Abstract: Planning community has been long discussing emerging paradigms within the planning theory in the face of the changing conditions of the world order. The paradigm shift concept was introduced by Thomas Kuhn, in 1960, who claimed the necessity of shifting within scientific knowledge boundaries; and following him in 1970 Imre Loktas also gave priority to the emergence of multi-paradigm societies [24]. Multi-paradigm is changing our predetermined lifeworld through uncertainties. Those uncertainties are reflected in two sides, the first one is uncertainty as a concept of possibility and creativity in public sphere and the second one is uncertainty as a risk. Therefore, it is necessary to apply a resilience planning approach to be more dynamic in controlling uncertainties which have the potential to transfigure present time and space definitions. In this way, stability of system can be achieved. Uncertainty is not only an outcome of worldwide changes but also a place-specific issue, i.e. it changes from continent to continent, a country to country; a region to region. Therefore, applying strategic spatial planning with respect to resilience principle contributes to: control, grasp and internalize uncertainties through place-specific strategies. In today-s fast changing world, planning system should follow strategic spatial projects to control multi-paradigm societies with adaptability capacities. Here, we have selected two alternatives to demonstrate; these are; 1.Tehran (Iran) from the Middle East 2.Bath (United Kingdom) from Europe. The study elaborates uncertainties and particularities in their strategic spatial planning processes in a comparative manner. Through the comparison, the study aims at assessing place-specific priorities in strategic planning. The approach is to a two-way stream, where the case cities from the extreme end of the spectrum can learn from each other. The structure of this paper is to firstly compare semi-periphery (Tehran) and coreperiphery (Bath) cities, with the focus to reveal how they equip to face with uncertainties according to their geographical locations and local particularities. Secondly, the key message to address is “Each locality requires its own strategic planning approach to be resilient.--
Abstract: MABENA model is a complementary model in
comparison with traditional models such as HCMS, CMS and etc.
New factors, which have effects on preparation of strategic plans and
their sequential order in MABENA model is the platform of
presented road map in this paper.Study review shows, factors such as
emerging new critical success factors for strategic planning,
improvement of international strategic models, increasing the
maturity of companies and emerging new needs leading to design a
new model which can be responsible for new critical factors and
solve the limitations of previous strategic management models.
Preparation of strategic planning need more factors than introduced
in traditional models. The needed factors includes determining future
Critical Success Factors and competencies, defining key processes,
determining the maturity of the processes, considering all aspects of
the external environment etc. Description of aforementioned
requirements, the outcomes and their order is developing and
presenting the MABENA model-s road map in this paper. This study
presents a road map for strategic planning of the Iranian
organizations.
Abstract: In this study, a reformer model simulation to use
refinery (Farashband refinery, Iran) waste natural gas. In the
petroleum and allied sectors where natural gas is being encountered
(in form of associated gas) without prior preparation for its positive
use, its combustion (which takes place in flares, an equipment through
which they are being disposed) has become a great problem because
of its associated environmental problems in form of gaseous emission.
The proposed model is used to product syngas from waste natural gas.
A detailed steady model described by a set of ordinary differential and
algebraic equations was developed to predict the behavior of the
overall process. The proposed steady reactor model was validated
against process data of a reformer synthesis plant recorded and a good
agreement was achieved. H2/CO ratio has important effect on Fischer-
Tropsch synthesis reactor product and we try to achieve this parameter
with best designing reformer reactor. We study different kind of
reformer reactors and then select auto thermal reforming process of
natural gas in a fixed bed reformer that adjustment H2/CO ratio with
CO2 and H2O injection. Finally a strategy was proposed for prevention
of extra natural gas to atmosphere.
Abstract: The presence of heavy metals in the environment
could constitute a hazard to food security and public health. These
can be accumulated in aquatic animals such as fish. Samples of four
popular brands of canned fish in the Iranian market (yellowfin tuna,
common Kilka, Kawakawa and longtail tuna) were analyzed for level
of Cr after wet digestion with acids using graphite furnace atomic
absorption spectrophotometry. The mean concentrations for Cr in the
different brands were: 2.57, 3.24, 3.16 and 1.65 μg/g for brands A, B,
C and D respectively. Significant differences were observed in the Cr
levels between all of the different brands of canned fish evaluated in
this study. The Cr concentrations for the varieties of canned fishes
were generally within the FAO/WHO, U.S. FDA and U.S. EPA
recommended limits for fish.
