Abstract: This research aims to analyze the regenerative burner and the recuperative burner for the different reheating furnaces in the steel industry. The warm air temperatures of the burners are determined to suit with the sizes of the reheating furnaces by considering the air temperature, the fuel cost and the investment cost. The calculations of the payback period and the net present value are studied to compare the burners for the different reheating furnaces. The energy balance is utilized to calculate and compare the energy used in the different sizes of reheating furnaces for each burner. It is found that the warm air temperature is different if the sizes of reheating furnaces are varied. Based on the considerations of the net present value and the payback period, the regenerative burner is suitable for all plants at the same life of the burner. Finally, the sensitivity analysis of all factors has been discussed in this research.
Abstract: In this article, by using fuzzy AHP and TOPSIS
technique we propose a new method for project selection problem.
After reviewing four common methods of comparing alternatives
investment (net present value, rate of return, benefit cost analysis
and payback period) we use them as criteria in AHP tree. In this
methodology by utilizing improved Analytical Hierarchy Process
by Fuzzy set theory, first we try to calculate weight of each
criterion. Then by implementing TOPSIS algorithm, assessment of
projects has been done. Obtained results have been tested in a
numerical example.