Abstract: Milk is considered as an essential and complete food.
The present study was conducted at Milk Plant Mohali especially in
reference to the procurement section where the cash inflow was
maximum, with the objective to achieve higher productivity and
reduce wastage of milk. In milk plant it was observed that during the
month of Jan-2014 to March-2014 the average procurement of milk
was Rs. 4, 19, 361 liter per month and cost of procurement of milk is
Rs 35/- per liter. The total cost of procurement thereby equal to Rs.
1crore 46 lakh per month, but there was mismatch in procurementproduction
of milk, which leads to an average loss of Rs. 12, 94, 405
per month. To solve the procurement-production problem Quality
Control Tools like brainstorming, Flow Chart, Cause effect diagram
and Pareto analysis are applied wherever applicable. With the
successful implementation of Quality Control tools an average saving
of Rs. 4, 59, 445 per month is done.
Abstract: Adopting Most Advantageous Tender (MAT) for the
government procurement projects has become popular in Taiwan. As
time pass by, the problems of MAT has appeared gradually. People
condemn two points that are the result might be manipulated by a
single committee member’s partiality and how to make a fair decision
when the winner has two or more. Arrow’s Impossibility Theorem
proposed that the best scoring method should meet the four reasonable
criteria. According to these four criteria this paper constructed an
“Illegitimate Scores Checking Scheme” for a scoring method and used
the scheme to find out the illegitimate of the current evaluation method
of MAT. This paper also proposed a new scoring method that is called
the “Standardizing Overall Evaluated Score Method”. This method
makes each committee member’s influence tend to be identical. Thus,
the committee members can scoring freely according to their partiality
without losing the fairness. Finally, it was examined by a large-scale
simulation, and the experiment revealed that the it improved the
problem of dictatorship and perfectly avoided the situation of cyclical
majorities, simultaneously. This result verified that the Standardizing
Overall Evaluated Score Method is better than any current evaluation
method of MAT.
Abstract: An efficient remanufacturing network lead to an
efficient design of sustainable manufacturing enterprise. In
remanufacturing network, products are collected from the customer
zone, disassembled and remanufactured at a suitable remanufacturing
facility. In this respect, another issue to consider is how the returned
product to be remanufactured, in other words, what is the best layout
for such facility. In order to achieve a sustainable manufacturing
system, Cellular Manufacturing System (CMS) designs are highly
recommended, CMSs combine high throughput rates of line layouts
with the flexibility offered by functional layouts (job shop).
Introducing the CMS while designing a remanufacturing network will
benefit the utilization of such a network. This paper presents and
analyzes a comprehensive mathematical model for the design of
Dynamic Cellular Remanufacturing Systems (DCRSs). In this paper,
the proposed model is the first one to date that considers CMS and
remanufacturing system simultaneously. The proposed DCRS model
considers several manufacturing attributes such as multi period
production planning, dynamic system reconfiguration, duplicate
machines, machine capacity, available time for workers, worker
assignments, and machine procurement, where the demand is totally
satisfied from a returned product. A numerical example is presented
to illustrate the proposed model.
Abstract: One of the best examples, in evolution of the public
procurement, from post-soviet countries are reforms carried out in
Georgia, which brought them close to international standards of
procurement. In Georgia, public procurement legislation started
functioning short after gaining independence. The reform has passed
several stages and came in the form as it is today. It should also be
noted, that countries with economy in transition, including Georgia,
implemented all the reforms in public procurement based on
recommendations and support of World Bank, the United Nations
and other international organizations.
The aim of first adopted law was regulation of the procurement
process of budget-organizations, transparency and creation of
competitive environment for private companies to access state funds
legally. The priorities were identified quite clearly in the wording of
the law, but operation/function of this law could not be reached on its
level, because of some objective and subjective reasons. The high
level of corruption in all levels of governance can be considered as a
main obstacle reason and of course, it is natural, that it had direct
impact on the procurement process, as well as on transparency and
rational use of state funds. These circumstances were the reasons that
reforms in this sphere continued, to improve procurement process, in
particular, the first wave of reforms began after several years. Public
procurement agency carried out reform with World Bank with main
purpose of smartening the procurement legislation and its
harmonization with international treaties and agreements. Also with
the support of World Bank various activities were carried out to raise
awareness of participants involved in procurement system.
Further major changes in the legislation were filed bit later, which
was also directed towards the improvement and smarten of the
procurement process. The third wave of the reform more or less
guaranteed the transparency of the procurement process, which later
became the basis for the rational spending of state funds. The reform
of the procurement system completely changed the procedures.
Carried out reform in Georgia resulted in introducing new
electronic tendering system, which benefit the transparency of the
process, after this became the basis for the further development of a
competitive environment, which become a prerequisite for the state
rational spending. Increased number of supplier organizations
participating in the procurement process resulted in reduction of the
estimated cost and the actual cost.
