Abstract: Owing the fact that optimization of business process
is a crucial requirement to navigate, survive and even thrive in
today-s volatile business environment, this paper presents a
framework for selecting a best-fit optimization package for solving
complex business problems. Complexity level of the problem and/or
using incorrect optimization software can lead to biased solutions of
the optimization problem. Accordingly, the proposed framework
identifies a number of relevant factors (e.g. decision variables,
objective functions, and modeling approach) to be considered during
the evaluation and selection process. Application domain, problem
specifications, and available accredited optimization approaches are
also to be regarded. A recommendation of one or two optimization
software is the output of the framework which is believed to provide
the best results of the underlying problem. In addition to a set of
guidelines and recommendations on how managers can conduct an
effective optimization exercise is discussed.
Abstract: This paper proposes an investment cost recovery
based efficient and fast sequential optimization approach to optimal
allocation of thyristor controlled series compensator (TCSC) in
competitive power market. The optimization technique has been used
with an objective to maximizing the social welfare and minimizing
the device installation cost by suitable location and rating of TCSC in
the system. The effectiveness of proposed approach for location of
TCSC has been compared with some existing methods of TCSC
placement, in terms of its impact on social welfare, TCSC investment
recovery and optimal generation as well as load patterns. The results
have been obtained on modified IEEE 14-bus system.
Abstract: Multi-energy systems will enhance the system
reliability and power quality. This paper presents an integrated
approach for the design and operation of distributed energy resources
(DER) systems, based on energy hub modeling. A multi-objective
optimization model is developed by considering an integrated view of
electricity and natural gas network to analyze the optimal design and
operating condition of DER systems, by considering two conflicting
objectives, namely, minimization of total cost and the minimization
of environmental impact which is assessed in terms of CO2
emissions. The mathematical model considers energy demands of the
site, local climate data, and utility tariff structure, as well as technical
and financial characteristics of the candidate DER technologies. To
provide energy demands, energy systems including photovoltaic, and
co-generation systems, boiler, central power grid are considered. As
an illustrative example, a hotel in Iran demonstrates potential
applications of the proposed method. The results prove that
increasing the satisfaction degree of environmental objective leads to
increased total cost.
Abstract: State-based testing is frequently used in software testing. Test data generation is one of the key issues in software testing. A properly generated test suite may not only locate the errors in a software system, but also help in reducing the high cost associated with software testing. It is often desired that test data in the form of test sequences within a test suite can be automatically generated to achieve required test coverage. This paper proposes an Ant Colony Optimization approach to test data generation for the state-based software testing.
Abstract: An enhanced particle swarm optimization algorithm
(PSO) is presented in this work to solve the non-convex OPF
problem that has both discrete and continuous optimization variables.
The objective functions considered are the conventional quadratic
function and the augmented quadratic function. The latter model
presents non-differentiable and non-convex regions that challenge
most gradient-based optimization algorithms. The optimization
variables to be optimized are the generator real power outputs and
voltage magnitudes, discrete transformer tap settings, and discrete
reactive power injections due to capacitor banks. The set of equality
constraints taken into account are the power flow equations while the
inequality ones are the limits of the real and reactive power of the
generators, voltage magnitude at each bus, transformer tap settings,
and capacitor banks reactive power injections. The proposed
algorithm combines PSO with Newton-Raphson algorithm to
minimize the fuel cost function. The IEEE 30-bus system with six
generating units is used to test the proposed algorithm. Several cases
were investigated to test and validate the consistency of detecting
optimal or near optimal solution for each objective. Results are
compared to solutions obtained using sequential quadratic
programming and Genetic Algorithms.
Abstract: Economic dispatch (ED) has been considered to be one of the key functions in electric power system operation which can help to build up effective generating management plans. The practical ED problem has non-smooth cost function with nonlinear constraints which make it difficult to be effectively solved. This paper presents a novel heuristic and efficient optimization approach based on the new Bat algorithm (BA) to solve the practical non-smooth economic dispatch problem. The proposed algorithm easily takes care of different constraints. In addition, two newly introduced modifications method is developed to improve the variety of the bat population when increasing the convergence speed simultaneously. The simulation results obtained by the proposed algorithms are compared with the results obtained using other recently develop methods available in the literature.
Abstract: In this paper we propose a new criterion for solving
the problem of channel shortening in multi-carrier systems. In a
discrete multitone receiver, a time-domain equalizer (TEQ) reduces
intersymbol interference (ISI) by shortening the effective duration of
the channel impulse response. Minimum mean square error (MMSE)
method for TEQ does not give satisfactory results. In [1] a new
criterion for partially equalizing severe ISI channels to reduce the
cyclic prefix overhead of the discrete multitone transceiver (DMT),
assuming a fixed transmission bandwidth, is introduced. Due to
specific constrained (unit morm constraint on the target impulse
response (TIR)) in their method, the freedom to choose optimum
vector (TIR) is reduced. Better results can be obtained by avoiding
the unit norm constraint on the target impulse response (TIR). In
this paper we change the cost function proposed in [1] to the cost
function of determining the maximum of a determinant subject to
linear matrix inequality (LMI) and quadratic constraint and solve the
resulting optimization problem. Usefulness of the proposed method
is shown with the help of simulations.
