Abstract: In economical evaluation literature, although the combination of some variables such as repair and maintenance costs and accumulated use hours has been widely considered in determining of optimum life for tractor, no investigation has indicated the influence of failure rate on repair and maintenance costs. In this study, the owners of three hundred tractors, which include Massey Ferguson, John Deere and Universal, were interviewed, from five regions of Khouzestan Province. A regression model was used to predict the tractors annual repair and maintenance costs based on failure rate. Results showed that the maximum percentage of annual repair and maintenance costs occurred in engine parts for MF285, JD3140 and U650 tractors while these costs for tire, ring, ball bearing and operator seat were higher compared to other MF399 tractor systems. According to the results of the regression, the failure rate increase would lead to annual repair and maintenance costs increase for all tractors. But, of all the tractors, repair and maintenance costs of JD3140 tractors extremely affected by the failure rate increase.
Abstract: Since fuel must be injected with appropriate pressure and time for accurate performance of diesel engines, then proper function of engine is influenced by accurate function of injector pump. At first total pump was designed by SolidWorks 2012 software. Then the total relationship of rotor, roller, internal cam ring, pole shoe and plunger in injector pump in MF285 tractor and their performance was shown. During suction state rollers connect with dents in internal cam ring and in pressure course pole shoes have drawer move in rotor and perform tappet action between rollers and plungers. The maximum stress was obtained by using analysis of finite element method. The maximum stress in contact surface of roller and internal cam ring and on roller surface. The maximum amount of this stress is 288.12 MPa. According to conducted analyses, the minimum value for safety factor is related to roller surface and it equals to 2.0477.
Abstract: Modern engineering assets are complex and very high in value. They are expected to function for years to come, with ability to handle the change in technology and ageing modification. The aging of an engineering asset and continues increase of vendors and contractors numbers forces the asset operation management (or Owner) to design an asset system which can capture these changes. Furthermore, an accurate performance measurement and risk evaluation processes are highly needed. Therefore, this paper explores the nature of the asset management system performance evaluation for an engineering asset based on the System Support Engineering (SSE) principles. The research work explores the asset support system from a range of perspectives, interviewing managers from across a refinery organization. The factors contributing to complexity of an asset management system are described in context which clusters them into several key areas. It is proposed that SSE framework may then be used as a tool for analysis and management of asset. The paper will conclude with discussion of potential application of the framework and opportunities for future research.
Abstract: The construction sector constitutes one of the most important sectors in the economy of any country. Contractor selection is a critical decision that is undertaken by client organizations and is central to the success of any construction project. Contractor selection (CS) is a process which involves investigating, screening and determining whether candidate contractors have the technical and financial capability to be accepted to formally tender for construction work. The process should be conducted prior to the award of contract, characterized by many factors such as: contactor’s skills, experience on similar projects, track- record in the industry, and financial stability. However, this paper evaluates the current state of knowledge in relation to contractor selection process and demonstrates the findings from the analysis of the data collected from the Delphi questionnaire survey. The survey was conducted with a group of 12 experts working in the Libyan construction industry (LCI). The paper starts by briefly explaining the general outline of the questionnaire including the survey participation rate, the different fields the experts came from, and the business titles of the participants. Then the paper describes the tests used to determine when the experts had reached consensus. The paper is based on research which aims to develop rank contractor selection criteria with specific application to make construction projects in the Libyan context. The findings of this study will be utilized to establish the scope of work that will be used as part of a PhD research.
Abstract: Construction project control attempts to obtain real-time as-built schedule information and to eliminate project delays by effectively enhancing dynamic schedule control and management. Suitable platforms for enhancing an as-built schedule visually during the construction phase are necessary and important for general contractors. As the application of building information modeling (BIM) becomes more common, schedule management integrated with the BIM approach becomes essential to enhance visual construction management implementation for the general contractor during the construction phase. To enhance visualization of the updated as-built schedule for the general contractor, this study presents a novel system called the Construction BIM-assisted Schedule Management (ConBIM-SM) system for general contractors in Taiwan. The primary purpose of this study is to develop a web ConBIM-SM system for the general contractor to enhance visual as-built schedule information sharing and efficiency in tracking construction as-built schedule. Finally, the ConBIM-SM system is applied to a case study of a commerce building project in Taiwan to verify its efficacy and demonstrate its effectiveness during the construction phase. The advantages of the ConBIM-SM system lie in improved project control and management efficiency for general contractors, and in providing BIM-assisted as-built schedule tracking and management, to access the most current as-built schedule information through a web browser. The case study results show that the ConBIM-SM system is an effective visual as-built schedule management platform integrated with the BIM approach for general contractors in a construction project.
