Abstract: The substantial development of the construction
industry has forced the cement industry, its major support, to focus
on achieving maximum productivity to meet the growing demand for
this material. This means that the reliability of a cement production
system needs to be at the highest level that can be achieved by good
maintenance. This paper studies the extent to which the
implementation of RCM is needed as a strategy for increasing the
reliability of the production systems component can be increased,
thus ensuring continuous productivity. In a case study of four Libyan
cement factories, 80 employees were surveyed and 12 top and middle
managers interviewed. It is evident that these factories usually
breakdown more often than once per month which has led to a
decline in productivity. In many times they cannot achieve the
minimum level of production amount. This has resulted from the
poor reliability of their production systems as a result of poor or
insufficient maintenance. It has been found that most of the factories’
employees misunderstand maintenance and its importance. The main
cause of this problem is the lack of qualified and trained staff, but in
addition it has been found that most employees are not found to be
motivated as a result of a lack of management support and interest. In
response to these findings, it has been suggested that the RCM
strategy should be implemented in the four factories. The results
show the importance of the development of maintenance strategies
through the implementation of RCM in these factories. The purpose
of it would be to overcome the problems that could secure the
reliability of the production systems. This study could be a useful
source of information for academic researchers and the industrial
organizations which are still experiencing problems in maintenance
practices.
Abstract: This paper presents the results of a preventive maintenance application-based study and modeling of failure rates in breakers of electrical distribution systems. This is a critical issue in the reliability assessment of a system. In the analysis conducted in this paper, the impacts of failure rate variations caused by a preventive maintenance are examined. This is considered as a part of a Reliability Centered Maintenance (RCM) application program. A number of load point reliability indices is derived using the mathematical model of the failure rate, which is established using the observed data in a distribution system.
Abstract: Reliability Centered Maintenance(RCM) is one of
most widely used methods in the modern power system to schedule a
maintenance cycle and determine the priority of inspection. In order
to apply the RCM method to the Smart Grid, a precedence study for
the new structure of rearranged system should be performed due to
introduction of additional installation such as renewable and
sustainable energy resources, energy storage devices and advanced
metering infrastructure. This paper proposes a new method to
evaluate the priority of maintenance and inspection of the power
system facilities in the Smart Grid using the Risk Priority Number. In
order to calculate that risk index, it is required that the reliability
block diagram should be analyzed for the Smart Grid system. Finally,
the feasible technical method is discussed to estimate the risk
potential as part of the RCM procedure.
Abstract: A heuristic conceptual model for to develop the
Reliability Centered Maintenance (RCM), especially in preventive
strategy, has been explored during this paper. In most real cases
which complicity of system obligates high degree of reliability, this
model proposes a more appropriate reliability function between life
time distribution based and another which is based on relevant
Extreme Value (EV) distribution. A statistical and mathematical
approach is used to estimate and verify these two distribution
functions. Then best one is chosen just among them, whichever is
more reliable. A numeric Industrial case study will be reviewed to
represent the concepts of this paper, more clearly.