Socio-Demographic Effects on Digital Libraries Preference and Use: A Case Study at Higher Learning Institutions

Explosion in information management and information system technology has brought dramatic changes in learning and library system environments. The use of academic digital libraries does witness the spectacular impact on academic societies’ way of performing their study in Malaysia, a country with a multi-racial people. This paper highlights a research on examining the socio-demographic differences on the preference and use of academic digital libraries as compared to physical libraries at higher learning institutions. Findings indicate that preference towards digital libraries differed between ethnicity, gender and university. However none of the socio-demographic factors is statistically significant in terms of the use of digital libraries.

Poor Medical Waste Management (MWM) Practices and Its Risks to Human Health and the Environment: A Literature Review

Medical care is vital for our life, health and well-being. But the waste generated from medical activities can be hazardous, toxic and even lethal because of their high potential for diseases transmission. The hazardous and toxic parts of waste from healthcare establishments comprising infectious, medical and radioactive material as well as sharps constitute a grave risks to mankind and the environment, if these are not properly treated / disposed or are allowed to be mixed with other municipal waste. In Nigeria, practical information on this aspect is inadequate and research on the public health implications of poor management of medical wastes is few and limited in scope. Findings drawn from Literature particularly in the third world countries highlights financial problems, lack of awareness of risks involved in MWM, lack of appropriate legislation and lack of specialized MWM staff. The paper recommends how MWM practices can be improved in medical facilities.

Applications of Building Information Modeling (BIM) in Knowledge Sharing and Management in Construction

Construction knowledge can be referred to and reused among involved project managers and jobsite engineers to alleviate problems on a construction jobsite and reduce the time and cost of solving problems related to constructability. This paper proposes a new methodology to provide sharing of construction knowledge by using the Building Information Modeling (BIM) approach. The main characteristics of BIM include illustrating 3D CAD-based presentations and keeping information in a digital format, and facilitation of easy updating and transfer of information in the 3D BIM environment. Using the BIM approach, project managers and engineers can gain knowledge related to 3D BIM and obtain feedback provided by jobsite engineers for future reference. This study addresses the application of knowledge sharing management in the construction phase of construction projects and proposes a BIM-based Knowledge Sharing Management (BIMKSM) system for project managers and engineers. The BIMKSM system is then applied in a selected case study of a construction project in Taiwan to verify the proposed methodology and demonstrate the effectiveness of sharing knowledge in the BIM environment. The combined results demonstrate that the BIMKSM system can be used as a visual BIM-based knowledge sharing management platform by utilizing the BIM approach and web technology.

Study on Disaster Prevention Plan for an Electronic Industry in Thailand

In this article, a study of employee’s opinion to the factors that affect to the flood preventive and the corrective action plan in an electronic industry at the Sharp Manufacturing (Thailand) Co., Ltd. has been investigated. The surveys data of 175 workers and supervisors have, however, been selected for data analysis. The results is shown that the employees emphasize about the needs in a subsidy at the time of disaster at high levels of 77.8%, as the plan focusing on flood prevention of the rehabilitation equipment is valued at the intermediate level, which is 79.8%. Demonstration of the hypothesis has found that the different education levels has thus been affected to the needs factor at the flood disaster time. Moreover, most respondents give priority to flood disaster risk management factor. Consequently, we found that the flood prevention plan is valued at high level, especially on information monitoring, which is 93.4% for the supervisor item. The respondents largely assume that the flood will have impacts on the industry, up to 80%, thus to focus on flood management plans is enormous.

Education and Assessment of Civil Employees in e-Government: The Case of a Moodle Based Platform

One of the most important factors for the success of e-government is training and preparing the workforce of the public sector. As changes and innovation in the public sector progress at a very slow pace and more slowly than in the private sector, issues related to human resources require special care. This is because the workforce will eventually seize the opportunities of the technological solutions used in e-Government. Thus, the central administration should provide employees with continuous and focused training not only on new technologies but also on a wide range of subjects and also improve interdepartmental interaction. To achieve all this, new methods and training tools need to be implemented in addition to assessment of the employees. In this spirit, we propose the development of an educational platform with user personalization features. We propose the development of this platform using Moodle as the basic tool. Incorporating a personalization mechanism is very important since different employees have different backgrounds, education levels, computer skills, or different capability to develop further. Key features of the proposed platform include, besides typical e-learning tools, communities organized in order to exchange experiences and knowledge, groups of users based on certain criteria, automatic evaluation of users and potential self-education and self-assessment. In its fully developed form, this platform can be part of a more comprehensive knowledge management system for the public sector.

