The construction industry has been slower than other
industries to employ the Supply Chain Management (SCM) concept
and develop models that support the decision-making and planning.
However the last decade there is a distinct shift from a project-based
to a supply-based approach of construction management. CSCM
comes up as a new promising management tool of construction
operations and improves the performance of construction projects in
terms of cost, time and quality. Modeling the Construction Supply
Chain (CSC) offers the means to reap the benefits of SCM, make
informed decisions and gain competitive advantage. Different
modeling approaches and methodologies have been applied in the
multi-disciplinary and heterogeneous research field of CSCM. The
literature review reveals that a considerable percentage of the CSC
modeling research accommodates conceptual or process models
which present general management frameworks and do not relate to
acknowledged soft Operations Research methods. We particularly
focus on the model-based quantitative research and categorize the
CSCM models depending on their scope, objectives, modeling
approach, solution methods and software used. Although over the last
few years there has been clearly an increase of research papers on
quantitative CSC models, we identify that the relevant literature is
very fragmented with limited applications of simulation,
mathematical programming and simulation-based optimization. Most
applications are project-specific or study only parts of the supply
system. Thus, some complex interdependencies within construction
are neglected and the implementation of the integrated supply chain
management is hindered. We conclude this paper by giving future
research directions and emphasizing the need to develop optimization
models for integrated CSCM. We stress that CSC modeling needs a
multi-dimensional, system-wide and long-term perspective. Finally,
prior applications of SCM to other industries have to be taken into
account in order to model CSCs, but not without translating the
generic concepts to the context of construction industry.
Abstract: To solve these problems, we investigated the management system of heating enterprise, including strategic planning based on the balanced scorecard (BSC), quality management in accordance with the standards of the Quality Management System (QMS) ISO 9001 and analysis of the system based on expert judgment using fuzzy inference. To carry out our work we used the theory of fuzzy sets, the QMS in accordance with ISO 9001, BSC, method of construction of business processes according to the notation IDEF0, theory of modeling using Matlab software simulation tools and graphical programming LabVIEW. The results of the work are as follows: We determined possibilities of improving the management of heat-supply plant-based on QMS; after the justification and adaptation of software tool it has been used to automate a series of functions for the management and reduction of resources and for the maintenance of the system up to date; an application for the analysis of the QMS based on fuzzy inference has been created with novel organization of communication software with the application enabling the analysis of relevant data of enterprise management system.
Abstract: In this study, the pedestrian simulation VISWALK
integration and application platform ant algorithms written program
made to construct a renovation engineering schedule planning mode.
The use of simulation analysis platform construction site when the user
running the simulation, after calculating the user walks in the case of
construction delays, the ant algorithm to find out the minimum delay
time schedule plan, and add volume and unit area deactivated loss of
business computing, and finally to the owners and users of two
different positions cut considerations pick out the best schedule
planning. To assess and validate its effectiveness, this study
constructed the model imported floor of a shopping mall floor
renovation engineering cases. Verify that the case can be found from
the mode of the proposed project schedule planning program can
effectively reduce the delay time and the user's walking mall loss of
business, the impact of the operation on the renovation engineering
facilities in the building to a minimum.
Abstract: This paper addresses a cutting edge method of
business demand forecasting, based on an empirical probability
function when the historical behavior of the data is random.
Additionally, it presents error determination based on the numerical
method technique ‘propagation of errors.’ The methodology was
conducted characterization and process diagnostics demand planning
as part of the production management, then new ways to predict its
value through techniques of probability and to calculate their mistake
investigated, it was tools used numerical methods. All this based on
the behavior of the data. This analysis was determined considering
the specific business circumstances of a company in the sector of
communications, located in the city of Bogota, Colombia. In
conclusion, using this application it was possible to obtain the
adequate stock of the products required by the company to provide its
services, helping the company reduce its service time, increase the
client satisfaction rate, reduce stock which has not been in rotation
for a long time, code its inventory, and plan reorder points for the
replenishment of stock.
Abstract: In order to address construction project requirements
and specifications, scholars and practitioners need to establish
taxonomy according to a scheme that best fits their need. While
existing characterization methods are continuously being improved,
new ones are devised to cover project properties which have not been
previously addressed. One such method, the Project Definition Rating
Index (PDRI), has received limited consideration strictly as a
classification scheme. Developed by the Construction Industry
Institute (CII) in 1996, the PDRI has been refined over the last two
decades as a method for evaluating a project's scope definition
completeness during front-end planning (FEP). The main
contribution of this study is a review of practical project classification
methods, and a discussion of how PDRI can be used to classify
projects based on their readiness in the FEP phase. The proposed
model has been applied to 59 construction projects in Ontario, and
the results are discussed.
Abstract: The Speexx results revealed four main factors
affecting the success of 190 Thai sophomores as follows: 1) Future
English training should be pursued in applied Speexx development.
2) Thai students didn’t see the benefit of having an Online Language
Training Program. 3) There is a great need to educate the next
generation of learners on the benefits of Speexx within the
community. 4) A great majority of Thai Sophomores didn't know
what Speexx was.