Abstract: In recent years, tuned mass damper (TMD) control systems for civil engineering structures have attracted considerable attention. This paper emphasizes on the application of particle swarm application (PSO) to design and optimize the parameters of the TMD control scheme for achieving the best results in the reduction of the building response under earthquake excitations. The Integral of the Time multiplied Absolute value of the Error (ITAE) based on relative displacement of all floors in the building is taken as a performance index of the optimization criterion. The problem of robustly TMD controller design is formatted as an optimization problem based on the ITAE performance index to be solved using the PSO technique which has a story ability to find the most optimistic results. An 11- story realistic building, located in the city of Rasht, Iran is considered as a test system to demonstrate effectiveness of the proposed method. The results analysis through the time-domain simulation and some performance indices reveals that the designed PSO based TMD controller has an excellent capability in reduction of the seismically excited example building.
Abstract: Natural disasters, including earthquake, kill many people around the world every year. Society rescue actions, which start after the earthquake and are called LAST in abbreviation, include locating, access, stabilization and transportation. In the present article, we have studied the process of local accessibility to the injured and transporting them to health care centers. With regard the heavy traffic load due to earthquake, the destruction of connecting roads and bridges and the heavy debris in alleys and street, which put the lives of the injured and the people buried under the debris in danger, accelerating the rescue actions and facilitating the accessibilities are of great importance, obviously. Tehran, the capital of Iran, is among the crowded cities in the world and is the center of extensive economic, political, cultural and social activities. Tehran has a population of about 9.5 millions and because of the immigration of people from the surrounding cities. Furthermore, considering the fact that Tehran is located on two important and large faults, a 6 Richter magnitude earthquake in this city could lead to the greatest catastrophe during the entire human history. The present study is a kind of review and a major part of the required information for it, has been obtained from libraries all of the rescue vehicles around the world, including rescue helicopters, ambulances, fire fighting vehicles and rescue boats, and their applied technology, and also the robots specifically designed for the rescue system and the advantages and disadvantages of them, have been investigated. The studies show that there is a significant relationship between the rescue team-s arrival time at the incident zone and the number of saved people; so that, if the duration of burial under debris 30 minutes, the probability of survival is %99.3, after a day is %81, after 2days is %19 and after 5days is %7.4. The exiting transport systems all have some defects. If these defects are removed, more people could be saved each hour and the preparedness against natural disasters is increased. In this study, transport system has been designed for the rescue team and the injured; which could carry the rescue team to the incident zone and the injured to the health care centers. In addition, this system is able to fly in the air and move on the earth as well; so that the destruction of roads and the heavy traffic load could not prevent the rescue team from arriving early at the incident zone. The system also has the equipment required firebird for debris removing, optimum transport of the injured and first aid.
Abstract: Electronic Government is one of the special concepts
which has been performed successfully within recent decades.
Electronic government is a digital, wall-free government with a
virtual organization for presenting of online governmental services
and further cooperation in different political/social activities. In order
to have a successful implementation of electronic government
strategy and benefiting from its complete potential and benefits and
generally for establishment and applying of electronic government, it
is necessary to have different infrastructures as the basics of
electronic government with lack of which it is impossible to benefit
from mentioned services. For this purpose, in this paper we have
managed to recognize relevant obstacles for establishment of
electronic government in Iran. All required data for recognition of
obstacles were collected from statistical society of involved
specialists of Ministry of Communications & Information
Technology of Iran and Information Technology Organization of
Tehran Municipality through questionnaire. Then by considering of
five-point Likert scope and μ =3 as the index of relevant factors of
proposed model, we could specify current obstacles against
electronic government in Iran along with some guidelines and
proposal in this regard. According to the results, mentioned obstacles
for applying of electronic government in Iran are as follows:
Technical & technological problems, Legal, judicial & safety
problems, Economic problems and Humanistic Problems.
Abstract: The ITE Project is a project that has 1800 km length
and across the Turkey's land through east to west. The project of
pipeline enters geographically from Iran to Doğubayazit (Turkey) in
the east, exits to Greece from Ipsala province of Turkey in the west.
This project is the one of the international projects in such scale that
provides the natural gas of Iran and Caspian Sea through the
European continent. In this investigation, some information will be
given about the methods used to verify the direction of the pipeline
and the technical properties of the results obtained. The cost of
project itself entirely depends on the direction of the pipeline which
would be as short as possible and the specifications of the land cover.