Enhance Construction Visual As-Built Schedule Management Using BIM Technology

Construction project control attempts to obtain real-time as-built schedule information and to eliminate project delays by effectively enhancing dynamic schedule control and management. Suitable platforms for enhancing an as-built schedule visually during the construction phase are necessary and important for general contractors. As the application of building information modeling (BIM) becomes more common, schedule management integrated with the BIM approach becomes essential to enhance visual construction management implementation for the general contractor during the construction phase. To enhance visualization of the updated as-built schedule for the general contractor, this study presents a novel system called the Construction BIM-assisted Schedule Management (ConBIM-SM) system for general contractors in Taiwan. The primary purpose of this study is to develop a web ConBIM-SM system for the general contractor to enhance visual as-built schedule information sharing and efficiency in tracking construction as-built schedule. Finally, the ConBIM-SM system is applied to a case study of a commerce building project in Taiwan to verify its efficacy and demonstrate its effectiveness during the construction phase. The advantages of the ConBIM-SM system lie in improved project control and management efficiency for general contractors, and in providing BIM-assisted as-built schedule tracking and management, to access the most current as-built schedule information through a web browser. The case study results show that the ConBIM-SM system is an effective visual as-built schedule management platform integrated with the BIM approach for general contractors in a construction project.

Web Application for University Internship Program Management

This paper discusses a software application to aid in the smooth functioning of a university internship program, including a student, faculty and an administration module. The software can also calculate the most apt combination of students to stations and allocate them respectively.

Capacity Flexibility within Production

Due to high dynamics in current markets the expectations regarding logistics increase steadily. However, the complexity and variety of products and production make it difficult to understand the interdependencies between logistical objectives and their determining factors. Therefore specific models are needed to meet this challenge. The Logistic Operating Curves Theory is such a model. With its aid the basic correlations between the logistic objectives can be described. Within this model the capacity flexibility represents an important parameter. However, a proper mathematical description for this parameter is still missing. Within this paper such a description will be developed in order to make the Logistic Operating Curves Theory more accurate.

Cloud Computing for E-Learning with More Emphasis on Security Issues

In today's world, success of most systems depend on the use of new technologies and information technology (IT) which aimed to increase efficiency and satisfaction of users. One of the most important systems that use information technology to deliver services is the education system. But for educational services in the form of E-learning systems, hardware and software equipment should be containing high quality, which requires substantial investment. Because the vast majority of educational establishments can not invest in this area so the best way for them is reducing the costs and providing the E-learning services by using cloud computing. But according to the novelty of the cloud technology, it can create challenges and concerns that the most noted among them are security issues. Security concerns about cloud-based E-learning products are critical and security measures essential to protect valuable data of users from security vulnerabilities in products. Thus, the success of these products happened if customers meet security requirements then can overcome security threats. In this paper tried to explore cloud computing and its positive impact on E- learning and put main focus to identify security issues that related to cloud-based E-learning efforts which have been improve security and provide solutions in management challenges.

Six Sigma in Mexican Manufacturing Companies

This work is about Six Sigma (SS) implementation in Mexico by using an empirical study. Main goals are to analyze the degree of importance of the Critical Success Factors (CSFs) of SS and to examine if these factors are grouped in some way. A literature research and a survey were conducted to capture SS practitioner’s viewpoint about CSFs in SS implementation and their impact on the performance within manufacturing companies located in Baja California, Mexico. Finally, a Principal Component Analysis showed that nine critical success factors could be grouped in three components, which are: management vision, implementation strategy, and collaborative team. In the other hand, SS’s success is represented by cost reduction, variation reduction, experience and self-esteem of the workers, and quality improvement. Concluding remarks arising from the study are that CSFs are changing through time and paying attention to these nine factors can increase SS’s success likelihood.

Assessing and Improving Ramp-Up Capability

In times when product life cycles are decreasing, while market demands are increasing, manufacturing enterprises are confronted with the challenge of more frequent and more complex ramp-ups. Thus it becomes obvious that ramp-up management is going to be a topic enterprises have to focus on in the future. Since each ramp-up is unique concerning the product, the process, the technology, the circumstances and the coaction of these four factors, the knowledge of the ramp-up situation and the current ramp-up capability of the enterprise are fundamental requirements for the subsequent improvement of the ramp-up capability of the production system. In this article a methodology is going to be presented which can be used to define typical production ramp-up situations, to identify the current ramp-up capability of a production system and to improve it with respect to a specific situation. Additionally there will be a description of the functionality of a software-tool developed based on this methodology.

