Geophysical Investigation for Pre-Engineering Construction Works in Part of Ilorin, Northcentral Nigeria

A geophysical investigation involving geoelectric depths sounding has been conducted as pre-foundation study in part of Ilorin, Nigeria. The area is underlain by the Precambrian basement complex rocks. 15 sounding stations were established along five traverses. The Vertical Electrical Sounding (VES) (three-five) conducted along each of the traverses was subjected to computer iteration using IP2Win software. Three -five subsurface geologic layers were delineated in the study area. These include the topsoil with resistivity and thickness values ranging from 103 Ωm-210 Ωm and 0 m-1 m; lateritic (117 Ωm-590 Ωm and 1 m-4.7 m); sandy clay (137 – 859 Ωm and 2.9 m – 4.3 m); weathered (60.5 Ωm to 2539 Ωm and 3,2 m-10 m) and fresh basement (2253-∞ and 7.1 m-∞) respectively. The resistivity pseudosection shows continuous high resistivity zone on the surface. Resistivity of this layer from depth 0-5 m varies from 300-800 Ωm along traverse 1 and 2. Hence, this layer is rated competent as it has the ability to support engineering structure. However, along traverse 1, very low resistive layer occurs between VES 5 and 15 with resistivity values ranging from 30 Ωm-70 Ωm. This layer was rated incompetent based on the competence rating. This study revealed the importance of geophysical survey as a pre-construction engineering survey at any civil engineering site since it can reliably evaluate the competence of the subsurface geomaterials.

Time Overrun in Pre-Construction Planning Phase of Construction Projects

Construction industry plays a significant role in fulfilling the major requirements of the human being. It is one of the major constituents of every developed country. Although the construction industry of both the developing and developed countries encompasses a major part of the economy, and millions of rupees are utilized every year on various kinds of construction projects. But, this industry is facing numerous hurdles in terms of its budget and timely completion. Construction projects generally consist of several phases like planning, designing, execution, and finishing. This research study aims to determine the significant factors of time overrun in pre-construction planning (PCP) phase of construction projects in Pakistan. Questionnaires were distributed by various means and responses of respondents were compiled and collected data were then analyzed through a statistical technique using SPSS version 24. Major causes of time overrun in pre-construction planning phase; which is an extremely important phase of construction projects, were revealed. The research conclusion will provide a pathway for stakeholders to pay attention to the mentioned causes to overcome the major issue of time overrun.

Effect of Pre-Construction on Construction Schedule and Client Loyalty

Pre-construction is essential in achieving the success of a construction project. Due to the early involvement of project participants in the construction phase, project managers are able to plan ahead and solve issues well in advance leading to the success of the project and the satisfaction of the client. This research utilizes quantitative data derived from construction management projects in order to identify the relationship between pre-construction, construction schedule, and client satisfaction. A total of 65 construction projects and 93 clients were investigated for this research in an attempt to identify (a) the relationship between pre-construction and schedule reduction, and (b) pre-construction and client loyalty. Based on the quantitative analysis, this research was able to establish a negative correlation based on 65 construction projects between pre-construction and project schedule existed. This finding represents that the more pre-construction is performed for a certain project, the overall construction schedule decreased. Then, to determine the relationship between pre-construction and client satisfaction, Net Promoter Score (NPS) of 93 clients from the 65 projects was utilized. Pre-construction and NPS was further analyzed and a positive correlation was found between the two. This infers that clients tend to be more satisfied with projects with higher ratio of pre-construction than those projects with less pre-construction.

Sustainable Development in Construction

Semnan is a city in semnan province, northern Iran with a population estimated at 119,778 inhabitants. It is the provincial capital of semnan province. Iran is a developing country and construction is a basic factor of developing too. Hence, Semnan city needs to a special programming for construction of buildings, structures and infrastructures. Semnan municipality tries to begin this program. In addition to, city has some historical monuments which can be interesting for tourists. Hence, Semnan inhabitants can benefit from tourist industry. Optimization of Energy in construction industry is another activity of this municipality and the inhabitants who execute these regulations receive some discounts. Many parts of Iran such as semnan are located in highly seismic zones and structures must be constructed safe e.g., according to recent seismic codes. In this paper opportunities of IT in construction industry of Iran are investigated in three categories. Pre-construction phase, construction phase and earthquake disaster mitigation are studied. Studies show that information technology can be used in these items for reducing the losses and increasing the benefits. Both government and private sectors must contribute to this strategic project for obtaining the best result.