Production standards of 1/2000 scaled digital orthophoto and vectoral
maps as a results of the use of map production materials and methods
(such as high resolution satellite images, and digital aerial images
captured from digital aerial cameras), will also be given in this report.
According to Turkish national map production standards, TM
((Transversal Mercator, 3 degree) projection is used for large scale
map and UTM (Universal Transversal Mercator, 6 degree) is used for
small scale map production standards. Some information is also given
about the projection used in the ITE natural gas pipeline project.
Abstract: The p53 tumor suppressor gene plays two important
roles in genomic stability: blocking cell proliferation after DNA
damage until it has been repaired, and starting apoptosis if the
damage is too critical. Codon 72 exon4 polymorphism (Arg72Pro) of
the P53 gene has been implicated in cancer risk. Various studies have
been done to investigate the status of p53 at codon 72 for arginine
(Arg) and proline (Pro) alleles in different populations and also the
association of this codon 72 polymorphism with various tumors. Our
objective was to investigate the possible association between P53
Arg72Pro polymorphism and susceptibility to colorectal cancer
among Isfahan and Chaharmahal Va Bakhtiari (a part of south west
of Iran) population. We investigated the status of p53 at codon 72 for
Arg/Arg, Arg/Pro and Pro/Pro allele polymorphisms in blood
samples from 145 colorectal cancer patients and 140 controls by
Nested-PCR of p53 exon 4 and digestion with BstUI restriction
enzyme and the DNA fragments were then resolved by
electrophoresis in 2% agarose gel. The Pro allele was 279 bp, while
the Arg allele was restricted into two fragments of 160 and 119 bp.
Among the 145 colorectal cancer cases 49 cases (33.79%) were
homozygous for the Arg72 allele (Arg/Arg), 18 cases (12.41%) were
homozygous for the Pro72 allele (Pro/Pro) and 78 cases (53.8%)
found in heterozygous (Arg/Pro).
In conclusion, it can be said that p53Arg/Arg genotype may be
correlated with possible increased risk of this kind of cancers in south
west of Iran.
Abstract: Levan, an exopolysaccharide, was produced by
Microbacterium laevaniformans and its yield was characterized as a
function of concentrations of date syrup, sucrose and the fermentation
time. The optimum condition for levan production from sucrose was
at concentration of 20% sucrose for 48 h and for date syrup was 25%
for 48 h. The results show that an increase in fermentation time
caused a decrease in the levan production at all concentrations of date
syrup tested. Under these conditions after 48 h in sucrose medium,
levan production reached 48.9 g/L and for date syrup reached 10.48
g/L . The effect of pH on the yield of the purified levan was examined
and the optimum pH for levan production was determined to be 6.0.
Levan was composed mainly of fructose residues when analyzed by
TLC and FT-IR spectroscopy. Date syrup is a cheap substrate widely
available in Iran and has potential for levan production. The thermal
stability of levan was assessed by Thermo Gravimetric Analysis
(TGA) that revealed the onset of decomposition near to 49°C for the
levan produced from sucrose and 51°C for the levan from date syrup.
DSC results showed a single Tg at 98°C for levan produced from
sucrose and 206 °C for levan from date syrup.
Abstract: This research deals with techno economic analysis to select the most economic desalination method for Asalouyeh combined cycle power plant . Due to lack of fresh water, desalination of sea water is necessary to provide required DM water of Power Plant. The most common desalination methods are RO, MSF, MED, and MED–TVC. In this research, methods of RO, MED, and MED– TVC have been compared. Simulation results show that recovery of heat of exhaust gas of main stack is optimum case for providing DM water required for injected steam of MED desalination. This subject is very important because of improving thermal efficiency of power plant using extra heat recovery. Also, it has been shown that by adding 3 rows of finned tube to de-aerator evaporator, which is very simple and low cost, required steam for generating 5200 m3/day of desalinated water is obtainable.