Heat Generation Rate and Computational Simulation for Li-Ion Battery Module

In recent years Li-Ion batteries getting more attention among the Electrical Vehicles (EV) and Hybrid Electrical Vehicles (HEV) energy storage. Li-Ion has shown extended power density and light weight compared to other batteries readily available in the market. One of the major drawbacks in Li-Ion batteries is their sensitivity to the temperature. If the working temperature is beyond the limit, that could affect seriously on the durability and performance of Li-Ion battery. Thus Battery Thermal Management (BTM) is the most essential in adapting Li-Ion battery to the EVs and HEVs.

Benefits from a SMED Application in a Punching Machine

This paper presents an application of the Single-Minute Exchange of Die (SMED) methodology to a turret punching machine in an elevators company, in Portugal. The work was developed during five months, in the ambit of a master thesis in Industrial Engineering and Management. The Lean Production tool SMED was applied to reduce setup times in order to improve the production flexibility of the machine. The main results obtained were a reduction of 64% in setup time (from 15.1 to 5.4min), 50% in work-in-process amount (from 12.8 to 6.4 days) and 99% in the distance traveled by the operator during the internal period (from 136.7 to 1.7m). These improvements correspond to gains of about €7,315.38 per year.

Disturbances of the Normal Operation of Kosovo Power System Regarding Atmospheric Discharges

This paper discusses aspects of outages in the electric transmission network in the Kosovo Power System caused by the atmospheric discharges. Frequency and location of the atmospheric discharges in Kosovo territory will be provided by a lightning location system ALARM (Automated Lightning Alert and Risk Management) and from the data from the Meteorological Department in Prishtina International Airport. These data will be used to make comparisons with the actual outages registered in the Kosovo Power System from the Kosovo Transmission, systems and market operator (KOSTT) during a specific time period. The lines with the worst performance determined, regarding the atmospheric discharges, will be choose for further discussions in terms of over voltages caused by the direct or indirect lightning strokes. Recommendations for protection in terms of insulator coordination and surge arresters will be given at the end and in this stage dynamic simulation will take part.

Fundamental Variables of Final Account Closing Success in Construction Projects in Malaysia

Project management process starts from the planning stage up to the stage of completion (handover of buildings, preparation of the final accounts and the closing balance). Seeing as this process is not easy to be implemented efficiently and effectively, the issue of unsuccessful delivery as per contract in construction has become a major problem for construction projects. These issues have been blamed mainly on inefficient traditional construction practices that continue to dominate the current industry. This is due to several factors, such as environments of construction technology, sophisticated design and customer demand, that are constantly changing and influencing, either directly or indirectly, to the practice of management. Among the identified influences are physical environment, social environment, information environment, political and moral atmosphere. Therefore, this paper is emerged to determine the fundamental variables in the final account closing success in construction project. This aim can be achieved via its objectives of identifying the key constraints to the closing of final accounts in construction projects in Malaysia, investigating solutions to the identified constraints and analysing the relative levels of impact of the identified constraints. It is expected that this paper provides effective measures to avoid or at least reduce the problems in final account closing to the optimum level. It is also anticipated that the finding or outcome reported in this paper could address the unsuccessful contributors in final account closing and define tools for their mitigation for the better development of construction project.

A Critical Review on the Development of a Theoretical Framework for Managing Environmental Impacts of Construction Project

Construction industry is considered as one of the main contributor of natural resources depletion, responsible for high level pollution and it is one of the attributes that pose climate changes and other environmental threats. A lot of efforts had and have been done to reduce and control these impacts. Project Environmental Management (PEM) includes the processes required to ensure that the impacts of the project execution to the surrounding environment will remain within the limits stated in legal permits. The main aim of most of researches conducted managing Environmental Impacts (EI) is to protect earth planet from pollution. Those researches are presenting four major environmental elements; Environmental Management Systems (EMS), Environmental Design (ED), Environmental Planning (EP) and Environmental Impacts Assessments (EIA). Although everything has been said about environmental management for construction projects, but almost everything remains to be said and therefore to be explored or rediscovered because incontestably, almost everything remains to be done. This paper aimed at reviewing some of what has been said about PEM. Also one of its objectives is to explore and rediscover the whole view of managing the EI problems by proposing a framework that based on the relation between these environmental researches.

