Project Selection by Using Fuzzy AHP and TOPSIS Technique

In this article, by using fuzzy AHP and TOPSIS technique we propose a new method for project selection problem. After reviewing four common methods of comparing alternatives investment (net present value, rate of return, benefit cost analysis and payback period) we use them as criteria in AHP tree. In this methodology by utilizing improved Analytical Hierarchy Process by Fuzzy set theory, first we try to calculate weight of each criterion. Then by implementing TOPSIS algorithm, assessment of projects has been done. Obtained results have been tested in a numerical example.




References:
[1] J. Meredith, S. Mantle, " Project Management: A Managerial
Approach", fourth ed. Wiley, New York, 2000.
[2] N. Danila, "Strategic evaluation and solution of R&D projects", R&D
Management 19, 47-62, 1999.
[3] A. Shpak, D. Zaporojan, "Working out R&D program via
multicriteria analysis", Computer Science of Moldova 4 (2 (11)),
239-259, 1996.
[4] A. Mehrez, Z. Sinuany-Stern, "An interactive approach to project
selection", Journal of Operational Research Society 34, 621-626,
1983.
[5] R. Khorramshahgole, H. M. Steiner, "Resource analysis in project
evaluation", A multicriteria approach. Journal of Operational
Research Society 95 (2), 795-803, 1998.
[6] P. K. Dey, M. T. Tabucanon, S. O. Ogunlana, "Hierarchical approach
to project planning", Applied Mathematical Modelling 20, 683-698,
1996.
[7] P. Chu, Y. Hsu, M. Fehling, "A decision support system for project
portfolio selection", Computer in Industry 32 (2), 141-149, 1996.
[8] G. Lockett, M. Stratford, "Ranking of research projects, experiments
with two methods", Omega 15, 395-400, 1987.
[9] P. Regan, S. Holtzman, "R&D decision advisor: An interactive
approach to normative decision system model construction",
European Journal of Operational Research 84 (1), 1995.
[10] F. Ghasemzadeh, N. P. Archer, P. Iyogun, "A zero-one model for
project portfolio selection and scheduling", Journal of Operational
Research Society 50 (7), 745-755, 1999.
[11] F. Ghasemzadeh, N. P. Archer, "Project portfolio selection through
decision support", Decision Support Systems 29, 73-88, 2000.
[12] P. K. Dey, S. S. Gupta, "Feasibility analysis of crosscountry pipeline
projects: A quantitative approach", Project Management Journal 32
(4), 50-58, 2001.
[13] Mian, S. A., Christine, N.D., 1999. Decision-making over the project
life cycle: An analytical hierarchy approach. Project Management
Journal 30 (1), 40-52.
[14] C. H. Loch, S. Kavadias, "Dynamic portfolio selection of NPD
programs using marginal returns", Management Science 48 (10),
1227-1241, 2002.
[15] R. Eugene, P. K. Dey, "The role of environmental factors in industrial
site selection activities: A case of limestone quarry expansion in
Barbados", Impact Assessment and Project Appraisal 23 (2), 2005.
[16] S. Hariharan, P. K. Dey, A. Y. Kumar, H. Moseley, " A new tool for
measurement of process-based performance of multispecialty tertiary
care hospital", International Journal of Health Care Quality
Assurance 17 (6), 302-312. 116-133, 2004.
[17] T. L. Saaty, "The analytic hierarchy process", New York: McGraw-
Hill; 1980.
[18] L. Zadeh, "Fuzzy sets", information control, vol 8, pp.338-53, 1965.
[19] C. Kahraman, U. Cebeci, Z. Ulukan "Multi-criteria supplier selection
using fuzzy AHP", Logistic information Management. Volume 16.
Number 6. pp. 382-394, 2003.
[20] D. Y. Chang,d, "Extent analysis and synthetic decision",
Optimization Techniques and Application, vol (1) . p. 352, 1992.
[21] D. L. Olson, "Comparison of weights in TOPSIS models",
Mathematical and Computer Modeling, 40, (7) 21-727, 2004.