Abstract: Optimization of timetable is the need of the day for the rescheduling and routing of trains in real time. Trains are scheduled in parallel with the road transport vehicles to the same destination. As the number of trains is restricted due to single track, customers usually opt for road transport to use frequently. The air pollution increases as the density of vehicles on road transport is increased. Use of an alternate mode of transport like train helps in reducing air-pollution. This paper mainly aims at attracting the passengers to Train transport by proper rescheduling of trains using hybrid of stop-skip algorithm and iterative convex programming algorithm. Rescheduling of train bi-directionally is achieved on a single track with dynamic dual time and varying stops. Introduction of more trains attract customers to use rail transport frequently, thereby decreasing the pollution. The results are simulated using Network Simulator (NS-2).
Abstract: This paper presents hierarchical operation strategies which are minimizing operation error between day ahead operation plan and real time operation. Operating power systems between centralized and decentralized approaches can be represented as hierarchical control scheme, featured as primary control, secondary control and tertiary control. Primary control is known as local control, featuring fast response. Secondary control is referred to as microgrid Energy Management System (EMS). Tertiary control is responsible of coordinating the operations of multi-microgrids. In this paper, we formulated 3 stage microgrid operation strategies which are similar to hierarchical control scheme. First stage is to set a day ahead scheduled output power of Battery Energy Storage System (BESS) which is only controllable source in microgrid and it is optimized to minimize cost of exchanged power with main grid using Particle Swarm Optimization (PSO) method. Second stage is to control the active and reactive power of BESS to be operated in day ahead scheduled plan in case that State of Charge (SOC) error occurs between real time and scheduled plan. The third is rescheduling the system when the predicted error is over the limited value. The first stage can be compared with the secondary control in that it adjusts the active power. The second stage is comparable to the primary control in that it controls the error in local manner. The third stage is compared with the secondary control in that it manages power balancing. The proposed strategies will be applied to one of the buildings in Electronics and Telecommunication Research Institute (ETRI). The building microgrid is composed of Photovoltaic (PV) generation, BESS and load and it will be interconnected with the main grid. Main purpose of that is minimizing operation cost and to be operated in scheduled plan. Simulation results support validation of proposed strategies.
Abstract: Assembling large-scale products, such as airplanes, locomotives, or wind turbines, involves frequent process interruptions induced by e.g. delayed material deliveries or missing availability of resources. This leads to a negative impact on the logistical performance of a producer of xxl-products. In industrial practice, in case of interruptions, the identification, evaluation and eventually the selection of an alternative order of assembly activities (‘assembly alternative’) leads to an enormous challenge, especially if an optimized logistical decision should be reached. Therefore, in this paper, an innovative, optimization model for the identification of assembly alternatives that addresses the given problem is presented. It describes make-to-order, large-scale product assembly processes as a resource constrained project scheduling (RCPS) problem which follows given restrictions in practice. For the evaluation of the assembly alternative, a cost-based definition of the logistical objectives (delivery reliability, inventory, make-span and workload) is presented.
Abstract: As the air traffic increases at a hub airport, some
flights cannot land or depart at their preferred target time. This event
happens because the airport runways become occupied to near their
capacity. It results in extra costs for both passengers and airlines
because of the loss of connecting flights or more waiting, more fuel
consumption, rescheduling crew members, etc. Hence, devising an
appropriate scheduling method that determines a suitable runway and
time for each flight in order to efficiently use the hub capacity and
minimize the related costs is of great importance. In this paper, we
present a mixed-integer zero-one model for scheduling a set of mixed
landing and departing flights (despite of most previous studies
considered only landings). According to the fact that the flight cost is
strongly affected by the level of airline, we consider different airline
categories in our model. This model presents a single objective
minimizing the total sum of three terms, namely 1) the weighted
deviation from targets, 2) the scheduled time of the last flight (i.e.,
makespan), and 3) the unbalancing the workload on runways. We
solve 10 simulated instances of different sizes up to 30 flights and 4
runways. Optimal solutions are obtained in a reasonable time, which
are satisfactory in comparison with the traditional rule, namely First-
Come-First-Serve (FCFS) that is far apart from optimality in most
cases.
Abstract: This paper presents the review of past studies
concerning mathematical models for rescheduling passenger railway
services, as part of delay management in the occurrence of railway
disruption. Many past mathematical models highlighted were aimed
at minimizing the service delays experienced by passengers during
service disruptions. Integer programming (IP) and mixed-integer
programming (MIP) models are critically discussed, focusing on the
model approach, decision variables, sets and parameters. Some of
them have been tested on real-life data of railway companies
worldwide, while a few have been validated on fictive data. Based
on selected literatures on train rescheduling, this paper is able to
assist researchers in the model formulation by providing
comprehensive analyses towards the model building. These analyses
would be able to help in the development of new approaches in
rescheduling strategies or perhaps to enhance the existing
rescheduling models and make them more powerful or more
applicable with shorter computing time.
Abstract: Transient Stability is an important issue in power systems planning, operation and extension. The objective of transient stability analysis problem is not satisfied with mere transient instability detection or evaluation and it is most important to complement it by defining fast and efficient control measures in order to ensure system security. This paper presents a new Fuzzy Support Vector Machines (FSVM) to investigate the stability status of power systems and a modified generation rescheduling scheme to bring back the identified unstable cases to a more economical and stable operating point. FSVM improves the traditional SVM (Support Vector Machines) by adding fuzzy membership to each training sample to indicate the degree of membership of this sample to different classes. The preventive control based on economic generator rescheduling avoids the instability of the power systems with minimum change in operating cost under disturbed conditions. Numerical results on the New England 39 bus test system show the effectiveness of the proposed method.