P-ACO Approach to Assignment Problem in FMSs

One of the most important problems in production planning of flexible manufacturing system (FMS) is machine tool selection and operation allocation problem that directly influences the production costs and times .In this paper minimizing machining cost, set-up cost and material handling cost as a multi-objective problem in flexible manufacturing systems environment are considered. We present a 0-1 integer linear programming model for the multiobjective machine tool selection and operation allocation problem and due to the large scale nature of the problem, solving the problem to obtain optimal solution in a reasonable time is infeasible, Paretoant colony optimization (P-ACO) approach for solving the multiobjective problem in reasonable time is developed. Experimental results indicate effectiveness of the proposed algorithm for solving the problem.

Anti-Counterfeiting Solution Employing Mobile RFID Environment

EPC Class-1 Generation-2 UHF tags, one of Radio frequency identification or RFID tag types, is expected that most companies are planning to use it in the supply chain in the short term and in consumer packaging in the long term due to its inexpensive cost. Because of the very cost, however, its resources are extremely scarce and it is hard to have any valuable security algorithms in it. It causes security vulnerabilities, in particular cloning the tags for counterfeits. In this paper, we propose a product authentication solution for anti-counterfeiting at application level in the supply chain and mobile RFID environment. It aims to become aware of distribution of spurious products with fake RFID tags and to provide a product authentication service to general consumers with mobile RFID devices like mobile phone or PDA which has a mobile RFID reader. We will discuss anti-counterfeiting mechanisms which are required to our proposed solution and address requirements that the mechanisms should have.

The Impact of ERP Systems on Accounting Processes

Advances in information technology, recent changes in business environment, globalization, deregulation, privatization have made running a successful business more difficult than ever before. To remain successful and to be competitive have forced companies to react to the new changes in order to survive and succeed. The implementation of an Enterprise Resource planning (ERP) system improves information flow, reduce costs, establish linkage with suppliers and reduce response time to customer needs. This paper focuses on a sample of Greek companies, investigates the ERP market in Greece, the reasons why the Greek companies are investing in ERP systems, the benefits that users have achieved and the influence of ERP systems on the use of new accounting practices. The results indicate a greater level on information integration, flexibility in information access and greater functionality provided by ERP systems but little influence on the use of new accounting practices.

Regional Security Issue: Central Asian Countries and NATO Cooperation (On the Example of Kazakhstan)

Kazakhstan attaches the great importance to cooperation with European countries within the framework of multilateral security organizations such as NATO. Cooperation of Kazakhstan with the NATO is a prominent aspect of strengthening of regional security of republic. It covers a wide spectrum of areas, such as reform of sector of defense and security, military operative compatibility of armed forces of NATO member-countries and Kazakhstan, civil emergency planning and scientific cooperation. The cooperation between Kazakhstan and NATO is based on the mutual interests of neighboring republics in the region so that the existing forms of cooperation between Kazakhstan and NATO will not be negatively perceived both in Asia as well as among CIS countries. Kazakhstan tailors its participation in the PfP programme through an annual Individual Partnership Programme, selecting those activities that will help achieve the goals it has set in the IPAP. Level of cooperation within the limits of PfP essentially differs on each republic. Cooperation with Kazakhstan progressed most of all since has been signed IPAP from the NATO

A Microscopic Simulation Model for Earthmoving Operations

Earthmoving operations are a major part of many construction projects. Because of the complexity and fast-changing environment of such operations, the planning and estimating are crucial on both planning and operational levels. This paper presents the framework ofa microscopic discrete-event simulation system for modeling earthmoving operations and conducting productivity estimations on an operational level.A prototype has been developed to demonstrate the applicability of the proposed framework, and this simulation system is presented via a case study based on an actual earthmoving project. The case study shows that the proposed simulation model is capable of evaluating alternative operating strategies and resource utilization at a very detailed level.