Abstract: Sedimentation is a hydraulic phenomenon that is
emerging as a serious challenge in river engineering. When the flow
reaches a certain state that gather potential energy, it shifts the
sediment load along channel bed. The transport of such materials can
be in the form of suspended and bed loads. The movement of these
along the river course and channels and the ways in which this could
influence the water intakes is considered as the major challenges for
sustainable O&M of hydraulic structures. This could be very serious
in arid and semi-arid regions like Iran, where inappropriate watershed
management could lead to shifting a great deal of sediments into the
reservoirs and irrigation systems. This paper aims to investigate
sedimentation in the Western Canal of Dez Diversion Weir in Iran,
identifying factors which influence the process and provide ways in
which to mitigate its detrimental effects by using the SHARC
Software.
For the purpose of this paper, data from the Dezful water authority
and Dezful Hydrometric Station pertinent to a river course of about 6
Km were used.
Results estimated sand and silt bed loads concentrations to be 193
ppm and 827ppm respectively. Given the available data on average
annual bed loads and average suspended sediment loads of 165ppm
and 837ppm, there was a significant statistical difference (16%)
between the sand grains, whereas no significant difference (1.2%)
was find in the silt grain sizes. One explanation for such finding
being that along the 6 Km river course there was considerable
meandering effects which explains recent shift in the hydraulic
behavior along the stream course under investigation. The sand
concentration in downstream relative to present state of the canal
showed a steep descending curve. Sediment trapping on the other
hand indicated a steep ascending curve. These occurred because the
diversion weir was not considered in the simulation model.
Abstract: In this paper, Lattice Boltzmann Method (LBM) is used to study laminar flow with mixed convection heat transfer inside a two-dimensional inclined lid-driven rectangular cavity with aspect ratio AR = 3. Bottom wall of the cavity is maintained at lower temperature than the top lid, and its vertical walls are assumed insulated. Top lid motion results in fluid motion inside the cavity. Inclination of the cavity causes horizontal and vertical components of velocity to be affected by buoyancy force. To include this effect, calculation procedure of macroscopic properties by LBM is changed and collision term of Boltzmann equation is modified. A computer program is developed to simulate this problem using BGK model of lattice Boltzmann method. The effects of the variations of Richardson number and inclination angle on the thermal and flow behavior of the fluid inside the cavity are investigated. The results are presented as velocity and temperature profiles, stream function contours and isotherms. It is concluded that LBM has good potential to simulate mixed convection heat transfer problems.
Abstract: The study of interaction among the grain, moisture,
and the surrounding space (air) is key to understanding the graindrying
process. In Iran, rice (mostly Indica type) is dried by flat
bed type dryer until the final MC reaches to 6 to 8%. The
experiments were conducted to examine the effect of application of
discharge fan with different heights of paddy on the drying
efficiency. Experiments were designed based on two different
configurations of the drying methods; with and without discharge
fan with three different heights of paddy including; 5, 10, and 15
cm. The humid heated air will be going out immediately by the
suction of discharge fan. The drying time is established upon the
average final MC to achieve about 8%. To save energy and reduce
the drying time, the distribution of temperature between layers
should be fast and uniform with minimum difference; otherwise
the difference of MC gradient between layers will be high and will
induce grain breakage. The difference of final MC between layers
in the two methods was 48-73%. The steady state of temperature
between the two methods has saved time in the range of 10-20%,
and the efficiency of temperature distribution increased 17-26% by
the use of discharge fan.
Abstract: Estimation time and cost of work completion in a
project and follow up them during execution are contributors to
success or fail of a project, and is very important for project
management team. Delivering on time and within budgeted cost
needs to well managing and controlling the projects. To dealing with
complex task of controlling and modifying the baseline project
schedule during execution, earned value management systems have
been set up and widely used to measure and communicate the real
physical progress of a project. But it often fails to predict the total
duration of the project. In this paper data mining techniques is used
predicting the total project duration in term of Time Estimate At
Completion-EAC (t). For this purpose, we have used a project with
90 activities, it has updated day by day. Then, it is used regular
indexes in literature and applied Earned Duration Method to
calculate time estimate at completion and set these as input data for
prediction and specifying the major parameters among them using
Clem software. By using data mining, the effective parameters on
EAC and the relationship between them could be extracted and it is
very useful to manage a project with minimum delay risks. As we
state, this could be a simple, safe and applicable method in prediction
the completion time of a project during execution.