Assessment of the reforms in Georgia in the field of public
procurement can be concluded, that proper regulation of the sector
and relevant policy may proceed to rational and transparent spending
of the budget from country’s state institutions. Also, the business
sector has the opportunity to work in competitive market conditions
and to make a preliminary analysis, which is a prerequisite for future
strategy and development.
Abstract: Contracting authorities in the public sector are
obligated to apply the principles provided for in the Polish law for the
evaluation and selection of contractors. In order to analyse the
methods of contractors selecting applied in practice by public clients,
the notices of contract award results for construction works were
analysed. The analysis shows that the procedure selected more and
more often is open competitive bidding, where the assessment of the
competence of contractors is not very precise, as well as noncompetitive
bidding, i.e. single source procurement. The share of
procurement procedures, where the only criterion is price, is
increasing. The solution to the problems existing here might be the
introduction of one of the forms of pre-selection of contractors. The
article also briefly discusses verification systems for companies
applying for public contracts used in EU countries.
Abstract: Cloud computing (CC) has already gained overall
appreciation in research and practice. Whereas the willingness to
integrate cloud services in various IT environments is still unbroken,
the previous CC procurement processes run mostly in an unorganized
and non-standardized way. In practice, a sufficiently specific, yet
applicable business process for the important acquisition phase is
often lacking. And research does not appropriately remedy this
deficiency yet. Therefore, this paper introduces a field-tested
approach for CC procurement. Based on an extensive literature
review and augmented by expert interviews, we designed a model
that is validated and further refined through an in-depth real-life case
study. For the detailed process description, we apply the event-driven
process chain notation (EPC). The gained valuable insights into the
case study may help CC research to shift to a more socio-technical
area. For practice, next to giving useful organizational instructions
we will provide extended checklists and lessons learned.
Abstract: Amongst the many priorities facing Libya following the 2011 uprising is the provision of a transport infrastructure that will meet the nation’s needs and not undermine its prospects for economic prosperity as with many developing economies non-technical issues such as management, planning and financing are the major barriers to the efficient and effective provision of transport infrastructure. This is particularly true in the case of the effective incorporation of sustainability criteria, and the research upon which this paper is based involves the examination of alternative ways of approaching this problem. It is probably fair to say that criteria that relate to sustainability have not, historically, featured strongly in Libya’s approach to the development of its transport infrastructure. However, the current reappraisal of how best to redevelop the country’s transport infrastructure that has been afforded by recent events may offer the opportunity to alter this. The research examines recent case studies from a number of countries to explore ways in which sustainability has been included as a criterion for planning and procurement decisions. There will also be an in-depth investigation into the Libyan planning and legislative context to examine the feasibility of the introduction of such sustainability criteria into the process of planning and procurement of Libya’s transport infrastructure.
Abstract: The results of dissertation research "Preventing and
combating corruption in public procurement" are presented in this
publication. The study was conducted 2011 till 2013 in a Member
State of the European Union– in the Republic of Latvia.
Goal of the thesis is to explore corruption prevention and
combating issues in public procurement sphere, to identify the
prevalence rates, determinants and contributing factors and
prevention opportunities in Latvia.
In the first chapter the author analyzes theoretical aspects of
understanding corruption in public procurement, with particular
emphasis on corruption definition problem, its nature, causes and
consequences. A separate section is dedicated to the public
procurement concept, mechanism and legal framework. In the first
part of this work the author presents cognitive methodology of
corruption in public procurement field, based on which the author has
carried out an analysis of corruption situation in public procurement
in Republic of Latvia.
In the second chapter of the thesis, the author analyzes the
problem of corruption in public procurement, including its historical
aspects, typology and classification of corruption subjects involved,
corruption risk elements in public procurement and their
identification. During the development of the second chapter author's
practical experience in public procurements was widely used.
The third and fourth chapter deals with issues related to the
prevention and combating corruption in public procurement, namely
the operation of the concept, principles, methods and techniques,
subjects in Republic of Latvia, as well as an analysis of foreign
experience in preventing and combating corruption. The fifth chapter
is devoted to the corruption prevention and combating perspectives
and their assessment. In this chapter the author has made the
evaluation of corruption prevention and combating measures
efficiency in Republic of Latvia, assessment of anti-corruption
legislation development stage in public procurement field in Latvia.