Solving Part Type Selection and Loading Problem in Flexible Manufacturing System Using Real Coded Genetic Algorithms – Part I: Modeling

This paper and its companion (Part 2) deal with modeling and optimization of two NP-hard problems in production planning of flexible manufacturing system (FMS), part type selection problem and loading problem. The part type selection problem and the loading problem are strongly related and heavily influence the system-s efficiency and productivity. The complexity of the problems is harder when flexibilities of operations such as the possibility of operation processed on alternative machines with alternative tools are considered. These problems have been modeled and solved simultaneously by using real coded genetic algorithms (RCGA) which uses an array of real numbers as chromosome representation. These real numbers can be converted into part type sequence and machines that are used to process the part types. This first part of the papers focuses on the modeling of the problems and discussing how the novel chromosome representation can be applied to solve the problems. The second part will discuss the effectiveness of the RCGA to solve various test bed problems.

Value Stream Oriented Inventory Management

Producing companies aspire to high delivery availability despite appearing disruptions. To ensure high delivery availability safety stocksare required. Howeversafety stock leads to additional capital commitment and compensates disruptions instead of solving the reasons.The intention is to increase the stability in production by configuring the production planning and control systematically. Thus the safety stock can be reduced. The largest proportion of inventory in producing companies is caused by batch inventory, schedule deviations and variability of demand rates.These reasons for high inventory levels can be reduced by configuring the production planning and control specifically. Hence the inventory level can be reduced. This is enabled by synchronizing the lot size straightening the demand as well as optimizing the releasing order, sequencing and capacity control.

Strategic Management via System Dynamics Simulation Models

This paper examines the problem of strategic management in highly turbulent dynamic business environmental conditions. As shown the high complexity of the problem can be managed with the use of System Dynamics Models and Computer Simulation in obtaining insights, and thorough understanding of the interdependencies between the organizational structure and the business environmental elements, so that effective product –market strategies can be designed. Simulation reveals the underlying forces that hold together the structure of an organizational system in relation to its environment. Such knowledge will contribute to the avoidance of fundamental planning errors and enable appropriate proactive well focused action.

Role of GIS in Distribution Power Systems

With the prevalence of computer and development of information technology, Geographic Information Systems (GIS) have long used for a variety of applications in electrical engineering. GIS are designed to support the analysis, management, manipulation and mapping of spatial data. This paper presents several usages of GIS in power utilities such as automated route selection for the construction of new power lines which uses a dynamic programming model for route optimization, load forecasting and optimizing planning of substation-s location and capacity with comprehensive algorithm which involves an accurate small-area electric load forecasting procedure and simulates the different cost functions of substations.

Multi-Criteria Decision Analysis in Planning of Asbestos-Containing Waste Management

Environmental decision making, particularly about hazardous waste management, is inherently exposed to a high potential conflict, principally because of the trade-off between sociopolitical, environmental, health and economic factors. The need to plan complex contexts has led to an increasing request for decision analytic techniques as support for the decision process. In this work, alternative systems of asbestos-containing waste management (ACW) in Puglia (Southern Italy) were explored by a multi-criteria decision analysis. In particular, through Analytic Hierarchy Process five alternatives management have been compared and ranked according to their performance and efficiency, taking into account environmental, health and socio-economic aspects. A separated valuation has been performed for different temporal scale. For short period results showed a narrow deviation between the disposal alternatives “mono-material landfill in public quarry" and “dedicate cells in existing landfill", with the best performance of the first one. While for long period “treatment plant to eliminate hazard from asbestos-containing waste" was prevalent, although high energy demand required to achieve the change of crystalline structure. A comparison with results from a participative approach in valuation process might be considered as future development of method application to ACW management.

Evaluation of Geosynthetic Forces in GRSRW under Dynamic Condition

Geosynthetics have proved to be suitable for reinforced soil retaining walls. Based on the increasing uses of geosynthetic reinforced soil systems in the regions, which bear frequent earthquakes, the study of dynamic behavior of structures seems necessary. Determining the reinforcement forces is; therefore, one of the most important and main points of discussions in designing retaining walls, by which we prevent from conservative planning. Thus, this paper intended to investigate the effects of such parameters as wall height, acceleration type, vertical spacing of reinforcement, type of reinforcement and soil type on forces and deformation through numerical modeling of the geosynthetic reinforced soil retaining walls (GRSRW) under dynamic loading with finite difference method by using FLAC. The findings indicate rather positive results with each parameter.