Abstract: Autism spectrum disorder is characterized by
abnormalities in social communication, language abilities and
repetitive behaviors. The present study focused on some grammatical
deficits in autistic children. We evaluated the impairment of correct
use of different Persian verb tenses in autistic children-s speech. Two
standardized Language Test were administered then gathered data
were analyzed. The main result of this study was significant
difference between the mean scores of correct responses to present
tense in comparison with past tense in Persian language. This study
demonstrated that tense is severely impaired in autistic children-s
speech. Our findings indicated those autistic children-s production of
simple present/ past tense opposition to be better than production of
future and past periphrastic forms (past perfect, present perfect, past
progressive).
Abstract: In this study, the ability of Aspergillus niger and
Penicillium simplicissimum to extract heavy metals from a spent
refinery catalyst was investigated. For the first step, a spent
processing catalyst from one of the oil refineries in Iran was
physically and chemically characterized. Aspergillus niger and
Penicillium simplicissimum were used to mobilize Al/Co/Mo/Ni from
hazardous spent catalysts. The fungi were adapted to the mixture of
metals at 100-800 mg L-1 with increments in concentration of 100 mg
L-1. Bioleaching experiments were carried out in batch cultures. To
investigate the production of organic acids in sucrose medium,
analyses of the culture medium by HPLC were performed at specific
time intervals after inoculation. The results obtained from Inductive
coupled plasma-optical emission spectrometry (ICP-OES) showed
that after the one-step bioleaching process using Aspergillus niger,
maximum removal efficiencies of 27%, 66%, 62% and 38% were
achieved for Al, Co, Mo and Ni, respectively. However, the highest
removal efficiencies using Penicillium simplicissimum were of 32%,
67%, 65% and 38% for Al, Co, Mo and Ni, respectively
Abstract: A research project dealing with the phytoremediation
of a soil polluted by some heavy metals is currently running. The
case study is represented by a mining area in Hamedan province in
the central west part of Iran. The potential of phytoextraction and
phytostabilization of plants was evaluated considering the
concentration of heavy metals in the plant tissues and also the
bioconcentration factor (BCF) and the translocation factor (TF). Also
the several established criteria were applied to define
hyperaccumulator plants in the studied area. Results showed that
none of the collected plant species were suitable for phytoextraction
of Cu, Zn, Fe and Mn, but among the plants, Euphorbia macroclada
was the most efficient in phytostabilization of Cu and Fe, while,
Ziziphora clinopodioides, Cousinia sp. and Chenopodium botrys
were the most suitable for phytostabilization of Zn and Chondrila
juncea and Stipa barbata had the potential for phytostabilization of
Mn. Using the most common criterion, Euphorbia macroclada and
Verbascum speciosum were Fe hyperaccumulator plants. Present
study showed that native plant species growing on contaminated sites
may have the potential for phytoremediation.
Abstract: Soil organic carbon (SOC) plays a key role in soil
fertility, hydrology, contaminants control and acts as a sink or source
of terrestrial carbon content that can affect the concentration of
atmospheric CO2. SOC supports the sustainability and quality of
ecosystems, especially in semi-arid region. This study was
conducted to determine relative importance of 13 different
exploratory climatic, soil and geometric factors on the SOC contents
in one of the semiarid watershed zones in Iran. Two methods
canonical discriminate analysis (CDA) and feed-forward back
propagation neural networks were used to predict SOC. Stepwise
regression and sensitivity analysis were performed to identify
relative importance of exploratory variables. Results from sensitivity
analysis showed that 7-2-1 neural networks and 5 inputs in CDA
models output have highest predictive ability that explains %70 and
%65 of SOC variability. Since neural network models outperformed
CDA model, it should be preferred for estimating SOC.
Abstract: Work Breakdown Structure (WBS) is one of the
most vital planning processes of the project management since it
is considered to be the fundamental of other processes like
scheduling, controlling, assigning responsibilities, etc. In fact
WBS or activity list is the heart of a project and omission of a
simple task can lead to an irrecoverable result. There are some
tools in order to generate a project WBS. One of the most
powerful tools is mind mapping which is the basis of this article.
Mind map is a method for thinking together and helps a project
manager to stimulate the mind of project team members to
generate project WBS. Here we try to generate a WBS of a
sample project involving with the building construction using the
aid of mind map and the artificial intelligence (AI) programming
language. Since mind map structure can not represent data in a
computerized way, we convert it to a semantic network which can
be used by the computer and then extract the final WBS from the
semantic network by the prolog programming language. This
method will result a comprehensive WBS and decrease the
probability of omitting project tasks.