Abstract: In recent years, maintenance optimization has attracted special attention due to the growth of industrial systems complexity. Maintenance costs are high for many systems, and preventive maintenance is effective when it increases operations' reliability and safety at a reduced cost. The novelty of this research is to consider general repair in the modeling of multi-unit series systems and solve the maintenance problem for such systems using the semi-Markov decision process (SMDP) framework. We propose an opportunistic maintenance policy for a series system composed of two main units. Unit 1, which is more expensive than unit 2, is subjected to condition monitoring, and its deterioration is modeled using a gamma process. Unit 1 hazard rate is estimated by the proportional hazards model (PHM), and two hazard rate control limits are considered as the thresholds of maintenance interventions for unit 1. Maintenance is performed on unit 2, considering an age control limit. The objective is to find the optimal control limits and minimize the long-run expected average cost per unit time. The proposed algorithm is applied to a numerical example to compare the effectiveness of the proposed policy (policy Ⅰ) with policy Ⅱ, which is similar to policy Ⅰ, but instead of general repair, replacement is performed. Results show that policy Ⅰ leads to lower average cost compared with policy Ⅱ.
Abstract: Pumping systems are an integral part of water desalination plants, their effective functioning is vital for the operation of a plant. In this research work, the reliability and availability of pressurized pumps in a reverse osmosis desalination plant are studied with the objective of finding configurations that provides optimal performance. Six configurations of a series system with different number of warm and cold standby components were examined. Closed form expressions for the mean time to failure (MTTF) and the long run availability are derived and compared under the assumption that the time between failures and repair times of the primary and standby components are exponentially distributed. Moreover, a cost/ benefit analysis is conducted in order to identify a configuration with the best performance and least cost. It is concluded that configurations with cold standby components are preferable especially when the pumps are of the size.
Abstract: In this paper, we present a maintenance model of a
two-unit series system with economic dependence. Unit#1 which is
considered to be more expensive and more important, is subject to
condition monitoring (CM) at equidistant, discrete time epochs and
unit#2, which is not subject to CM has a general lifetime distribution.
The multivariate observation vectors obtained through condition
monitoring carry partial information about the hidden state of unit#1,
which can be in a healthy or a warning state while operating. Only the
failure state is assumed to be observable for both units. The objective
is to find an optimal opportunistic maintenance policy minimizing
the long-run expected average cost per unit time. The problem
is formulated and solved in the partially observable semi-Markov
decision process framework. An effective computational algorithm
for finding the optimal policy and the minimum average cost is
developed, illustrated by a numerical example.
Abstract: In general fuzzy sets are used to analyze the fuzzy
system reliability. Here intuitionistic fuzzy set theory for analyzing
the fuzzy system reliability has been used. To analyze the fuzzy
system reliability, the reliability of each component of the system as
a triangular intuitionistic fuzzy number is considered. Triangular
intuitionistic fuzzy number and their arithmetic operations are
introduced. Expressions for computing the fuzzy reliability of a
series system and a parallel system following triangular intuitionistic
fuzzy numbers have been described. Here an imprecise reliability
model of an electric network model of dark room is taken. To
compute the imprecise reliability of the above said system, reliability
of each component of the systems is represented by triangular
intuitionistic fuzzy numbers. Respective numerical example is
presented.
Abstract: This study proposes a hybrid minimal repair policy
which combines periodic maintenance policy with age-based maintenance policy for a serial production system. Parameters of such policy are defined as and which indicate as hybrid minimal
repair time and planned preventive maintenance time
respectively . Under this hybrid policy, the system is
repaired minimally if it fails during ,. A perfect repair is
conducted on the first failure after at any machines. At the same time, we take opportunity to advance the preventive maintenance of
other machines simultaneously. If the system is still operating
properly up to , then the preventive maintenance is carried out as its
predetermined schedule. For a given , we obtain the optimal value which minimizes the expected cost per time unit. Numerical
example is presented to illustrate the properties of the optimal solution.