Abstract: Networks can be utilized to represent project planning problems, using nodes for activities and arcs to indicate precedence relationship between them. For fixed activity duration, a simple algorithm calculates the amount of time required to complete a project, followed by the activities that comprise the critical path. Program Evaluation and Review Technique (PERT) generalizes the above model by incorporating uncertainty, allowing activity durations to be random variables, producing nevertheless a relatively crude solution in planning problems. In this paper, based on the findings of the relevant literature, which strongly suggests that a Beta distribution can be employed to model earthmoving activities, we utilize Monte Carlo simulation, to estimate the project completion time distribution and measure the influence of skewness, an element inherent in activities of modern technical projects. We also extract the activity criticality index, with an ultimate goal to produce more accurate planning estimations.
Abstract: This paper reviews the model-based qualitative and
quantitative Operations Management research in the context of
Construction Supply Chain Management (CSCM). Construction
industry has been traditionally blamed for low productivity, cost and
time overruns, waste, high fragmentation and adversarial
relationships. The construction industry has been slower than other
industries to employ the Supply Chain Management (SCM) concept
and develop models that support the decision-making and planning.
However the last decade there is a distinct shift from a project-based
to a supply-based approach of construction management. CSCM
comes up as a new promising management tool of construction
operations and improves the performance of construction projects in
terms of cost, time and quality. Modeling the Construction Supply
Chain (CSC) offers the means to reap the benefits of SCM, make
informed decisions and gain competitive advantage. Different
modeling approaches and methodologies have been applied in the
multi-disciplinary and heterogeneous research field of CSCM. The
literature review reveals that a considerable percentage of the CSC
modeling research accommodates conceptual or process models
which present general management frameworks and do not relate to
acknowledged soft Operations Research methods. We particularly
focus on the model-based quantitative research and categorize the
CSCM models depending on their scope, objectives, modeling
approach, solution methods and software used. Although over the last
few years there has been clearly an increase of research papers on
quantitative CSC models, we identify that the relevant literature is
very fragmented with limited applications of simulation,
mathematical programming and simulation-based optimization. Most
applications are project-specific or study only parts of the supply
system. Thus, some complex interdependencies within construction
are neglected and the implementation of the integrated supply chain
management is hindered. We conclude this paper by giving future
research directions and emphasizing the need to develop optimization
models for integrated CSCM. We stress that CSC modeling needs a
multi-dimensional, system-wide and long-term perspective. Finally,
prior applications of SCM to other industries have to be taken into
account in order to model CSCs, but not without translating the
generic concepts to the context of construction industry.
Abstract: In an urban area the determination of transportation routes should be planned so as to minimize the provoked pollution taking into account the cost of such routes. In the sequel these routes are cited as pollution routes.
The transportation network is expressed by a weighted graph G=(V,E,D,P) where every vertex represents a location to be served and E contains unordered pairs (edges) of elements in V that indicate a simple road. The distances / cost and a weight that depict the provoked air pollution by a vehicle transition at every road are assigned to each road as well. These are the items of set D and P respectively.
Furthermore the investigated pollution routes must not exceed predefined corresponding values concerning the route cost and the route pollution level during the vehicle transition.
In this paper we present an algorithm that generates such routes in order that the decision maker selects the most appropriate one.