Abstract: With the prevalence of computer and development of information technology, Geographic Information Systems (GIS) have long used for a variety of applications in electrical engineering. GIS are designed to support the analysis, management, manipulation and mapping of spatial data. This paper presents several usages of GIS in power utilities such as automated route selection for the construction of new power lines which uses a dynamic programming model for route optimization, load forecasting and optimizing planning of substation-s location and capacity with comprehensive algorithm which involves an accurate small-area electric load forecasting procedure and simulates the different cost functions of substations.
Abstract: In this paper, the transformers over-load problem of Shiraz substation in Fars Regional Electric Company (FREC) is investigated for a period of three years plan. So the suggestions for using phase shifting transformer (PST) and unified power flow controller (UPFC) in order to solve this problem are examined in details and finally, some economical and practical designs will be given in order to solve the related problems. Practical consideration and using the basic and fundamental concept of powers in transmission lines in order to find the economical design are the main advantages of this research. The simulation results of the integrated overall system with different designs compare them base on economical and practical aspects to solve the over-load and loss-reduction.
Abstract: Series compensators have been used for many years,
to increase the stability and load ability of transmission line. They
compensate retarded or advanced volt drop of transmission lines
by placing advanced or retarded voltage in series with them to
compensate the effective reactance, which cause to increase load
ability of transmission lines. In this paper, two method of fuzzy
controller, based on power reference tracking and impedance
reference tracking have been developed on TCSC controller in
order to increase load ability and improving power oscillation
damping of system. In these methods, fire angle of thyristors are
determined directly through the special Rule-bases with the error
and change of error as the inputs. The simulation results of two
area four- machines power system show the good performance of
power oscillation damping in system. Comparison of this method
with classical PI controller shows the increasing speed of system
response in power oscillation damping.