A guideline for self-reliance planning consisted of four aspects: 1)
Development planning: by arranging groups to further improve
English abilities with the Speexx Language Training program and
encourage using Speexx into every day practice. Local communities
need to develop awareness of the usefulness of Speexx and share the
value of using the program among family and friends. 2) Humanities
and Social Science staff should develop skills using this Online
Language Training Program to expand on the benefits of Speexx
within their departments. 3) Further research should be pursued on
the Thai Students progression with Speexx and how it helps them
improve their language skills with Business English. 4) University’s
and Language centers should focus on using Speexx to encourage
learning for any language, not just English.
Abstract: In this contribution two approaches for calculating
optimal trajectories for highly automated vehicles are presented and
compared. The first one is based on a non-linear vehicle model, used
for evaluation. The second one is based on a simplified model and
can be implemented on a current ECU. In usual driving situations
both approaches show very similar results.
Abstract: Quantitative radiobiological models can be used to
assess the optimum clinical outcome from sophisticated therapeutic
modalities by calculating tumor control probability (TCP) and normal
tissue complication probability (NTCP). In this study two 3D-CRT
and an IMRT treatment plans were developed with an initial
prescription dose of 60 Gy in 2 Gy/fraction to prostate. Sensitivity of
TCP and Complication free tumor control probability (P+) to the
different values of α/β ratio was investigated for various prescription
doses planned to be delivered in either a fixed number of fractions (I)
or in a fixed dose per fraction (II) in each of the three different
treatment plans. High dose/fraction and high α/β value result in
comparatively smaller P+ and IMRT plans resulted in the highest P+,
mainly due to the decrease in NTCP. If α/β is lower than expected,
better tumor control can be achieved by increasing dose/fraction but
decreasing the number of fractions.
Abstract: One of the most famous techniques which affect the
efficiency of a production line is the assembly line balancing (ALB)
technique. This paper examines the balancing effect of a whole
production line of a real auto glass manufacturer in three steps. In the
first step, processing time of each activity in the workstations is
generated according to a practical approach. In the second step, the
whole production process is simulated and the bottleneck stations
have been identified, and finally in the third step, several
improvement scenarios are generated to optimize the system
throughput, and the best one is proposed. The main contribution of
the current research is the proposed framework which combines two
famous approaches including Assembly Line Balancing and
Optimization via Simulation technique (OvS). The results show that
the proposed framework could be applied in practical environments,
easily.
Abstract: Evolutionary optimization methods such as genetic
algorithms have been used extensively for the construction site layout
problem. More recently, ant colony optimization algorithms, which
are evolutionary methods based on the foraging behavior of ants,
have been successfully applied to benchmark combinatorial
optimization problems. This paper proposes a formulation of the site
layout problem in terms of a sequencing problem that is suitable for
solution using an ant colony optimization algorithm.
In the construction industry, site layout is a very important
planning problem. The objective of site layout is to position
temporary facilities both geographically and at the correct time such
that the construction work can be performed satisfactorily with
minimal costs and improved safety and working environment. During
the last decade, evolutionary methods such as genetic algorithms
have been used extensively for the construction site layout problem.
This paper proposes an ant colony optimization model for
construction site layout. A simple case study for a highway project is
utilized to illustrate the application of the model.
Abstract: An efficient remanufacturing network lead to an
efficient design of sustainable manufacturing enterprise. In
remanufacturing network, products are collected from the customer
zone, disassembled and remanufactured at a suitable remanufacturing
facility. In this respect, another issue to consider is how the returned
product to be remanufactured, in other words, what is the best layout
for such facility. In order to achieve a sustainable manufacturing
system, Cellular Manufacturing System (CMS) designs are highly
recommended, CMSs combine high throughput rates of line layouts
with the flexibility offered by functional layouts (job shop).
Introducing the CMS while designing a remanufacturing network will
benefit the utilization of such a network. This paper presents and
analyzes a comprehensive mathematical model for the design of
Dynamic Cellular Remanufacturing Systems (DCRSs). In this paper,
the proposed model is the first one to date that considers CMS and
remanufacturing system simultaneously. The proposed DCRS model
considers several manufacturing attributes such as multi period
production planning, dynamic system reconfiguration, duplicate
machines, machine capacity, available time for workers, worker
assignments, and machine procurement, where the demand is totally
satisfied from a returned product. A numerical example is presented
to illustrate the proposed model.
Abstract: Roadway planning and design is a very complex
process involving five key phases before a project is completed;
planning, project development, final design, right-of-way, and
construction. The planning phase for a new roadway transportation
project is a very critical phase as it greatly affects all latter phases of
the project. A location study is usually performed during the
preliminary planning phase in a new roadway project. The objective
of the location study is to develop alignment alternatives that are cost
efficient considering land acquisition and construction costs. This
paper describes a methodology to develop optimal preliminary
roadway alignments utilizing spatial-data. Four optimization criteria
are taken into consideration; roadway length, land cost, land slope,
and environmental impacts. The basic concept of the methodology is
to convert the proposed project area into a grid, which represents the
search space for an optimal alignment. The aforementioned
optimization criteria are represented in each of the grid’s cells. A
spatial-data optimization technique is utilized to find the optimal
alignment in the search space based on the four optimization criteria.
Two case studies for new roadway projects in Duval County in the
State of Florida are presented to illustrate the methodology. The
optimization output alignments are compared to the proposed Florida
Department of Transportation (FDOT) alignments. The comparison is
based on right-of-way costs for the alignments. For both case studies,
the right-of-way costs for the developed optimal alignments were
found to be significantly lower than the FDOT alignments.