Abstract: In this paper, five options of Iran’s gas flare recovery
have been compared via MCDM method. For developing the model,
the weighing factor of each indicator an AHP method is used via the
Expert-choice software. Several cases were considered in this
analysis. They are defined where the priorities were defined always
keeping one criterion in first position, while the priorities of the other
criteria were defined by ordinal information defining the mutual
relations of the criteria and the respective indicators. The results,
show that amongst these cases, priority is obtained for CHP usage
where availability indicator is highly weighted while the pipeline
usage is obtained where environmental indicator highly weighted and
the injection priority is obtained where economic indicator is highly
weighted and also when the weighing factor of all the criteria are the
same the Injection priority is obtained.
Abstract: Multi-energy systems will enhance the system
reliability and power quality. This paper presents an integrated
approach for the design and operation of distributed energy resources
(DER) systems, based on energy hub modeling. A multi-objective
optimization model is developed by considering an integrated view of
electricity and natural gas network to analyze the optimal design and
operating condition of DER systems, by considering two conflicting
objectives, namely, minimization of total cost and the minimization
of environmental impact which is assessed in terms of CO2
emissions. The mathematical model considers energy demands of the
site, local climate data, and utility tariff structure, as well as technical
and financial characteristics of the candidate DER technologies. To
provide energy demands, energy systems including photovoltaic, and
co-generation systems, boiler, central power grid are considered. As
an illustrative example, a hotel in Iran demonstrates potential
applications of the proposed method. The results prove that
increasing the satisfaction degree of environmental objective leads to
increased total cost.