Places of Tourist Attraction: Planning Sustainable Fruition by Preserving Place Identity

Massive use of places with strong tourist attraction with the consequent possibility of losing place-identity produces harmful effects on cities and their users. In order to mitigate this risk, areas close to such places can be identified so as to widen the visitor-s range of action and offer alternative activities integrated with the main site. The cultural places and appropriate activities can be identified using a method of analysis and design able to trace the identity of the places, their characteristics and potential, and to provide a sustainable improvement. The aim of this work is to propose PlaceMaker as a method of urban analysis and design which both detects elements that do not feature in traditional mapping and which constitute the contemporary identity of the places, and identifies appropriate project interventions. Two final complex maps – the first of analysis and the second of design – respectively represent the identity of places and project interventions. In order to illustrate the method-s potential; the results of the experimentation carried out in the Trevi-Pantheon route in Rome and the appropriate interventions to decongest the area are illustrated.

Optimum Neural Network Architecture for Precipitation Prediction of Myanmar

Nowadays, precipitation prediction is required for proper planning and management of water resources. Prediction with neural network models has received increasing interest in various research and application domains. However, it is difficult to determine the best neural network architecture for prediction since it is not immediately obvious how many input or hidden nodes are used in the model. In this paper, neural network model is used as a forecasting tool. The major aim is to evaluate a suitable neural network model for monthly precipitation mapping of Myanmar. Using 3-layerd neural network models, 100 cases are tested by changing the number of input and hidden nodes from 1 to 10 nodes, respectively, and only one outputnode used. The optimum model with the suitable number of nodes is selected in accordance with the minimum forecast error. In measuring network performance using Root Mean Square Error (RMSE), experimental results significantly show that 3 inputs-10 hiddens-1 output architecture model gives the best prediction result for monthly precipitation in Myanmar.

Developing Efficient Testing and Unloading Procedures for a Local Sewage Holding Pit

A local municipality has decided to build a sewage pit to receive residential sewage waste arriving by tank trucks. Daily accumulated waste are to be pumped to a nearby waste water treatment facility to be re-consumed for agricultural and construction projects. A discrete-event simulation model using Arena Software was constructed to assist in defining the capacity of the system in cubic meters, number of tank trucks to use the system, number of unload docks required, number of standby areas needed and manpower required for data collection at entrance checkpoint and truck tank load toxicity testing. The results of the model are statistically validated. Simulation turned out to be an excellent tool in the facility planning effort for the pit project, as it insured smooth flow lines of tank trucks load discharge and best utilization of facilities on site.

Take Me to the Bus Stop: AR Based Assistance System for Public Transit Users

Route bus system is the fundamental public transportation system and has an important role in every province. To improve the usability of it greatly, we develop an AR application for "Bus- Net". The Bus-Net system is the shortest path planning system. Bus-Net supports bus users to make a plan to change buses by providing them with information about the direction. However, with Bus-Net, these information are provided in text-base. It is difficult to understand them for the person who does not know the place. We developed the AR application for Bus-Net. It supports the action of a bus user in an innovative way by putting information on a camera picture and leading the way to a bus stop. The application also inform the user the correct bus to get, the direction the bus takes and the fare, which ease many anxieties and worries people tend to feel when they take buses.

Estimating the Costs of Conservation in Multiple Output Agricultural Setting

Scarcity of resources for biodiversity conservation gives rise to the need of strategic investment with priorities given to the cost of conservation. While the literature provides abundant methodological options for biodiversity conservation; estimating true cost of conservation remains abstract and simplistic, without recognising dynamic nature of the cost. Some recent works demonstrate the prominence of economic theory to inform biodiversity decisions, particularly on the costs and benefits of biodiversity however, the integration of the concept of true cost into biodiversity actions and planning are very slow to come by, and specially on a farm level. Conservation planning studies often use area as a proxy for costs neglecting different land values as well as protected areas. These literature consider only heterogeneous benefits while land costs are considered homogenous. Analysis with the assumption of cost homogeneity results in biased estimation; since not only it doesn’t address the true total cost of biodiversity actions and plans, but also it fails to screen out lands that are more (or less) expensive and/or difficult (or more suitable) for biodiversity conservation purposes, hindering validity and comparability of the results. Economies of scope” is one of the other most neglected aspects in conservation literature. The concept of economies of scope introduces the existence of cost complementarities within a multiple output production system and it suggests a lower cost during the concurrent production of multiple outputs by a given farm. If there are, indeed, economies of scope then simplistic representation of costs will tend to overestimate the true cost of conservation leading to suboptimal outcomes. The aim of this paper, therefore, is to provide first road review of the various theoretical ways in which economies of scope are likely to occur of how they might occur in conservation. Consequently, the paper addresses gaps that have to be filled in future analysis.