Abstract: An Ivlev-type predator-prey system and stage-structured for predator concerning impulsive control strategy is considered. The conditions for the locally asymptotically stable prey-eradication periodic solution is obtained, by using Floquet theorem and small amplitude perturbation skills——when the impulsive period is less than the critical value. Otherwise, the system is permanence. Numerical examples show that the system considered has more complicated dynamics, including high-order quasi-periodic and periodic oscillating, period-doubling and period-halving bifurcation, chaos and attractor crisis, etc. Finally, the biological implications of the results and the impulsive control strategy are discussed.
Abstract: This document shows a software that shows different chaotic generator, as continuous as discrete time. The software gives the option for obtain the different signals, using different parameters and initial condition value. The program shows then critical parameter for each model. All theses models are capable of encrypter information, this software show it too.
Abstract: The picture of a perfect road construction site is the one that utilizes conventional vertical road signs and a flagman to optimize the traffic flow with minimum hazel to the public. Former research has been carried out by Department of Occupational Safety and Health (DOSH) and Ministry of Works to further enhance smoothness in traffic operations and particularly in safety issues within work zones. This paper highlights on hazardous zones in a certain road construction or road maintenance site. Most cases show that the flagman falls into high risk of fatal accidents within work zone. Various measures have been taken by both the authorities and contractors to overcome such miseries, yet it-s impossible to eliminate the usage of a flagman since it is considered the best practice. With the implementation of new technologies in automating the traffic flow in road construction site, it is possible to eliminate the usage of a flagman. The intelligent traffic light system is designed to solve problems which contribute hazardous at road construction site and to be inline with the road safety regulation which is taken into granted.
Abstract: This paper analysis performance of disbursement
procedure of public works project in Thailand. The results of
research were summarised based on contracts, submitted invoice,
inspection dated, copies of disbursement dated between client and
their main contractor and interviewed with persons involved in
central and local government projects during 1994-2008 in Thailand.
The data collection was to investigate the disbursement procedure
related to performance in disbursement during construction period
(Planned duration of contract against Actual execution date in each
month). A graphical presentation of a duration analysis of the
projects illustrated significant disbursement formation in each
project. It was established that the shortage of staff, the financial
stability of clients, bureaucratic, method of disbursement and
economics situation has play major role on performance of
disbursement to their main contractors.
Abstract: Over the years, there is a growing trend towards
quality-based specifications in highway construction. In many
Quality Control/Quality Assurance (QC/QA) specifications, the
contractor is primarily responsible for quality control of the process,
whereas the highway agency is responsible for testing the acceptance
of the product. A cooperative investigation was conducted in Illinois
over several years to develop a prototype End-Result Specification
(ERS) for asphalt pavement construction. The final characteristics of
the product are stipulated in the ERS and the contractor is given
considerable freedom in achieving those characteristics. The risk for
the contractor or agency depends on how the acceptance limits and
processes are specified. Stochastic simulation models are very useful
in estimating and analyzing payment risk in ERS systems and these
form an integral part of the Illinois-s prototype ERS system. This
paper describes the development of an innovative methodology to
estimate the variability components in in-situ density, air voids and
asphalt content data from ERS projects. The information gained from
this would be crucial in simulating these ERS projects for estimation
and analysis of payment risks associated with asphalt pavement
construction. However, these methods require at least two parties to
conduct tests on all the split samples obtained according to the
sampling scheme prescribed in present ERS implemented in Illinois.
