Abstract: Truck platooning refers to a convoy of digitally connected automated trucks traveling safely with a small inter-vehicle gap. It has been identified as one of the most promising and applicable technologies towards automated and sustainable freight transportation. Although truck platooning delivers significant energy-saving benefits, it cannot be realized without good coordination of drivers’ shifts to lead the platoons subject to their mandatory breaks. Therefore, this study aims to route a fleet of trucks to their destinations using the least amount of fuel by maximizing platoon opportunities under the regulations of drivers’ mandatory breaks. We formulate this platoon coordination problem as a mixed-integer linear programming problem and solve it by CPLEX. Numerical experiments are conducted to demonstrate the effectiveness and efficiency of our proposed model. In addition, we also explore the impacts of drivers’ compulsory breaks on the fuel-savings performance. The results show a slight increase in the total fuel costs in the presence of drivers’ compulsory breaks, thanks to driving-while-resting benefit provided for the trailing trucks. This study may serve as a guide for the operators of automated freight transportation.
Abstract: This paper studies a train routing and scheduling
problem for busy railway stations. Our objective is to allow trains
to be routed in dense areas that are reaching saturation. Unlike
traditional methods that allocate all resources to setup a route for
a train and until the route is freed, our work focuses on the use
of resources as trains progress through the railway node. This
technique allows a larger number of trains to be routed simultaneously
in a railway node and thus reduces their current saturation. To
deal with this problem, this study proposes an abstract model and
a mixed-integer linear programming formulation to solve it. The
applicability of our method is illustrated on a didactic example.
Abstract: In this paper, a mixed integer linear programming (MILP) model is presented to solve the flexible job shop scheduling problem (FJSP). This problem is one of the hardest combinatorial problems. The objective considered is the minimization of the makespan. The computational results of the proposed MILP model were compared with those of the best known mathematical model in the literature in terms of the computational time. The results show that our model has better performance with respect to all the considered performance measures including relative percentage deviation (RPD) value, number of constraints, and total number of variables. By this improved mathematical model, larger FJS problems can be optimally solved in reasonable time, and therefore, the model would be a better tool for the performance evaluation of the approximation algorithms developed for the problem.
Abstract: This paper presents a Generalized Binary Integer Linear Programming (GBILP) method for optimal allocation of Phasor Measurement Units (PMUs) and to generate Dynamic State Estimation (DSE) solution with complete observability. The GBILP method is formulated with Zero Injection Bus (ZIB) constraints to reduce the number of locations for placement of PMUs in the case of normal and single line contingency. The integration of PMU and conventional measurements is modeled in DSE process to estimate accurate states of the system. To estimate the dynamic behavior of the power system with proposed method, load change up to 40% considered at a bus in the power system network. The proposed DSE method is compared with traditional Weighted Least Squares (WLS) state estimation method in presence of load changes to show the impact of PMU measurements. MATLAB simulations are carried out on IEEE 14, 30, 57, and 118 bus systems to prove the validity of the proposed approach.
Abstract: This paper explains the educational timetabling problem, a type of scheduling problem that is considered as one of the most challenging problem in optimization and operational research. The university examination timetabling problem (UETP), which involves assigning a set number of exams into a set number of timeslots whilst fulfilling all required conditions, has been widely investigated. The limitation of available timeslots and resources with the increasing number of examinations are the main reasons in the difficulty of solving this problem. Dynamical change in the examination scheduling system adds up the complication particularly in coping up with the demand and new requirements by the communities. Our objective is to investigate these demands and requirements with subjects taken from Universiti Malaysia Terengganu (UMT), through questionnaires. Integer linear programming model which reflects the preferences obtained to produce an effective examination timetabling was formed.
Abstract: The agenda of showing the scheduled time for
performing certain tasks is known as timetabling. It is widely used in
many departments such as transportation, education, and production.
Some difficulties arise to ensure all tasks happen in the time and
place allocated. Therefore, many researchers invented various
programming models to solve the scheduling problems from several
fields. However, the studies in developing the general integer
programming model for many timetabling problems are still
questionable. Meanwhile, this thesis describes about creating a
general model which solves different types of timetabling problems
by considering the basic constraints. Initially, the common basic
constraints from five different fields are selected and analyzed. A
general basic integer programming model was created and then
verified by using the medium set of data obtained randomly which is
much similar to realistic data. The mathematical software, AIMMS
with CPLEX as a solver has been used to solve the model. The model
obtained is significant in solving many timetabling problems easily
since it is modifiable to all types of scheduling problems which have
same basic constraints.
Abstract: Perfectly suited for natural or man-made emergency and disaster management situations such as flood, earthquakes, tornadoes, or tsunami, multi-target search path planning for a team of rescue agents is known to be computationally hard, and most techniques developed so far come short to successfully estimate optimality gap. A novel mixed-integer linear programming (MIP) formulation is proposed to optimally solve the multi-target multi-agent discrete search and rescue (SAR) path planning problem. Aimed at maximizing cumulative probability of successful target detection, it captures anticipated feedback information associated with possible observation outcomes resulting from projected path execution, while modeling agent discrete actions over all possible moving directions. Problem modeling further takes advantage of network representation to encompass decision variables, expedite compact constraint specification, and lead to substantial problem-solving speed-up. The proposed MIP approach uses CPLEX optimization machinery, efficiently computing near-optimal solutions for practical size problems, while giving a robust upper bound obtained from Lagrangean integrality constraint relaxation. Should eventually a target be positively detected during plan execution, a new problem instance would simply be reformulated from the current state, and then solved over the next decision cycle. A computational experiment shows the feasibility and the value of the proposed approach.
