Abstract: The search for factors that influence user behavior has remained an important theme for both the academic and practitioner Information Systems Communities. In this paper we examine relevant user behaviors in the phase after adoption and investigate two factors that are expected to influence such behaviors, namely User Involvement (UI) and Personal Innovativeness in IT (PIIT). We conduct a field study to examine how these factors influence postadoption behavior and how they are interrelated. Building on theoretical premises and prior empirical findings, we propose and test two alternative models of the relationship between these factors. Our results reveal that the best explanation of post-adoption behavior is provided by the model where UI and PIIT independently influence post-adoption behavior. Our findings have important implications for research and practice. To that end, we offer directions for future research.
Abstract: During last decades, developing multi-objective
evolutionary algorithms for optimization problems has found
considerable attention. Flexible job shop scheduling problem, as an
important scheduling optimization problem, has found this attention
too. However, most of the multi-objective algorithms that are
developed for this problem use nonprofessional approaches. In
another words, most of them combine their objectives and then solve
multi-objective problem through single objective approaches. Of
course, except some scarce researches that uses Pareto-based
algorithms. Therefore, in this paper, a new Pareto-based algorithm
called controlled elitism non-dominated sorting genetic algorithm
(CENSGA) is proposed for the multi-objective FJSP (MOFJSP). Our
considered objectives are makespan, critical machine work load, and
total work load of machines. The proposed algorithm is also
compared with one the best Pareto-based algorithms of the literature
on some multi-objective criteria, statistically.
Abstract: The seemingly ambiguous title of this paper – use of the terms maturity and innovation in concord – signifies the imperative of every organisation within the competitive domain. Where organisational maturity and innovativeness were traditionally considered antonymous, the assimilation of these two seemingly contradictory notions is fundamental to the assurance of long-term organisational prosperity. Organisations are required, now more than ever, to grow and mature their innovation capability – rending consistent innovative outputs. This paper describes research conducted to consolidate the principles of innovation and identify the fundamental components that constitute organisational innovation capability. The process of developing an Innovation Capability Maturity Model is presented. A brief description is provided of the basic components of the model, followed by a description of the case studies that were conducted to evaluate the model. The paper concludes with a summary of the findings and potential future research.
Abstract: The results from experimental research of deformation
by upsetting and die forging of lead specimens wit controlled impact
are presented. Laboratory setup for conducting the investigations,
which uses cold rocket engine operated with compressed air, is
described. The results show that when using controlled impact is
achieving greater plastic deformation and consumes less impact
energy than at ordinary impact deformation process.
Abstract: This paper generalizes Yeh Lam-s shock model for
renewal shock arrivals and random threshold. Several interesting
statistical measures are explicitly obtained. A few special cases and
an optimal replacement problem are also discussed.
Abstract: Producing companies aspire to high delivery
availability despite appearing disruptions. To ensure high delivery
availability safety stocksare required. Howeversafety stock leads to
additional capital commitment and compensates disruptions instead
of solving the reasons.The intention is to increase the stability in
production by configuring the production planning and control
systematically. Thus the safety stock can be reduced. The largest
proportion of inventory in producing companies is caused by batch
inventory, schedule deviations and variability of demand rates.These
reasons for high inventory levels can be reduced by configuring the
production planning and control specifically. Hence the inventory
level can be reduced. This is enabled by synchronizing the lot size
straightening the demand as well as optimizing the releasing order,
sequencing and capacity control.
Abstract: Effective employee selection is a critical component
of a successful organization. Many important criteria for personnel
selection such as decision-making ability, adaptability, ambition, and
self-organization are naturally vague and imprecise to evaluate. The
rough sets theory (RST) as a new mathematical approach to
vagueness and uncertainty is a very well suited tool to deal with
qualitative data and various decision problems. This paper provides
conceptual, descriptive, and simulation results, concentrating chiefly
on human resources and personnel selection factors. The current
research derives certain decision rules which are able to facilitate
personnel selection and identifies several significant features based
on an empirical study conducted in an IT company in Iran.
Abstract: To offer a large variety of products while maintaining
low costs, high speed, and high quality in a mass customization
product development environment, platform based product
development has much benefit and usefulness in many industry fields.