Abstract: Deep Brain Stimulation or DBS is a surgical treatment for Parkinson-s Disease with three stimulation parameters: frequency, pulse width, and voltage. The parameters should be selected appropriately to achieve effective treatment. This selection now, performs clinically. The aim of this research is to study chaotic behavior of recorded tremor of patients under DBS in order to present a computational method to recognize stimulation optimum voltage. We obtained some chaotic features of tremor signal, and discovered embedding space of it has an attractor, and its largest Lyapunov exponent is positive, which show tremor signal has chaotic behavior, also we found out, in optimal voltage, entropy and embedding space variance of tremor signal have minimum values in comparison with other voltages. These differences can help neurologists recognize optimal voltage numerically, which leads to reduce patients' role and discomfort in optimizing stimulation parameters and to do treatment with high accuracy.
Abstract: This paper presents the development of a wavelet
based algorithm, for distinguishing between magnetizing inrush
currents and power system fault currents, which is quite adequate,
reliable, fast and computationally efficient tool. The proposed
technique consists of a preprocessing unit based on discrete wavelet
transform (DWT) in combination with an artificial neural network
(ANN) for detecting and classifying fault currents. The DWT acts as
an extractor of distinctive features in the input signals at the relay
location. This information is then fed into an ANN for classifying
fault and magnetizing inrush conditions. A 220/55/55 V, 50Hz
laboratory transformer connected to a 380 V power system were
simulated using ATP-EMTP. The DWT was implemented by using
Matlab and Coiflet mother wavelet was used to analyze primary
currents and generate training data. The simulated results presented
clearly show that the proposed technique can accurately discriminate
between magnetizing inrush and fault currents in transformer
protection.
Abstract: The model of neural networks on the small-world
topology, with metric (local and random connectivity) is investigated.
The synaptic weights are random, driving the network towards a
chaotic state for the neural activity. An ordered macroscopic neuron
state is induced by a bias in the network connections. When the
connections are mainly local, the network emulates a block-like
structure. It is found that the topology and the bias compete to
influence the network to evolve into a global or a block activity
ordering, according to the initial conditions.
Abstract: DC-DC converters are widely used in regulated switched mode power supplies and in DC motor drive applications. There are several sources of unwanted nonlinearity in practical power converters. In addition, their operation is characterized by switching that gives birth to a variety of nonlinear dynamics. DC-DC buck and boost converters controlled by pulse-width modulation (PWM) have been simulated. The voltage waveforms and attractors obtained from the circuit simulation have been studied. With the onset of instability, the phenomenon of subharmonic oscillations, quasi-periodicity, bifurcations, and chaos have been observed. This paper is mainly motivated by potential contributions of chaos theory in the design, analysis and control of power converters, in particular and power electronics circuits, in general.
Abstract: Most fingerprint recognition techniques are based on minutiae matching and have been well studied. However, this technology still suffers from problems associated with the handling of poor quality impressions. One problem besetting fingerprint matching is distortion. Distortion changes both geometric position and orientation, and leads to difficulties in establishing a match among multiple impressions acquired from the same finger tip. Marking all the minutiae accurately as well as rejecting false minutiae is another issue still under research. Our work has combined many methods to build a minutia extractor and a minutia matcher. The combination of multiple methods comes from a wide investigation into research papers. Also some novel changes like segmentation using Morphological operations, improved thinning, false minutiae removal methods, minutia marking with special considering the triple branch counting, minutia unification by decomposing a branch into three terminations, and matching in the unified x-y coordinate system after a two-step transformation are used in the work.
Abstract: An automated wood recognition system is designed to
classify tropical wood species.The wood features are extracted based
on two feature extractors: Basic Grey Level Aura Matrix (BGLAM)
technique and statistical properties of pores distribution (SPPD)
technique. Due to the nonlinearity of the tropical wood species
separation boundaries, a pre classification stage is proposed which
consists ofKmeans clusteringand kernel discriminant analysis (KDA).
Finally, Linear Discriminant Analysis (LDA) classifier and KNearest
Neighbour (KNN) are implemented for comparison purposes.
The study involves comparison of the system with and without pre
classification using KNN classifier and LDA classifier.The results
show that the inclusion of the pre classification stage has improved
the accuracy of both the LDA and KNN classifiers by more than
12%.