Abstract: This study discusses the effect of uncertainty on
production levels of a petrochemical complex. Uncertainly or
variations in some model parameters, such as prices, supply and
demand of materials, can affect the optimality or the efficiency of any
chemical process. For any petrochemical complex with many plants,
there are many sources of uncertainty and frequent variations which
require more attention. Many optimization approaches are proposed
in the literature to incorporate uncertainty within the model in order
to obtain a robust solution. In this work, a stability analysis approach
is applied to a deterministic LP model of a petrochemical complex
consists of ten plants to investigate the effect of such variations on
the obtained optimal production levels. The proposed approach can
determinate the allowable variation ranges of some parameters,
mainly objective or RHS coefficients, before the system lose its
optimality. Parameters with relatively narrow range of variations, i.e.
stability limits, are classified as sensitive parameters or constraints
that need accurate estimate or intensive monitoring. These stability
limits offer easy-to-use information to the decision maker and help in
understanding the interaction between some model parameters and
deciding when the system need to be re-optimize. The study shows
that maximum production of ethylene and the prices of intermediate
products are the most sensitive factors that affect the stability of the
optimum solution
Abstract: In intensity modulated radiation therapy (IMRT)
treatment planning, beam angles are usually preselected on the basis of
experience and intuition. Therefore, getting an appropriate beam
configuration needs a very long time. Based on the present situation,
the paper puts forward beam orientation optimization using ant colony
optimization (ACO). We use ant colony optimization to select the
beam configurations, after getting the beam configuration using
Conjugate Gradient (CG) algorithm to optimize the intensity profiles.
Combining with the information of the effect of pencil beam, we can
get the global optimal solution accelerating. In order to verify the
feasibility of the presented method, a simulated and clinical case was
tested, compared with dose-volume histogram and isodose line
between target area and organ at risk. The results showed that the
effect was improved after optimizing beam configurations. The
optimization approach could make treatment planning meet clinical
requirements more efficiently, so it had extensive application
perspective.
Abstract: This paper describes the optimization of a complex
dairy farm simulation model using two quite different methods of
optimization, the Genetic algorithm (GA) and the Lipschitz
Branch-and-Bound (LBB) algorithm. These techniques have been
used to improve an agricultural system model developed by Dexcel
Limited, New Zealand, which describes a detailed representation of
pastoral dairying scenarios and contains an 8-dimensional parameter
space. The model incorporates the sub-models of pasture growth and
animal metabolism, which are themselves complex in many cases.
Each evaluation of the objective function, a composite 'Farm
Performance Index (FPI)', requires simulation of at least a one-year
period of farm operation with a daily time-step, and is therefore
computationally expensive. The problem of visualization of the
objective function (response surface) in high-dimensional spaces is
also considered in the context of the farm optimization problem.
Adaptations of the sammon mapping and parallel coordinates
visualization are described which help visualize some important
properties of the model-s output topography. From this study, it is
found that GA requires fewer function evaluations in optimization
than the LBB algorithm.
Abstract: This work concerns the topological optimization
problem for determining the optimal petroleum refinery
configuration. We are interested in further investigating and
hopefully advancing the existing optimization approaches and
strategies employing logic propositions to conceptual process
synthesis problems. In particular, we seek to contribute to this
increasingly exciting area of chemical process modeling by
addressing the following potentially important issues: (a) how the
formulation of design specifications in a mixed-logical-and-integer
optimization model can be employed in a synthesis problem to enrich
the problem representation by incorporating past design experience,
engineering knowledge, and heuristics; and (b) how structural
specifications on the interconnectivity relationships by space (states)
and by function (tasks) in a superstructure should be properly
formulated within a mixed-integer linear programming (MILP)
model. The proposed modeling technique is illustrated on a case
study involving the alternative processing routes of naphtha, in which
significant improvement in the solution quality is obtained.
Abstract: The increasing competitiveness in manufacturing
industry is forcing manufacturers to seek effective processing
schedules. The paper presents an optimization manufacture
scheduling approach for dependent details processing with given
processing sequences and times on multiple machines. By defining
decision variables as start and end moments of details processing it is
possible to use straightforward variables restrictions to satisfy
different technological requirements and to formulate easy to
understand and solve optimization tasks for multiple numbers of
details and machines. A case study example is solved for seven base
moldings for CNC metalworking machines processed on five
different machines with given processing order among details and
machines and known processing time-s duration. As a result of linear
optimization task solution the optimal manufacturing schedule
minimizing the overall processing time is obtained. The
manufacturing schedule defines the moments of moldings delivery
thus minimizing storage costs and provides mounting due-time
satisfaction. The proposed optimization approach is based on real
manufacturing plant problem. Different processing schedules variants
for different technological restrictions were defined and implemented
in the practice of Bulgarian company RAIS Ltd. The proposed
approach could be generalized for other job shop scheduling
problems for different applications.