Abstract: As the penetration of Energy Storage System (ESS) increases in the power system due to higher performance and lower cost than ever, ESS is expanding its role to the ancillary service as well as the storage of extra energy from the intermittent renewable energy resources. For multi-ESS with different capacity and SOC level each other, it is required to make the optimal schedule of SOC level use the multi-ESS effectively. This paper proposes the energy allocation method for the multiple battery ESS with reliability constraint, in order to make the ESS discharge the required energy as long as possible. A simple but effective method is proposed in this paper, to satisfy the power for the spinning reserve requirement while improving the system reliability. Modelling of ESS is also proposed, and reliability is evaluated by using the combined reliability model which includes the proposed ESS model and conventional generation one. In the case study, it can be observed that the required power is distributed to each ESS adequately and accordingly, the SOC is scheduled to improve the reliability indices such as Loss of Load Probability (LOLP) and Loss of Load Expectation (LOLE).
Abstract: The application of ESS (Energy Storage Systems) in
the future grids has been the solution of the microgrid. However, high
investment costs necessitate accurate modeling and control strategy of
ESS to justify its economic viability and further underutilization.
Therefore, the reasonable control strategy for ESS which is subjected
to generator and usage helps to curtail the cost of investment and
operation costs. The rated frequency in power system is decreased
when the load is increasing unexpectedly; hence the thermal power is
operated at the capacity of only its 95% for the Governor Free (GF) to
adjust the frequency as reserve (5%) in practice. The ESS can be
utilized with governor at the same time for the frequency response due
to characteristic of its fast response speed and moreover, the cost of
ESS is declined rapidly to the reasonable price. This paper presents the
ESS control strategy to extend usage of the ESS taken account into
governor’s ramp rate and reduce the governor’s intervention as well.
All results in this paper are simulated by MATLAB.
Abstract: Home Energy Management System (HEMS), which makes the residential consumers, contribute to the demand response is attracting attention in recent years. An aim of HEMS is to minimize their electricity cost by controlling the use of their appliances according to electricity price. The use of appliances in HEMS may be affected by some conditions such as external temperature and electricity price. Therefore, the user’s usage pattern of appliances should be modeled according to the external conditions, and the resultant usage pattern is related to the user’s comfortability on use of each appliances. This paper proposes a methodology to model the usage pattern based on the historical data with the copula function. Through copula function, the usage range of each appliance can be obtained and is able to satisfy the appropriate user’s comfort according to the external conditions for next day. Within the usage range, an optimal scheduling for appliances would be conducted so as to minimize an electricity cost with considering user’s comfort. Among the home appliance, electric heater (EH) is a representative appliance, which is affected by the external temperature. In this paper, an optimal scheduling algorithm for an electric heater (EH) is addressed based on the method of branch and bound. As a result, scenarios for the EH usage are obtained according to user’s comfort levels and then the residential consumer would select the best scenario. The case study shows the effects of the proposed algorithm compared with the traditional operation of the EH, and it represents impacts of the comfort level on the scheduling result.
Abstract: Reliability Centered Maintenance(RCM) is one of
most widely used methods in the modern power system to schedule a
maintenance cycle and determine the priority of inspection. In order
to apply the RCM method to the Smart Grid, a precedence study for
the new structure of rearranged system should be performed due to
introduction of additional installation such as renewable and
sustainable energy resources, energy storage devices and advanced
metering infrastructure. This paper proposes a new method to
evaluate the priority of maintenance and inspection of the power
system facilities in the Smart Grid using the Risk Priority Number. In
order to calculate that risk index, it is required that the reliability
block diagram should be analyzed for the Smart Grid system. Finally,
the feasible technical method is discussed to estimate the risk
potential as part of the RCM procedure.
Abstract: The fault current levels through the electric devices
have a significant impact on failure probability. New fault current
results in exceeding the rated capacity of circuit breaker and switching
equipments and changes operation characteristic of overcurrent relay.
In order to solve these problems, SFCL (Superconducting Fault
Current Limiter) has rising as one of new alternatives so as to improve
these problems. A fault current reduction differs depending on
installed location. Therefore, a location of SFCL is very important.
Also, SFCL decreases the fault current, and it prevents surrounding
protective devices to be exposed to fault current, it then will bring a
change of reliability. In this paper, we propose method which
determines the optimal location when SFCL is installed in power
system. In addition, the reliability about the power system which
SFCL was installed is evaluated. The efficiency and effectiveness of
this method are also shown by numerical examples and the reliability
indices are evaluated in this study at each load points. These results
show a reliability change of a system when SFCL was installed.
Abstract: As the electrical power industry is restructured, the electrical power exchange is becoming extended. One of the key information used to determine how much power can be transferred through the network is known as available transfer capability (ATC). To calculate ATC, traditional deterministic approach is based on the severest case, but the approach has the complexity of procedure. Therefore, novel approach for ATC calculation is proposed using cost-optimization method in this paper, and is compared with well-being method and risk-benefit method. This paper proposes the optimal transfer capability of HVDC system between mainland and a separated island in Korea through these three methods. These methods will consider production cost, wheeling charge through HVDC system and outage cost with one depth (N-1 contingency)