This paper proposes a product configuration strategy by similarity
measure, incorporating the knowledge engineering principles such as
product information model, ontology engineering, and formal concept
analysis.
Abstract: Lean manufacturing is a production philosophy made
popular by Toyota Motor Corporation (TMC). It is globally known as
the Toyota Production System (TPS) and has the ultimate aim of
reducing cost by thoroughly eliminating wastes or muda. TPS
embraces the Just-in-time (JIT) manufacturing; achieving cost
reduction through lead time reduction. JIT manufacturing can be
achieved by implementing Pull system in the production.
Furthermore, TPS aims to improve productivity and creating
continuous flow in the production by arranging the machines and
processes in cellular configurations. This is called as Cellular
Manufacturing Systems (CMS). This paper studies on integrating the
CMS with the Pull system to establish a Big Island-Pull system
production for High Mix Low Volume (HMLV) products in an
automotive component industry. The paper will use the build-in JIT
system steps adapted from TMC to create the Pull system production
and also create a shojinka line which, according to takt time, has the
flexibility to adapt to demand changes simply by adding and taking
out manpower. This will lead to optimization in production.
Abstract: This paper and its companion (Part 2) deal with
modeling and optimization of two NP-hard problems in production
planning of flexible manufacturing system (FMS), part type selection
problem and loading problem. The part type selection problem and
the loading problem are strongly related and heavily influence the
system-s efficiency and productivity. The complexity of the problems
is harder when flexibilities of operations such as the possibility of
operation processed on alternative machines with alternative tools are
considered. These problems have been modeled and solved
simultaneously by using real coded genetic algorithms (RCGA)
which uses an array of real numbers as chromosome representation.
These real numbers can be converted into part type sequence and
machines that are used to process the part types. This first part of the
papers focuses on the modeling of the problems and discussing how
the novel chromosome representation can be applied to solve the
problems. The second part will discuss the effectiveness of the
RCGA to solve various test bed problems.
Abstract: In this paper we address a multi-objective scheduling problem for unrelated parallel machines. In unrelated parallel systems, the processing cost/time of a given job on different machines may vary. The objective of scheduling is to simultaneously determine the job-machine assignment and job sequencing on each machine. In such a way the total cost of the schedule is minimized. The cost function consists of three components, namely; machining cost, earliness/tardiness penalties and makespan related cost. Such scheduling problem is combinatorial in nature. Therefore, a Simulated Annealing approach is employed to provide good solutions within reasonable computational times. Computational results show that the proposed approach can efficiently solve such complicated problems.
Abstract: Applying a rigorous process to optimize the elements
of a supply-chain network resulted in reduction of the waiting time
for a service provider and customer. Different sources of downtime
of hydraulic pressure controller/calibrator (HPC) were causing
interruptions in the operations. The process examined all the issues to
drive greater efficiencies. The issues included inherent design issues
with HPC pump, contamination of the HPC with impurities, and the
lead time required for annual calibration in the USA.
HPC is used for mandatory testing/verification of formation
tester/pressure measurement/logging-while drilling tools by oilfield
service providers, including Halliburton.
After market study andanalysis, it was concluded that the current
HPC model is best suited in the oilfield industry. To use theexisting
HPC model effectively, design andcontamination issues were
addressed through design and process improvements. An optimum
network is proposed after comparing different supply-chain models
for calibration lead-time reduction.
Abstract: A new technique of topological multi-scale analysis is
introduced. By performing a clustering recursively to build a
hierarchy, and analyzing the co-scale and intra-scale similarities, an
Iterated Function System can be extracted from any data set. The study
of fractals shows that this method is efficient to extract
self-similarities, and can find elegant solutions the inverse problem of
building fractals. The theoretical aspects and practical
implementations are discussed, together with examples of analyses of
simple fractals.
Abstract: Tubular process equipment is often damaged in
industrial processes. The damage occurs both on devices working at
high temperatures and also on less exposed devices. In case of sudden
damage of key equipment a shutdown of the whole production unit
and resulting significant economic losses are imminent. This paper
presents a solution of several types of tubular process equipment. The
causes of damage and suggestions of correction actions are discussed
in all cases. Very important part is the analysis of operational
conditions, determination of unfavourable working states decreasing
lifetime of devices and suggestions of correction actions. Lately very
popular numerical methods are used for analysis of the equipment.