Abstract: Contractor selection in Saudi Arabia is very important due to the large construction boom and the contractor role to get over construction risks. The need for investigating contractor selection is due to the following reasons; large number of defaulted or failed projects (18%), large number of disputes attributed to contractor during the project execution stage (almost twofold), the extension of the General Agreement on Tariffs and Trade (GATT) into construction industry, and finally the few number of researches. The selection strategy is not perfect and considered as the reason behind irresponsible contractors. As a response, this research was conducted to review the contractor selection strategies as an integral part of a long advanced research to develop a good selection model. Many techniques can be used to form a selection strategy; multi criteria for optimizing decision, prequalification to discover contractor-s responsibility, bidding process for competition, third party guarantee to enhance the selection, and fuzzy techniques for ambiguities and incomplete information.
Abstract: In Lebanon, public construction projects are awarded
to the contractor submitting the lowest bid price based on a
competitive bidding process. The contractor has to make a strategic
decision in choosing the appropriate bid price that will offer a
satisfactory profit with a greater probability to win. A simulation
model for bid price decision making based on the lowest bid price
evaluation is developed. The model, built using Crystal Ball decisionengineering
software, considers two main factors affecting the
bidding process: the number of qualified bidders and the size of the
project. The validity of the model is tested on twelve separate
projects. The study also shows how to use the model to conduct risk
analysis and help any specific contractor to decide on his bid price
with associated certainty level in a scientific method.
Abstract: The utilisation of Industrial Building System (IBS) in construction industry will lead to a safe site condition since minimum numbers of workers are required to be on-site, timely material delivery, systematic component storage, reduction of construction material and waste. These matters are being promoted in the Construction Industry Master Plan (CIMP 2006-2015). However, the enabling factors of IBS that will foster a safer working environment are indefinite; on that basis a research has been conducted. The purpose of this paper is to discuss and identify the relevant factors towards safety improvement for IBS. A quantitative research by way of questionnaire surveys have been conducted to 314 construction companies. The target group was Grade 5 to Grade 7 contractors registered with Construction Industry Development Board (CIDB) which specialise in IBS. The findings disclosed seven factors linked to the safety improvement of IBS construction site in Malaysia. The factors were historical, economic, psychological, technical, procedural, organisational and the environmental factors. From the findings, a psychological factor ranked as the highest and most crucial factor contributing to safer IBS construction site. The psychological factor included the self-awareness and influences from workmates behaviour. Followed by organisational factors, where project management style will encourage the safety efforts. From the procedural factors, it was also found that training was one of the significant factors to improve safety culture of IBS construction site. Another important finding that formed as a part of the environmental factor was storage of IBS components, in which proper planning of the layout would able to contribute to a safer site condition. To conclude, in order to improve safety of IBS construction site, a welltrained and skilled workers are required for IBS projects, thus proper training is permissible and should be emphasised.
Abstract: Determining reasonable fees is the main objective of designing the cost estimation and payment systems for consultant contracts. However, project clients utilize different cost estimation and payment systems because of their varying views on the reasonableness of consultant fees. This study reviews the cost estimation and payment systems of consultant contracts for five countries, including the US (Washington State Department of Transportation), Japan (Ministry of Land, Infrastructure, Transport and Tourism), China (Engineering Design Charging Standard) and UK (Her Majesty's Treasure). Specifically, this work investigates the budgeting process, contractor selection method, contractual price negotiation process, cost review, and cost-control concept of the systems used in these countries. The main finding indicates that that project client-s view on whether the fee is high will affect the way he controls it. In the US, the fee is commonly considered to be high. As a result, stringent auditing system (low flexibility given to the consultant) is then applied. In the UK, the fee is viewed to be low by comparing it to the total life-cycle project cost. Thus, a system that has high flexibility in budgeting and cost reviewing is given to the consultant. In terms of the flexibility allowed for the consultant, the systems applied in Japan and China fall between those of the US and UK. Both the US and UK systems are helpful in determining a reasonable fee. However, in the US system, rigid auditing standards must be established and additional cost-audit manpower is required. In the UK system, sufficient historical cost data should be needed to evaluate the reasonableness of the consultant-s proposed fee