Abstract: In this paper, the regression dependence of dancing
intensity from wind speed and length of span was established due to
the statistic data obtained from multi-year observations on line wires
dancing accumulated by power systems of Kazakhstan and the
Russian Federation. The lower and upper limitations of the equations
parameters were estimated, as well as the adequacy of the regression
model. The constructed model will be used in research of dancing
phenomena for the development of methods and means of protection
against dancing and for zoning plan of the territories of line wire
dancing.
Abstract: The number of persons with implanted cardiac
pacemakers (PM) has increased in Western countries. The aim of this
paper is to investigate the possible situations where persons with a
PM may be exposed to extremely low frequency (ELF) electric (EF)
and magnetic fields (MF) that may disturb their PM. Based on our
earlier studies, it is possible to find such high public exposure to EFs
only in some places near 400 kV power lines, where an EF may
disturb a PM in unipolar mode. Such EFs cannot be found near 110
kV power lines. Disturbing MFs can be found near welding
machines. However, we do not have measurement data from welding.
Based on literature and earlier studies at Tampere University of
Technology, it is difficult to find public EF or MF exposure that is
high enough to interfere with PMs.
Abstract: Smart grid is a new approach for electric power grid that uses information and communications technology to control the electric power grid. Smart grid provides real-time control of the electric power grid, controlling the direction of power flow or time of the flow. Control devices are installed on the power lines of the electric power grid to implement smart grid. The number of the control devices should be determined, in relation with the area one control device covers and the cost associated with the control devices. One approach to determine the number of the control devices is to use the data on the surplus power generated by home solar generators. In current implementations, the surplus power is sent all the way to the power plant, which may cause power loss. To reduce the power loss, the surplus power may be sent to a control device and sent to where the power is needed from the control device. Under assumption that the control devices are installed on a lattice of equal size squares, our goal is to figure out the optimal spacing between the control devices, where the power sharing area (the area covered by one control device) is kept small to avoid power loss, and at the same time the power sharing area is big enough to have no surplus power wasted. To achieve this goal, a simulation using landscape ecology method is conducted on a sample area. First an aerial photograph of the land of interest is turned into a mosaic map where each area is colored according to the ratio of the amount of power production to the amount of power consumption in the area. The amount of power consumption is estimated according to the characteristics of the buildings in the area. The power production is calculated by the sum of the area of the roofs shown in the aerial photograph and assuming that solar panels are installed on all the roofs. The mosaic map is colored in three colors, each color representing producer, consumer, and neither. We started with a mosaic map with 100 m grid size, and the grid size is grown until there is no red grid. One control device is installed on each grid, so that the grid is the area which the control device covers. As the result of this simulation we got 350m as the optimal spacing between the control devices that makes effective use of the surplus power for the sample area.
Abstract: With the prevalence of computer and development of information technology, Geographic Information Systems (GIS) have long used for a variety of applications in electrical engineering. GIS are designed to support the analysis, management, manipulation and mapping of spatial data. This paper presents several usages of GIS in power utilities such as automated route selection for the construction of new power lines which uses a dynamic programming model for route optimization, load forecasting and optimizing planning of substation-s location and capacity with comprehensive algorithm which involves an accurate small-area electric load forecasting procedure and simulates the different cost functions of substations.
Abstract: In this paper, a multi-branch power line is modeled using ABCD matrix to show its worth as a communication channel. The model is simulated using MATLAB in an effort to investigate the effects of multiple loading, multipath, and those as a result of load mismatching. The channel transfer function is obtained and investigated using different cable lengths, and different number of bridge taps under given loading conditions.
Abstract: When a lightning strike falls near an overhead power
line, the intense electromagnetic field radiated by the current of the
lightning return stroke coupled with power lines and there induced
transient overvoltages, which can cause a back-flashover in electrical
network. The indirect lightning represents a major danger owing to
the fact that it is more frequent than that which results from the direct
strikes.
In this paper we present an analysis of the electromagnetic
coupling between an external electromagnetic field generated by the
lightning and an electrical overhead lines, so we give an important
and original contribution: We are based on our experimental
measurements which we carried in the high voltage laboratories of
EPFL in Switzerland during the last trimester of 2005, on the recent
works of other authors and with our mathematical improvement a
new particular analytical expression of the electromagnetic field
generated by the lightning return stroke was developed and presented
in this paper. The results obtained by this new electromagnetic field
formulation were compared with experimental results and give a
reasonable approach.
Abstract: An electric power system includes a generating, a
transmission, a distribution, and consumers subsystems. An electrical
power network in Tanzania keeps growing larger by the day and
become more complex so that, most utilities have long wished for
real-time monitoring and remote control of electrical power system
elements such as substations, intelligent devices, power lines,
capacitor banks, feeder switches, fault analyzers and other physical
facilities. In this paper, the concept of automation of management of
power systems from generation level to end user levels was
determined by using Power System Simulator for Engineering
(PSS/E) version 30.3.2.
Abstract: This paper presents an application of power line
carrier (PLC) for electrical power telemetering. This system has a
special capability of transmitting the measured values to a centralized
computer via power lines. The PLC modem as a passive high-pass
filter is designed for transmitting and receiving information. Its
function is to send the information carrier together with transmitted
data by superimposing it on the 50 Hz power frequency signal. A
microcontroller is employed to function as the main processing of the
modem. It is programmed for PLC control and interfacing with other
devices. Each power meter, connected via a PLC modem, is assigned
with a unique identification number (address) for distinguishing each
device from one another.
Abstract: High-voltage power transmission lines are the back
bone of electrical power utilities. The stability and continuous
monitoring of this critical infrastructure is pivotal. Nine-Sigma
representing Eskom Holding SOC limited, South Africa has a major
problem on proactive detection of fallen power lines and real time
sagging measurement together with slipping of such conductors. The
main objective of this research is to innovate RFID technology to
solve this challenge. Various options and technologies such as GPS,
PLC, image processing, MR sensors and etc., have been reviewed
and draw backs were made. The potential of RFID to give precision
measurement will be observed and presented. The future research
will look at magnetic and electrical interference as well as corona
effect on the technology.