Tidal River Sediment Management–A Case Study in Southwestern Bangladesh

The problems of severe drainage congestion and water logging in the southwestern Bangladesh have been solved by an innovative concept, Tidal River Management (TRM). TRM involves the uniform raising of the land inside a tidal basin (beel) while simultaneously maintaining the proper drainage capacity in the river. The present practice of TRM is to link the river with the selected beel by constructing a link canal at the entrance of which most of the sedimentation takes place. This localized sedimentation also creates drainage congestion and water logging making it unattractive to landowners who participate in the program. In this paper a functional sediment management plan is presented to get rid of this problem

Early-Warning Lights Classification Management System for Industrial Parks in Taiwan

This paper presents the early-warning lights classification management system for industrial parks promoted by the Taiwan Environmental Protection Administration (EPA) since 2011, including the definition of each early-warning light, objectives, action program and accomplishments. All of the 151 industrial parks in Taiwan were classified into four early-warning lights, including red, orange, yellow and green, for carrying out respective pollution management according to the monitoring data of soil and groundwater quality, regulatory compliance, and regulatory listing of control site or remediation site. The Taiwan EPA set up a priority list for high potential polluted industrial parks and investigated their soil and groundwater qualities based on the results of the light classification and pollution potential assessment. In 2011-2013, there were 44 industrial parks selected and carried out different investigation, such as the early warning groundwater well networks establishment and pollution investigation/verification for the red and orange-light industrial parks and the environmental background survey for the yellow-light industrial parks. Among them, 22 industrial parks were newly or continuously confirmed that the concentrations of pollutants exceeded those in soil or groundwater pollution control standards. Thus, the further investigation, groundwater use restriction, listing of pollution control site or remediation site, and pollutant isolation measures were implemented by the local environmental protection and industry competent authorities; the early warning lights of those industrial parks were proposed to adjust up to orange or red-light. Up to the present, the preliminary positive effect of the soil and groundwater quality management system for industrial parks has been noticed in several aspects, such as environmental background information collection, early warning of pollution risk, pollution investigation and control, information integration and application, and inter-agency collaboration. Finally, the work and goal of self-initiated quality management of industrial parks will be carried out on the basis of the inter-agency collaboration by the classified lights system of early warning and management as well as the regular announcement of the status of each industrial park.

Quality Management in Public e-Administration

Since the late 1970s, quality management has become an important tool for achieving a high quality of public e-administration services in many countries. Very important part of quality management in e-administration is measurement of quality indicators related to this sector. Therefore, this paper gives a description of e-administration, including statistics about it and other examples from many countries worldwide, as well as the explanation of quality management in public e-administration. The paper also gives a list and description of quality indicators relevant to e-administration, as part of quality management within the e-administration. Through a literature review and best practices, the paper aims to analyze quality indicators measurement and other parts of good quality management when it comes to the public e-administration and consequently to show the usefulness of quality management in public e-administration in order to provide services of high quality.

A Study of Priority Evaluation and Resource Allocation for Revitalization of Cultural Heritages in the Urban Development

Proper maintenance and preservation of significant cultural heritages or historic buildings is necessary. It can not only enhance environmental benefits and a sense of community, but also preserve a city's history and people’s memory. It allows the next generation to be able to get a glimpse of our past, and achieve the goal of sustainable preserved cultural assets. However, the management of maintenance work has not been appropriate for many designated heritages or historic buildings so far. The planning and implementation of the reuse has yet to have a breakthrough specification. It leads the heritages to a mere formality of being “reserved”, instead of the real meaning of “conservation”. For the restoration and preservation of cultural heritages study issues, it is very important due to the consideration of historical significance, symbolism, and economic benefits effects. However, the decision makers such as the officials from public sector they often encounter which heritage should be prioritized to be restored first under the available limited budgets. Only very few techniques are available today to determine the appropriately restoration priorities for the diverse historical heritages, perhaps because of a lack of systematized decision-making aids been proposed before. In the past, the discussions of management and maintenance towards cultural assets were limited to the selection of reuse alternatives instead of the allocation of resources. In view of this, this research will adopt some integrated research methods to solve the existing problems that decision-makers might encounter when allocating resources in the management and maintenance of heritages and historic buildings. The purpose of this study is to develop a sustainable decision making model for local governments to resolve these problems. We propose an alternative decision support model to prioritize restoration needs within the limited budgets. The model is constructed based on fuzzy Delphi, fuzzy analysis network process (FANP) and goal programming (GP) methods. In order to avoid misallocate resources; this research proposes a precise procedure that can take multi-stakeholders views, limited costs and resources into consideration. Also, the combination of many factors and goals has been taken into account to find the highest priority and feasible solution results. To illustrate the approach we propose in this research, seven cultural heritages in Taipei city as one example has been used as an empirical study, and the results are in depth analyzed to explain the application of our proposed approach.