Abstract: This work addresses the problem of production planning that arises in the production of aromatic coconuts from Samudsakhorn province in Thailand. The planning involves the forwarding of aromatic coconuts from the harvest areas to the factory, which is classified into two groups; self-owned areas and contracted areas, the decisions of aromatic coconuts flow in the plant, and addressing a question of which warehouse will be in use. The problem is formulated as a mixed-integer linear programming model within supply chain management framework. The objective function seeks to minimize the total cost including the harvesting, labor and inventory costs. Constraints on the system include the production activities in the company and demand requirements. Numerical results are presented to demonstrate the feasibility of coconuts supply chain model compared with base case.
Abstract: Due to uncertainty of wind velocity, wind power generators don’t have deterministic output power. Utilizing wind power generation and thermal power plants together create new concerns for operation engineers of power systems. In this paper, a model is presented to implement the uncertainty of load and generated wind power which can be utilized in power system operation planning. Stochastic behavior of parameters is simulated by generating scenarios that can be solved by deterministic method. A mixed-integer linear programming method is used for solving deterministic generation scheduling problem. The proposed approach is applied to a 12-unit test system including 10 thermal units and 2 wind farms. The results show affectivity of piecewise linear model in unit commitment problems. Also using linear programming causes a considerable reduction in calculation times and guarantees convergence to the global optimum. Neglecting the uncertainty of wind velocity causes higher cost assessment of generation scheduling.
Abstract: One of the most important problems in production planning of flexible manufacturing system (FMS) is machine tool selection and operation allocation problem that directly influences the production costs and times .In this paper minimizing machining cost, set-up cost and material handling cost as a multi-objective problem in flexible manufacturing systems environment are considered. We present a 0-1 integer linear programming model for the multiobjective machine tool selection and operation allocation problem and due to the large scale nature of the problem, solving the problem to obtain optimal solution in a reasonable time is infeasible, Paretoant colony optimization (P-ACO) approach for solving the multiobjective problem in reasonable time is developed. Experimental results indicate effectiveness of the proposed algorithm for solving the problem.
Abstract: This paper presents one comprehensive modelling approach for maintenance scheduling problem of thermal power units in competitive market. This problem is formulated as a 0/1 mixedinteger linear programming model. Model incorporates long-term bilateral contracts with defined profiles of power and price, and weekly forecasted market prices for market auction. The effectiveness of the proposed model is demonstrated through case study with detailed discussion.
Abstract: Process planning and production scheduling play
important roles in manufacturing systems. In this paper a multiobjective
mixed integer linear programming model is presented for
the integrated planning and scheduling of multi-product. The aim is
to find a set of high-quality trade-off solutions. This is a
combinatorial optimization problem with substantially large solution
space, suggesting that it is highly difficult to find the best solutions
with the exact search method. To account for it, a PSO-based
algorithm is proposed by fully utilizing the capability of the
exploration search and fast convergence. To fit the continuous PSO
in the discrete modeled problem, a solution representation is used in
the algorithm. The numerical experiments have been performed to
demonstrate the effectiveness of the proposed algorithm.
Abstract: The important issue considered in the widespread deployment of Wireless Sensor Networks (WSNs) is an efficiency of the energy consumption. In this paper, we present a study of the optimal relay station planning problems using Binary Integer Linear Programming (BILP) model to minimize the energy consumption in WSNs. Our key contribution is that the proposed model not only ensures the required network lifetime but also guarantees the radio connectivity at high level of communication quality. Specially, we take into account effects of noise, signal quality limitation and bit error rate characteristics. Numerical experiments were conducted in various network scenarios. We analyzed the effects of different sensor node densities and distribution on the energy consumption.
Abstract: This paper presents the development of an electricity simulation model taking into account electrical network constraints, applied on the Belgian power system. The base of the model is optimizing an extensive Unit Commitment (UC) problem through the use of Mixed Integer Linear Programming (MILP). Electrical constraints are incorporated through the implementation of a DC load flow. The model encloses the Belgian power system in a 220 – 380 kV high voltage network (i.e., 93 power plants and 106 nodes). The model features the use of pumping storage facilities as well as the inclusion of spinning reserves in a single optimization process. Solution times of the model stay below reasonable values.
Abstract: Rapid economic development and population growth
in Malaysia had accelerated the generation of solid waste. This issue
gives pressure for effective management of municipal solid waste
(MSW) to take place in Malaysia due to the increased cost of landfill.
This paper discusses optimal planning of waste-to-energy (WTE)
using a combinatorial simulation and optimization model through
mixed integer linear programming (MILP) approach. The proposed
multi-period model is tested in Iskandar Malaysia (IM) as case study
for a period of 12 years (2011 -2025) to illustrate the economic
potential and tradeoffs involved in this study. In this paper, 3
scenarios have been used to demonstrate the applicability of the
model: (1) Incineration scenario (2) Landfill scenario (3) Optimal
scenario. The model revealed that the minimum cost of electricity
generation from 9,995,855 tonnes of MSW is estimated as USD
387million with a total electricity generation of 50MW /yr in the
optimal scenario.
Abstract: This work concerns the topological optimization
problem for determining the optimal petroleum refinery
configuration. We are interested in further investigating and
hopefully advancing the existing optimization approaches and
strategies employing logic propositions to conceptual process
synthesis problems. In particular, we seek to contribute to this
increasingly exciting area of chemical process modeling by
addressing the following potentially important issues: (a) how the
formulation of design specifications in a mixed-logical-and-integer
optimization model can be employed in a synthesis problem to enrich
the problem representation by incorporating past design experience,
engineering knowledge, and heuristics; and (b) how structural
specifications on the interconnectivity relationships by space (states)
and by function (tasks) in a superstructure should be properly
formulated within a mixed-integer linear programming (MILP)
model. The proposed modeling technique is illustrated on a case
study involving the alternative processing routes of naphtha, in which
significant improvement in the solution quality is obtained.