Abstract: Small signal stability causes small perturbations in the
generator that can cause instability in the power network. It is
generally known that small signal stability are directly related to the
generator and load properties. This paper examines the effects of
generator input variations on power system oscillations for a small
signal stability study. Eigenvaules and eigenvectors are used to
examine the stability of the power system. The dynamic power
system's mathematical model is constructed and thus calculated using
load flow and small signal stability toolbox on MATLAB. The power
system model is based on a 3-machine 9-bus system that was
modified to suit this study. In this paper, Participation Factors are a
means to gauge the effects of variation in generation with other
parameters on the network are also incorporated.
Abstract: Bond Graph as a unified multidisciplinary tool is widely
used not only for dynamic modelling but also for Fault Detection and
Isolation because of its structural and causal proprieties. A binary
Fault Signature Matrix is systematically generated but to make the
final binary decision is not always feasible because of the problems
revealed by such method. The purpose of this paper is introducing a
methodology for the improvement of the classical binary method of
decision-making, so that the unknown and identical failure signatures
can be treated to improve the robustness. This approach consists of
associating the evaluated residuals and the components reliability data
to build a Hybrid Bayesian Network. This network is used in two
distinct inference procedures: one for the continuous part and the
other for the discrete part. The continuous nodes of the network are
the prior probabilities of the components failures, which are used by
the inference procedure on the discrete part to compute the posterior
probabilities of the failures. The developed methodology is applied
to a real steam generator pilot process.
Abstract: This article presents a performance comparison of an
interior mounted permanent magnet synchronous generator (IPMSG)
with a synchronous reluctance generator (SynRG) with the same size
for a wind application. It is found that using the same geometrical
dimensions, a SynRG can convert 74 % of the power that an IPMSG
can convert, while it has 80% of the IPMSG weight. Moreover it is
found that the efficieny for the IMPSG is 99% at rated power
compared to 98.7% for the SynRG.
Abstract: Measurements of capacitance C and dissipation
factor tand of the stator insulation system provide useful information
about internal defects within the insulation. The index k is defined as
the proportionality constant between the changes at high voltage of
capacitance DC and of the dissipation factor Dtand . DC and
Dtand values were highly correlated when small flat defects were
within the insulation and that correlation was lost in the presence of
large narrow defects like electrical treeing. The discrimination
between small and large defects is made resorting to partial discharge
PD phase angle analysis. For the validation of the results, C and tand
measurements were carried out in a 15MVA 4160V steam turbine
turbogenerator placed in a sugar mill. In addition, laboratory test
results obtained by other authors were analyzed jointly. In such
laboratory tests, model coil bars subjected to thermal cycling resulted
highly degraded and DC and Dtand values were not correlated. Thus,
the index k could not be calculated.
Abstract: Power system stabilizers (PSS) are now routinely used in the industry to damp out power system oscillations. In this paper, particle swarm optimization (PSO) technique is applied to design a robust power system stabilizer (PSS). The design problem of the proposed controller is formulated as an optimization problem and PSO is employed to search for optimal controller parameters. By minimizing the time-domain based objective function, in which the deviation in the oscillatory rotor speed of the generator is involved; stability performance of the system is improved. The non-linear simulation results are presented under wide range of operating conditions; disturbances at different locations as well as for various fault clearing sequences to show the effectiveness and robustness of the proposed controller and their ability to provide efficient damping of low frequency oscillations. Further, all the simulations results are compared with a conventionally designed power system stabilizer to show the superiority of the proposed design approach.
Abstract: Nowadays, desalination of salt water is considered an important industrial process. In many parts of the world, particularly in the gulf countries, the multi-stage flash (MSF) water desalination has an essential contribution in the production of fresh water. In this study, a simple mathematical model is defined to design a MSF desalination system and the feasibility of using the MSF desalination process in proximity of a 42 MW power plant is investigated. This power plant can just provide 10 ton/h superheated steam from low pressure (LP) section of heat recovery steam generator (HRSG) for thermal desalting system. The designed MSF system with gained output ratio (GOR) of 10.3 has 24 flashing stages and can produce 2480 ton/d of fresh water. The expected performance characteristics of the designed MSF desalination plant are determined. In addition, the effect of motive water pressure on the amount of non-condensable gases removed by water jet vacuum pumps is investigated.
Abstract: In this paper an analysis of blackouts in electric power
transmission systems is implemented using a model and studied in
simple networks with a regular topology. The proposed model
describes load demand and network improvements evolving on a
slow timescale as well as the fast dynamics of cascading overloads
and outages.
Abstract: Optical 3D measurement of objects is meaningful in
numerous industrial applications. In various cases shape acquisition
of weak textured objects is essential. Examples are repetition parts
made of plastic or ceramic such as housing parts or ceramic bottles as
well as agricultural products like tubers. These parts are often
conveyed in a wobbling way during the automated optical inspection.
