Abstract: Taiwan’s infrastructure is gradually deteriorating, while resources for maintenance and replacement are increasingly limited, raising the urgent need for methods for maintaining existing infrastructure within constrained budgets. Infrastructure value evaluation is used to enhance the efficiency of infrastructure maintenance work, allowing administrators to quickly assess the maintenance needs and performance by observing variation in infrastructure value. This research establishes a value evaluation model for Taiwan’s highway box girder bridges. The operating mechanism and process of the model are illustrated in a practical case.
Abstract: Visual simulation has emerged as a key planning tool in built environment because it enables architects, engineers and project managers to visualize construction process evolution before the project actual commences. This provides an efficient technology for reducing time and cost through planning and controlling resources, machines and materials. With the development of infrastructure projects and the massive civil constructions such as bridges, urban tunnels and highways as well as sensitivity of their construction operations, it is very necessary to apply proper planning methods. Implementation of visual techniques into management of construction projects can provide a fundamental foundation for projects with massive activities and duplicate items. So, the purpose of this paper is to develop visual simulation management techniques for infrastructure projects such as highways bridges by the use of Four-Dimensional Computer-Aided design Models. This project simulates operational assembly-line for Box-Girder Concrete Bridges which it would be able to optimize the sequence and interaction of project activities and on the other hand, it would minimize any unintended conflicts prior to project start. In this paper, after introducing the various planning methods by building information model and concrete bridges in highways, an executive case study is demonstrated and then a visual technique (4D CAD) will be applied for the case. In the final step, the user feedback for interacting by this system evaluated according to six criteria.
Abstract: In general, codes and regulations consider seismic
loads only for completed structures of the bridges while, evaluation
of incomplete structure of bridges, especially those constructed by
free cantilever method, under these loads is also of great importance.
Hence, this research tried to study the behavior of incomplete
structure of common bridge type (box girder bridge), in construction
phase under vertical seismic loads. Subsequently, the paper provided
suitable guidelines and solutions to resist this destructive
phenomenon. Research results proved that use of preventive methods
can significantly reduce the stresses resulted from vertical seismic
loads in box cross sections to an acceptable range recommended by
design codes.
Abstract: Researches on the general rules of temperature field
changing and their effects on the bridge in construction are necessary.
This paper investigated the rules of temperature field changing and its
effects on bridge using onsite measurement and computational
analysis. Guanyinsha Bridge was used as a case study in this research.
The temperature field was simulated in analyses. The effects of certain
boundary conditions such as sun radiance, wind speed, and model
parameters such as heat factor and specific heat on temperature field
are investigated. Recommended values for these parameters are
proposed. The simulated temperature field matches the measured
observations with high accuracy. At the same time, the stresses and
deflections of the bridge computed with the simulated temperature
field matches measured values too. As a conclusion, the temperature
effect analysis of reinforced concrete box girder can be conducted
directly based on the reliable weather data of the concerned area.
Abstract: The nearly 21-year-old Jiujiang Bridge, which is suffering from uneven line shape, constant great downwarping of the main beam and cracking of the box girder, needs reinforcement and cable adjustment. It has undergone cable adjustment for twice with incomplete data. Therefore, the initial internal force state of the Jiujiang Bridge is identified as the key for the cable adjustment project. Based on parameter identification by means of static force test data, this paper suggests determining the initial internal force state of the cable-stayed bridge according to the cable force-displacement relationship parameter identification method. That is, upon measuring the displacement and the change in cable forces for twice, one can identify the parameters concerned by means of optimization. This method is applied to the cable adjustment, replacement and reinforcement project for the Jiujiang Bridge as a guidance for the cable adjustment and reinforcement project of the bridge.
Abstract: A new analytical method to predict the torsional
capacity and behavior of R.C multi-cell box girders strengthened with
carbon fiber reinforced polymer (CFRP) sheets is presented.
Modification was done on the Softened Truss Model (STM) in the
proposed method; the concrete torsional problem is solved by
combining the equilibrium conditions, compatibility conditions and
constitutive laws of materials by taking into account the confinement
of concrete with CFRP sheets. A specific algorithm is developed to
predict the torsional behavior of reinforced concrete multi-cell box
girders with or without strengthening by CFRP sheets. Applications
of the developed method as an assessment tool to strengthened multicell
box girders with CFRP and first analytical example that
demonstrate the contribution of the CFRP materials on the torsional
response is also included.
Abstract: It is necessary to evaluate the bridges conditions and
strengthen bridges or parts of them. The reinforcement necessary due
to some reasons can be summarized as: First, a changing in use of
bridge could produce internal forces in a part of structural which
exceed the existing cross-sectional capacity. Second, bridges may
also need reinforcement because damage due to external factors
which reduced the cross-sectional resistance to external loads. One of
other factors could listed here its misdesign in some details, like
safety of bridge or part of its.This article identify the design demands
of Qing Shan bridge located in is in Heilongjiang Province He gang -
Nen Jiang Road 303 provincial highway, Wudalianchi area, China, is
an important bridge in the urban areas. The investigation program
was include the observation and evaluate the damage in T- section
concrete beams , prestressed concrete box girder bridges section in
additional evaluate the whole state of bridge includes the pier ,
abutments , bridge decks, wings , bearing and capping beam, joints,
........etc. The test results show that the bridges in general structural
condition are good. T beam span No 10 were observed, crack
extended upward along the ribbed T beam, and continue to the T
beam flange. Crack width varying between 0.1mm to 0.4mm, the
maximum about 0.4mm. The bridge needs to be improved flexural
bending strength especially at for T beam section.
Abstract: Stick models are widely used in studying the
behaviour of straight as well as skew bridges and viaducts subjected
to earthquakes while carrying out preliminary studies. The
application of such models to highly curved bridges continues to
pose challenging problems. A viaduct proposed in the foothills of the
Himalayas in Northern India is chosen for the study. It is having 8
simply supported spans @ 30 m c/c. It is doubly curved in horizontal
plane with 20 m radius. It is inclined in vertical plane as well. The
superstructure consists of a box section. Three models have been
used: a conventional stick model, an improved stick model and a 3D
finite element model. The improved stick model is employed by
making use of body constraints in order to study its capabilities. The
first 8 frequencies are about 9.71% away in the latter two models.
Later the difference increases to 80% in 50th mode. The viaduct was
subjected to all three components of the El Centro earthquake of May
1940. The numerical integration was carried out using the Hilber-
Hughes-Taylor method as implemented in SAP2000. Axial forces
and moments in the bridge piers as well as lateral displacements at
the bearing levels are compared for the three models. The maximum
difference in the axial forces and bending moments and
displacements vary by 25% between the improved and finite element
model. Whereas, the maximum difference in the axial forces,
moments, and displacements in various sections vary by 35%
between the improved stick model and equivalent straight stick
model. The difference for torsional moment was as high as 75%. It is
concluded that the stick model with body constraints to model the
bearings and expansion joints is not desirable in very sharp S curved
viaducts even for preliminary analysis. This model can be used only
to determine first 10 frequency and mode shapes but not for member
forces. A 3D finite element analysis must be carried out for
meaningful results.