Reduce the Complexity of Material Requirement Planning on Excel by an Algorithm

Many companies have excel, it is economy and well perform to use in material requirement planning (MRP) on excel. For several products, it, however, is complex problem to link the relationship between the tables of products because the relationship depends on bill of material (BOM). This paper presents algorithm to create MRP on excel, and links relationship between tables. The study reveals MRP that is created by the algorithm which is easier and faster than MRP that created by human. By this technique, MRP on excel might be good ways to improve a productivity of companies.

Motion Planning and Control of Autonomous Robots in a Two-dimensional Plane

This paper proposes a solution to the motion planning and control problem of a point-mass robot which is required to move safely to a designated target in a priori known workspace cluttered with fixed elliptical obstacles of arbitrary position and sizes. A tailored and unique algorithm for target convergence and obstacle avoidance is proposed that will work for any number of fixed obstacles. The control laws proposed in this paper also ensures that the equilibrium point of the given system is asymptotically stable. Computer simulations with the proposed technique and applications to a planar (RP) manipulator will be presented.

Enabling Factors towards Safety Improvement for Industrialised Building System (IBS)

The utilisation of Industrial Building System (IBS) in construction industry will lead to a safe site condition since minimum numbers of workers are required to be on-site, timely material delivery, systematic component storage, reduction of construction material and waste. These matters are being promoted in the Construction Industry Master Plan (CIMP 2006-2015). However, the enabling factors of IBS that will foster a safer working environment are indefinite; on that basis a research has been conducted. The purpose of this paper is to discuss and identify the relevant factors towards safety improvement for IBS. A quantitative research by way of questionnaire surveys have been conducted to 314 construction companies. The target group was Grade 5 to Grade 7 contractors registered with Construction Industry Development Board (CIDB) which specialise in IBS. The findings disclosed seven factors linked to the safety improvement of IBS construction site in Malaysia. The factors were historical, economic, psychological, technical, procedural, organisational and the environmental factors. From the findings, a psychological factor ranked as the highest and most crucial factor contributing to safer IBS construction site. The psychological factor included the self-awareness and influences from workmates behaviour. Followed by organisational factors, where project management style will encourage the safety efforts. From the procedural factors, it was also found that training was one of the significant factors to improve safety culture of IBS construction site. Another important finding that formed as a part of the environmental factor was storage of IBS components, in which proper planning of the layout would able to contribute to a safer site condition. To conclude, in order to improve safety of IBS construction site, a welltrained and skilled workers are required for IBS projects, thus proper training is permissible and should be emphasised.

Justification and Classification of Issues for the Selection and Implementation of Advanced Manufacturing Technologies

It has often been said that the strength of any country resides in the strength of its industrial sector, and Progress in industrial society has been accomplished by the creation of new technologies. Developments have been facilitated by the increasing availability of advanced manufacturing technology (AMT), in addition the implementation of advanced manufacturing technology (AMT) requires careful planning at all levels of the organization to ensure that the implementation will achieve the intended goals. Justification and implementation of advanced manufacturing technology (AMT) involves decisions that are crucial for the practitioners regarding the survival of business in the present days of uncertain manufacturing world. This paper assists the industrial managers to consider all the important criteria for success AMT implementation, when purchasing new technology. Concurrently, this paper classifies the tangible benefits of a technology that are evaluated by addressing both cost and time dimensions, and the intangible benefits are evaluated by addressing technological, strategic, social and human issues to identify and create awareness of the essential elements in the AMT implementation process and identify the necessary actions before implementing AMT.