Thus, conventional 3D shape acquisition methods like laser scanning
might fail. In this paper, a novel approach for acquiring 3D shape of
weak textured and moving objects is presented. To facilitate such
measurements an active stereo vision system with structured light is
proposed. The system consists of multiple camera pairs and auxiliary
laser pattern generators. It performs the shape acquisition within one
shot and is beneficial for rapid inspection tasks. An experimental
setup including hardware and software has been developed and
implemented.
Abstract: To minimize power losses, it is important to
determine the location and size of local generators to be placed in
unbalanced power distribution systems. On account of some inherent
features of unbalanced distribution systems, such as radial structure,
large number of nodes, a wide range of X/R ratios, the conventional
techniques developed for the transmission systems generally fail on
the determination of optimum size and location of distributed
generators (DGs). This paper presents a simple method for
investigating the problem of contemporaneously choosing best
location and size of DG in three-phase unbalanced radial distribution
system (URDS) for power loss minimization and to improve the
voltage profile of the system. Best location of the DG is determined
by using voltage index analysis and size of DG is computed by
variational technique algorithm according to available standard size
of DGs. This paper presents the results of simulations for 25-bus and
IEEE 37- bus Unbalanced Radial Distribution system.
Abstract: This paper focuses on developing an integrated
reliable and sophisticated model for ultra large wind turbines And to
study the performance and analysis of vector control on large wind
turbines. With the advance of power electronics technology, direct
driven multi-pole radial flux PMSG (Permanent Magnet Synchronous
Generator) has proven to be a good choice for wind turbines
manufacturers. To study the wind energy conversion systems, it is
important to develop a wind turbine simulator that is able to produce
realistic and validated conditions that occur in real ultra MW wind
turbines. Three different packages are used to simulate this model,
namely, Turbsim, FAST and Simulink. Turbsim is a Full field wind
simulator developed by National Renewable Energy Laboratory
(NREL). The wind turbine mechanical parts are modeled by FAST
(Fatigue, Aerodynamics, Structures and Turbulence) code which is
also developed by NREL. Simulink is used to model the PMSG, full
scale back to back IGBT converters, and the grid.
Abstract: A novel circuit for generating a signal embedded with
features about data from three sensors is presented. This suggested
circuit is making use of a resistance-to-time converter employing a
bridge amplifier, an integrator and a comparator. The second resistive
sensor (Rz) is transformed into duty cycle. Another bridge with
varying resistor, (Ry) in the feedback of an OP AMP is added in
series to change the amplitude of the resulting signal in a proportional
relationship while keeping the same frequency and duty cycle
representing proportional changes in resistors Rx and Rz already
mentioned. The resultant output signal carries three types of
information embedded as variations of its frequency, duty cycle and
amplitude.
Abstract: This paper will discuss about an active power generator scheduling method in order to increase the limit level of steady state systems. Some power generator optimization methods such as Langrange, PLN (Indonesian electricity company) Operation, and the proposed Z-Thevenin-based method will be studied and compared in respect of their steady state aspects. A method proposed in this paper is built upon the thevenin equivalent impedance values between each load respected to each generator. The steady state stability index obtained with the REI DIMO method. This research will review the 500kV-Jawa-Bali interconnection system. The simulation results show that the proposed method has the highest limit level of steady state stability compared to other optimization techniques such as Lagrange, and PLN operation. Thus, the proposed method can be used to create the steady state stability limit of the system especially in the peak load condition.
Abstract: In this paper, a fiber based Fabry-Perot interferometer
is proposed and demonstrated for a non-contact displacement
measurement. A piece of micro-prism which attached to the
mechanical vibrator is served as the target reflector. Interference
signal is generated from the superposition between the sensing beam
and the reference beam within the sensing arm of the fiber sensor.
This signal is then converted to the displacement value by using a
developed program written in visual Cµ programming with a
resolution of λ/8. A classical function generator is operated for
controlling the vibrator. By fixing an excitation frequency of 100 Hz
and varying the excitation amplitude range of 0.1 – 3 Volts, the
output displacements measured by the fiber sensor are obtained from
1.55 μm to 30.225 μm. A reference displacement sensor with a
sensitivity of ~0.4 μm is also employed for comparing the
displacement errors between both sensors. We found that over the
entire displacement range, a maximum and average measurement
error are obtained of 0.977% and 0.44% respectively.
