Abstract: The impact of the storm leads to accidents even in the case of vessels that meet the computed safety criteria for stability. That is why, in order to clarify the causes of the accident and shipwreck, it is necessary to study the dynamics of the ship under the complex sudden impact of external forces. The task is to determine the movement and landing of the ship in the complex and sudden impact of external forces, i.e. when the ship's load changes over a relatively short period of time. For the solution, a technique was used to study the ship's dynamics, which is based on the compilation of a system of differential equations of motion. A coordinate system was adopted for the equation of motion of the hull and the determination of external forces. As a numerical method of integration, the 4th order Runge-Kutta method was chosen. The results of the calculation show that dynamic deviations were lower for high-altitude vessels. The study of the movement of the hull under a difficult situation is performed: receiving of cargo, impact of a flurry of wind and subsequent displacement of the cargo. The risk of overturning and flooding was assessed.
Abstract: This paper presents the electrical effect of two neighboring distribution substation during the construction phase. The size of auxiliary grounding grid have an effect on entire grounding system. The bigger the size of auxiliary grounding grid, the lower the GPR and maximum touch voltage, with the exception that when the two grids are unconnected, i.e. the bigger the size of auxiliary grounding grid, the higher the maximum step voltage. The results in this paper could be served as design guideline of grounding system, and perhaps remedy of some troublesome grounding grids in power distribution’s system. Modeling and simulation is carried out on the Current Distribution Electromagnetic interference Grounding and Soil structure (CDEGS) program. The simulation results exhibit the design and analysis of power system grounding and perhaps could be set as a standard in grounding system design and modification in distribution substations.
Abstract: Recent widespread use of information and
communication technology has greatly changed information security
risks that businesses and institutions encounter. Along with this
situation, in order to ensure security and have confidence in electronic
trading, it has become important for organizations to take competent
information security measures to provide international confidence that
sensitive information is secure. Against this backdrop, the approach to
information security checking has come to an important issue, which
is believed to be common to all countries. The purpose of this paper is
to introduce the new system of information security checking program
in Korea and to propose synthetic information security
countermeasures under domestic circumstances in order to protect
physical equipment, security management and technology, and the
operation of security check for securing services on ISP(Internet
Service Provider), IDC(Internet Data Center), and
e-commerce(shopping malls, etc.)
Abstract: This paper presents the significant factor and give
some suggestion that should know before design. The main objective of this paper is guide the first step for someone who attends to design of grounding system before study in details later. The overview of
grounding system can protect damage from fault such as can save a human life and power system equipment. The unsafe conditions have
three cases. Case 1) maximum touch voltage exceeds the safety
criteria. In this case, the conductor compression ratio of the ground gird should be first adjusted to have optimal spacing of ground grid
conductors. If it still over limit, earth resistivity should be consider afterward. Case 2) maximum step voltage exceeds the safety criteria.
In this case, increasing the number of ground grid conductors around
the boundary can solve this problem. Case 3) both of maximum touch
and step voltage exceed the safety criteria. In this case, follow the solutions explained in case 1 and case 2. Another suggestion, vary depth of ground grid until maximum step and touch voltage do not
exceed the safety criteria.