Abstract: Future flood can be predicted using the probable
maximum flood (PMF). PMF is calculated using the historical
discharge or rainfall data considering the other climatic parameters
remaining stationary. However climate is changing globally and the
key climatic variables are temperature, evaporation, rainfall and sea
level rise are likely to change. To develop scenarios to a basin or
catchment scale these important climatic variables should be
considered. Nowadays scenario based on climatic variables is more
suitable than PMF. Six scenarios were developed for a large Fitzroy
basin and presented in this paper.