Abstract: The decision to recruit manpower in an organization
requires clear identification of the criteria (attributes) that distinguish
successful from unsuccessful performance. The choice of appropriate
attributes or criteria in different levels of hierarchy in an organization
is a multi-criteria decision problem and therefore multi-criteria
decision making (MCDM) techniques can be used for prioritization
of such attributes. Analytic Hierarchy Process (AHP) is one such
technique that is widely used for deciding among the complex criteria
structure in different levels. In real applications, conventional AHP
still cannot reflect the human thinking style as precise data
concerning human attributes are quite hard to be extracted. Fuzzy
logic offers a systematic base in dealing with situations, which are
ambiguous or not well defined. This study aims at defining a
methodology to improve the quality of prioritization of an
employee-s performance measurement attributes under fuzziness. To
do so, a methodology based on the Extent Fuzzy Analytic Hierarchy
Process is proposed. Within the model, four main attributes such as
Subject knowledge and achievements, Research aptitude, Personal
qualities and strengths and Management skills with their subattributes
are defined. The two approaches conventional AHP
approach and the Extent Fuzzy Analytic Hierarchy Process approach
have been compared on the same hierarchy structure and criteria set.
Abstract: One of the most important problems in production planning of flexible manufacturing system (FMS) is machine tool selection and operation allocation problem that directly influences the production costs and times .In this paper minimizing machining cost, set-up cost and material handling cost as a multi-objective problem in flexible manufacturing systems environment are considered. We present a 0-1 integer linear programming model for the multiobjective machine tool selection and operation allocation problem and due to the large scale nature of the problem, solving the problem to obtain optimal solution in a reasonable time is infeasible, Paretoant colony optimization (P-ACO) approach for solving the multiobjective problem in reasonable time is developed. Experimental results indicate effectiveness of the proposed algorithm for solving the problem.
Abstract: In this research, Forming Limit Diagrams for supertension
sheet metals which are using in automobile industry have
been obtained. The exerted strains to sheet metals have been
measured with four different methods and the errors of each method
have also been represented. These methods have been compared with
together and the most efficient and economic way of extracting of the
exerted strains to sheet metals has been introduced. In this paper total
error and uncertainty of FLD extraction procedures have been
derived. Determination of the measurement uncertainty in extracting
of FLD has a great importance in design and analysis of the sheet
metal forming process.
Abstract: Although the STL (stereo lithography) file format is
widely used as a de facto industry standard in the rapid prototyping
industry due to its simplicity and ability to tessellation of almost all
surfaces, but there are always some defects and shortcoming in their
usage, which many of them are difficult to correct manually. In
processing the complex models, size of the file and its defects grow
extremely, therefore, correcting STL files become difficult. In this
paper through optimizing the exiting algorithms, size of the files and
memory usage of computers to process them will be reduced. In spite
of type and extent of the errors in STL files, the tail-to-head
searching method and analysis of the nearest distance between tails
and heads techniques were used. As a result STL models sliced
rapidly, and fully closed contours produced effectively and errorless.
Abstract: The problem of lot sizing, sequencing and scheduling
multiple products in flow line production systems has been studied
by several authors. Almost all of the researches in this area assumed
that setup times and costs are sequence –independent even though
sequence dependent setups are common in practice. In this paper we
present a new mixed integer non linear program (MINLP) and a
heuristic method to solve the problem in sequence dependent case.
Furthermore, a genetic algorithm has been developed which applies
this constructive heuristic to generate initial population. These two
proposed solution methods are compared on randomly generated
problems. Computational results show a clear superiority of our
proposed GA for majority of the test problems.
Abstract: This paper proposes a novel hybrid algorithm for feature selection based on a binary ant colony and SVM. The final subset selection is attained through the elimination of the features that produce noise or, are strictly correlated with other already selected features. Our algorithm can improve classification accuracy with a small and appropriate feature subset. Proposed algorithm is easily implemented and because of use of a simple filter in that, its computational complexity is very low. The performance of the proposed algorithm is evaluated through a real Rotary Cement kiln dataset. The results show that our algorithm outperforms existing algorithms.