Abstract: Manufacturers have been exploring innovative strategies to achieve and sustain competitive advantages as they face a new era of intensive global competition. Such strategy is known as Supply Chain Management (SCM), which has gained a tremendous amount of attention from both researchers and practitioners over the last decade. Supply chain management (SCM) is considered as the most popular operating strategy for improving organizational competitiveness in the twenty-first century. It has attracted a lot of attention recently due to its role involving all of the activities in industrial organizations, ranging from raw material procurement to final product delivery to customers. Well-designed supply chain systems can substantially improve efficiency and product quality, and eventually enhance customer satisfaction and profitability. In this paper, a manufacturing engineering perspective on supply chain integration is presented. Research issues discussed include the product and process design for the supply chain, design evaluation of manufacturing in the supply chain, agent-based techniques for supply chain integration, intelligent information for sharing across the supply chain, and a development of standards for product, process, and production data exchange to facilitate electronic commerce. The objective is to provide guidelines and references for manufacturing engineers and researchers interested in supply chain integration.
Abstract: Public procurement is one of the most
important areas in the public sector that introduces a possibility for a
corruption. Due to the volume of the funds that are
allocated through this institution (in the EU countries it is between 10
– 15% of GDP), it has very serious implications for the efficiency of
public expenditures and the overall economic efficiency as
well. Indicators that are usually used for the measurement of the
corruption (such as Corruption Perceptions Index - CPI) show that
the worst situation is in the post-communist countries
and Mediterranean countries.
The presented paper uses the Czech Republic as an example of a
post-communist country and analyses the factors which influence
the scope of corruption in public procurement. Moreover, the
paper discusses indicators that could point at the public procurement
market inefficiency. The presented results show that post-communist
states use the institute of public contracts significantly more than the
old member countries of the continental Europe. It has a very
important implication because it gives more space for corruption.
Furthermore, it appears that the inefficient functioning of public
procurement market is clearly manifested in the low number of bids,
low level of market transparency and an ineffective control
system. Some of the observed indicators are statistically significantly
correlated with the CPI.
Abstract: The Malaysia Highway Authority (MHA) was
established by the Government in 1980 for the purpose of designing,
constructing and maintaining toll highways in Malaysia that include
the North-South Expressway and the Penang Bridge, which were
procured using the publicly-funded traditional procurement. However
following a recession in the mid 80-s, the operations of these tolledhighways
had been privatized to ensure that their operational services
continue through private financing as a result of long-term
concession agreement concurred between the Malaysian Government
and private operators. The change in the contract strategy for
highway projects in Malaysia would have a great tendency to dictate
a significant risk exposure towards the key parties involved,
particularly the Malaysian Government as project principal, unless
operational risks are clearly identified and managed via appropriate
mitigation measures prior to a contract signing.
This research identifies potential operational risks that have a
possibility to occur in highway projects in Malaysia from the
perspective of public sector clients. Since this research focuses on the
operational risks for highway projects in Malaysia, the initial results
acquired from literature review on the operational risks of highway
projects in some Asian countries are then justified by a number of
key individuals from the MHA through interviews. As a result,
among key operational risks that have possibility to occur in the
highway projects in Malaysia include initial toll-tariff decided by the
Government, traffic congestion, change of road network and overloaded
freight transportation, which could cause damage to the road
surface and hence affecting the operation of a particular highway.
Abstract: Currently is characterized production engineering
together with the integration of industrial automation and robotics
such very quick view of to manufacture the products. The production
range is continuously changing, expanding and producers have to be
flexible in this regard. It means that need to offer production
possibilities, which can respond to the quick change. Engineering
product development is focused on supporting CAD software, such
systems are mainly used for product design. That manufacturers are
competitive, it should be kept procured machines made available
capable of responding to output flexibility. In response to that
problem is the development of flexible manufacturing systems,
consisting of various automated systems. The integration of flexible
manufacturing systems and subunits together with product design and
of engineering is a possible solution for this issue. Integration is
possible through the implementation of CIM systems. Such a solution
and finding a hyphen between CAD and procurement system ICIM
3000 from Festo Co. is engaged in the research project and this
contribution. This can be designed the products in CAD systems and
watch the manufacturing process from order to shipping by the
development of methods and processes of integration, This can be
modeled in CAD systems products and watch the manufacturing
process from order to shipping to develop methods and processes of
integration, which will improve support for product design
parameters by monitoring of the production process, by creating of
programs for production using the CAD and therefore accelerates the
a total of process from design to implementation.
Abstract: The aim of this paper is to present current and future
procedures in castings procurement. Differences in procurement are
highlighted. The supplier selection criteria used in practice is
compared to literature findings. Different trends related to supply
chains are presented and it is described how they are reflected in
reality to castings procurement. To fulfil the aim, interviews were
conducted in nine companies using castings. It was found that largest
casting users have the most subcontractor foundries and it is more
typical that they have multiple suppliers for the same parts. Currently
only two companies out of nine purchase castings outside Europe,
but the others are also progressing in the same direction. The main
reason is the need to lower purchasing costs. Another trend is that all
companies want to buy cast components or sub-assemblies instead of
raw castings from foundries. It was found that price is a main
supplier selection criterion. All companies use competitive bidding in
supplier selection.