Abstract: A numbers of important developments have led to an
increasing attractiveness for very high speed electrical machines
(either motor or generator). Specifically the increasing switching
speed of power electronics, high energy magnets, high strength
retaining materials, better high speed bearings and improvements in
design analysis are the primary drivers in a move to higher speed. The
design challenges come in the mechanical design both in terms of
strength and resonant modes and in the electromagnetic design
particularly in respect of iron losses and ac losses in the various
conducting parts including the rotor. This paper describes detailed
design work which has been done on a 50,000 rpm, 50kW permanent
magnet( PM) synchronous machine. It describes work on
electromagnetic and rotor eddy current losses using a variety of
methods including both 2D finite element analysis
Abstract: This research aimed to develop plasma system used in air conditioners. This developed plasma system could be installed in the air conditioners - all split type. The quality of air could be improved to be equal to present plasma system. Development processes were as follows: 1) to study the plasma system used in the air conditioners, 2) to design a plasma generator, 3) to develop the plasma generator, and 4) to test its performance in many types of the air conditioners. This plasma system was developed by AC high voltage – 14 kv with a frequency of 50 kHz. Carbon was a conductor to generate arc in air purifier system. The research was tested by installing the plasma generator in the air conditioners - wall type. Whereas, there were 3 types of installations: air flow out, air flow in, and room center. The result of the plasma generator installed in the air conditioners, split type, revealed that the air flow out installation provided the highest average of o-zone at 223 mg/h. This type of installation provided the highest efficiency of air quality improvement. Moreover, the air flow in installation and the room center installation provided the average of the o-zone at 163 mg/h and 64 mg/h, respectively.
Abstract: Meshing is the process of discretizing problem
domain into many sub domains before the numerical calculation can
be performed. One of the most popular meshes among many types of meshes is tetrahedral mesh, due to their flexibility to fit into almost
any domain shape. In both 2D and 3D domains, triangular and tetrahedral meshes can be generated by using Delaunay triangulation.
The quality of mesh is an important factor in performing any Computational Fluid Dynamics (CFD) simulations as the results is
highly affected by the mesh quality. Many efforts had been done in
order to improve the quality of the mesh. The paper describes a mesh
generation routine which has been developed capable of generating
high quality tetrahedral cells in arbitrary complex geometry. A few
test cases in CFD problems are used for testing the mesh generator.
The result of the mesh is compared with the one generated by a
commercial software. The results show that no sliver exists for the
meshes generated, and the overall quality is acceptable since the percentage of the bad tetrahedral is relatively small. The boundary
recovery was also successfully done where all the missing faces are
rebuilt.
Abstract: This paper discusses a genetic algorithm (GA) based optimal load shedding that can apply for electrical distribution networks with and without dispersed generators (DG). Also, the proposed method has the ability for considering constant and variable capacity deficiency caused by unscheduled outages in the bulked generation and transmission system of bulked power supply. The genetic algorithm (GA) is employed to search for the optimal load shedding strategy in distribution networks considering DGs in two cases of constant and variable modelling of bulked power supply of distribution networks. Electrical power distribution systems have a radial network and unidirectional power flows. With the advent of dispersed generations, the electrical distribution system has a locally looped network and bidirectional power flows. Therefore, installed DG in the electrical distribution systems can cause operational problems and impact on existing operational schemes. Introduction of DGs in electrical distribution systems has introduced many new issues in operational and planning level. Load shedding as one of operational issue has no exempt. The objective is to minimize the sum of curtailed load and also system losses within the frame-work of system operational and security constraints. The proposed method is tested on a radial distribution system with 33 load points for more practical applications.
Abstract: This paper proposes the method combining artificial
neural network (ANN) with particle swarm optimization (PSO) to
implement the maximum power point tracking (MPPT) by controlling
the rotor speed of the wind generator. First, the measurements of wind
speed, rotor speed of wind power generator and output power of wind
power generator are applied to train artificial neural network and to
estimate the wind speed. Second, the method mentioned above is
applied to estimate and control the optimal rotor speed of the wind
turbine so as to output the maximum power. Finally, the result reveals
that the control system discussed in this paper extracts the maximum
output power of wind generator within the short duration even in the
conditions of wind speed and load impedance variation.
Abstract: The article deals with pneumatic and hot wire
anemometry measurement on subsonic axi-symmetric air ejector.
Performances of the ejector with and without pulsations of primary
flow are compared, measuring of characteristic pressures and mass
flow rates are performed and ejector efficiency is evaluated. The
pulsations of primary flow are produced by a synthetic jet generator,
which is placed in the supply line of the primary flow just in front of
the primary nozzle. The aim of the pulsation is to intensify the
mixing process. In the article we present: Pressure measuring of
pulsation on the mixing chamber wall, behind the mixing chamber
and behind the diffuser measured by fast pressure transducers and
results of hot wire anemometry measurement. It was found out that
using of primary flow pulsations yields higher back pressure behind
the ejector and higher efficiency. The processes in this ejector and
influences of primary flow pulsations on the mixing processes are
described.
Abstract: Recently, distributed generation technologies have received much attention for the potential energy savings and reliability assurances that might be achieved as a result of their widespread adoption. Fueling the attention have been the possibilities of international agreements to reduce greenhouse gas emissions, electricity sector restructuring, high power reliability requirements for certain activities, and concern about easing transmission and distribution capacity bottlenecks and congestion. So it is necessary that impact of these kinds of generators on distribution feeder reconfiguration would be investigated. This paper presents an approach for distribution reconfiguration considering Distributed Generators (DGs). The objective function is summation of electrical power losses A Tabu search optimization is used to solve the optimal operation problem. The approach is tested on a real distribution feeder.