Abstract: Primary containment structure is one of the five safety layers of a nuclear facility which is needed to be designed in such a manner that it can withstand the pressure and excessive radioactivity during accidental situations. It is also necessary to ensure minimization of cost with maximum possible safety in order to make the design economically feasible and attractive. This paper attempts to identify the optimum design conditions for primary containment structure considering both mechanical and radiation safety keeping the economic aspects in mind. This work takes advantage of commercial simulation software to identify the suitable conditions without the requirement of costly experiments. Generated data may be helpful for further studies.
Abstract: Fukushima disaster is one of the most publicly exposed accidents in a nuclear facility which has changed the outlook of people towards nuclear power. Some have used it as an example to establish nuclear energy as an unsafe source, while others have tried to find the real reasons behind this accident. Many papers have tried to shed light on the possible causes, some of which are purely based on assumptions while others rely on rigorous data analysis. To our best knowledge, none of the works can say with absolute certainty that there is a single prominent reason that has paved the way to this unexpected incident. This paper attempts to compile all the apparent reasons behind Fukushima disaster and tries to analyze and identify the most likely one.
Abstract: An important number of technological equipment and high-skilled workers over long periods of time have to be mobilized during nuclear decommissioning processes. The related operations generate complex flows of waste and high inventory levels, associated to information flows of heterogeneous types. Taking into account that more than 10 decommissioning operations are on-going in France and about 50 are expected toward 2025: A big challenge is addressed today. The management of decommissioning and dismantling of nuclear installations represents an important part of the nuclear-based energy lifecycle, since it has an environmental impact as well as an important influence on the electricity cost and therefore the price for end-users. Bringing new technologies and new solutions into decommissioning methodologies is thus mandatory to improve the quality, cost and delay efficiency of these operations. The purpose of our project is to improve decommissioning management efficiency by developing a decision-support framework dedicated to plan nuclear facility decommissioning operations and to optimize waste evacuation by means of a logistic approach. The target is to create an easy-to-handle tool capable of i) predicting waste flows and proposing the best decommissioning logistics scenario and ii) managing information during all the steps of the process and following the progress: planning, resources, delays, authorizations, saturation zones, waste volume, etc. In this article we present our results from waste nuclear flows simulation during decommissioning process, including discrete-event simulation supported by FLEXSIM 3-D software. This approach was successfully tested and our works confirms its ability to improve this type of industrial process by identifying the critical points of the chain and optimizing it by identifying improvement actions. This type of simulation, executed before the start of the process operations on the basis of a first conception, allow ‘what-if’ process evaluation and help to ensure quality of the process in an uncertain context. The simulation of nuclear waste flows before evacuation from the site will help reducing the cost and duration of the decommissioning process by optimizing the planning and the use of resources, transitional storage and expensive radioactive waste containers. Additional benefits are expected for the governance system of the waste evacuation since it will enable a shared responsibility of the waste flows.
Abstract: Growing human population has placed increased
demands on water supplies and spurred a heightened interest in
desalination infrastructure. Key elements of the economics of
desalination projects are thermal and electrical inputs. With growing
concerns over use of fossil fuels to (indirectly) supply these inputs,
coupling of desalination with nuclear power production represents a
significant opportunity. Individually, nuclear and desalination
technologies have a long history and are relatively mature. For
desalination, Reverse Osmosis (RO) has the lowest energy inputs.
However, the economically driven output quality of the water
produced using RO, which uses only electrical inputs, is lower than the
output water quality from thermal desalination plants. Therefore,
modern desalination projects consider that RO should be coupled with
thermal desalination technologies (MSF, MED, or MED-TVC) with
attendant steam inputs to permit blending to produce various qualities
of water. A large nuclear facility is well positioned to dispatch large
quantities of both electrical and thermal power. This paper considers
the supply of thermal energy to a large desalination facility to examine
heat balance impact on the nuclear steam cycle. The APR1400 nuclear
plant is selected as prototypical from both a capacity and turbine cycle
heat balance perspective to examine steam supply and the impact on
electrical output. Extraction points and quantities of steam are
considered parametrically along with various types of thermal
desalination technologies to form the basis for further evaluations of
economically optimal approaches to the interface of nuclear power
production with desalination projects. In our study, the
thermodynamic evaluation will be executed by DE-TOP, an IAEA
sponsored program. DE-TOP has capabilities to analyze power
generation systems coupled to desalination plants through various
steam extraction positions, taking into consideration the isolation loop
between the nuclear and the thermal desalination facilities (i.e., for
radiological isolation).