Abstract: Supplier appraisal fosters energy in Supply Chain
Management and helps in best optimization of viable business
partners for a company. Many Decision Making techniques have
already been proposed by researchers for supplier-s appraisal.
However, Analytic Hierarchy Process (AHP) is assumed to be the
most structured technique to attain near-best solution of the problem.
This paper focuses at implementation of AHP in the procurement
processes. It also suggests that on what factors a Public Sector
Enterprises must focus while dealing with their suppliers and what
should the suppliers do to synchronize their activities with the
strategic objectives of Organization. It also highlights the weak areas
in supplier appraisal process with a view to suggest viable
recommendations.
Abstract: Availability of raw materials is important for
Indonesia as a furniture exporting country. Teak log as raw materials
is supplied to the furniture industry by Perum Perhutani (PP). PP
needs to involve carbon trading for nature conservation. PP also has
an obligation in the Corporate Social Responsibility program. PP and
furniture industry also must prosecute the regulations related to
ecological issues and labor rights. This study has the objective to
create the relationship model between supplier and manufacturer to
fulfill teak log demand that involving teak forest carbon
sequestration. A model is formulated as Goal Programming to get the
favorable solution for teak log procurement and support carbon
sequestration that considering economical, ecological, and social
aspects of both supplier and manufacturer. The results show that the
proposed model can be used to determine the teak log quantity
involving carbon trading to achieve the seven goals to be satisfied the
sustainability considerations.
Abstract: This work presents the design of an expert system that aims in the procurement of patient medial background and in the search for suitable skin test selections. Skin testing is the tool used most widely to diagnose allergies. The language of expert systems CLIPS is used as a tool of designing. Finally, we present the evaluation of the proposed expert system which was achieved with the import of certain medical cases and the system produced with suitable successful skin tests.
Abstract: Procurement is an important component in the field of
operating resource management and e-procurement is the golden key
to optimizing the supply chains system. Global firms are optimistic
on the level of savings that can be achieved through full
implementation of e-procurement strategies. E-procurement is an
Internet-based business process for obtaining materials and services
and managing their inflow into the organization. In this paper, the
subjects of supply chains and e-procurement and its benefits to
organizations have been studied. Also, e-procurement in construction
and its drivers and barriers have been discussed and a framework of
supplier selection in an e-procurement environment has been
demonstrated. This paper also has addressed critical success factors
in adopting e-procurement in supply chains.
Abstract: A business case is a proposal for an investment
initiative to satisfy business and functional requirements. The
business case provides the foundation for tactical decision making
and technology risk management. It helps to clarify how the
organization will use its resources in the best way by providing
justification for investment of resources. This paper describes how
simulation was used for business case benefits and return on
investment for the procurement of 8 production machines. With
investment costs of about 4.7 million dollars and annual operating
costs of about 1.3 million, we needed to determine if the machines
would provide enough cost savings and cost avoidance. We
constructed a model of the existing factory environment consisting of
8 machines and subsequently, we conducted average day simulations
with light and heavy volumes to facilitate planning decisions
required to be documented and substantiated in the business case.
Abstract: The procurement and cost management approach adopted for mechanical and electrical (M&E) services in Malaysian construction industry have been criticized for its inefficiency. The study examined early cost estimating practices adopted for mechanical and electrical services (M&E) in Malaysia so as to understand the level of compliance of the current techniques with best practices. The methodology adopted for the study is a review of bidding documents used on both completed and on – going building projects awarded between 2008 – 2010 under 9th Malaysian Plan. The analysis revealed that, M&E services cost cannot be reliably estimated at pre-contract stage; the bidding techniques adopted for M&E services failed to provide uniform basis for contractors to submit tender; detailed measurement of items were not made which could complicate post contract cost control and financial management. The paper concluded that, there is need to follow a structured approach in determining the pre-contract cost estimate for M&E services which will serve as a virile tool for post contract cost control.
Abstract: Infrastructure investments are important in developing
countries, it will not only help to foster the economic growth of a
nation, but it will also act as a platform in which new forms of
partnership and collaboration can be developed mainly in East Asian
countries. Since the last two decades, many infrastructure projects
had been completed through build-operate-transfer (BOT) type of
procurement. The developments of BOT have attracted participation
of local and foreign private sector investor to secure funding and to
deliver projects on time, within the budget and to the required
specifications. Private sectors are preferred by the government in
East Asia to participate in BOT projects due to lack of public
funding. The finding has resulted that the private sector or promoter
of the BOT projects is exposed to multiple risks which have been
discussed in this paper. Effective risk management methods and
good managerial skills are required in ensuring the success of the
project. The review indicated that mitigation measures should be
employed by the promoter throughout the concession period and
support from the host government is also required in ensuring the
success of the BOT project.