Abstract: This paper present the experimental work of double
unit tunnel form building (TFB) subjected to in-plane lateral cyclic
loading. A one third scale of 3-storey double unit of TFB is tested
until its strength degradation. Then, the TFB is repaired and
retrofitted using additional shear wall, steel angle and CFRP sheet.
The crack patterns, lateral strength, stiffness, ductility and equivalent
viscous damping (EVD) were analyzed and compared before and
after repair and retrofit. The result indicates that the lateral strength
increases by 22% in pushing and 27% in pulling direction. Moreover,
the stiffness and ductility obtained before and after retrofit increase
tremendously by 87.87% and 39.66%, respectively. Meanwhile, the
energy absorption measured by equivalent viscous damping obtained
after retrofit increase by 12.34% in pulling direction. It can be
concluded that the proposed retrofit method is capable to increase the
lateral strength capacity, stiffness and energy absorption of double
unit TFB.
Abstract: InGaAsN and GaAsN epitaxial layers with similar
nitrogen compositions in a sample were successfully grown on a
GaAs (001) substrate by solid source molecular beam epitaxy. An
electron cyclotron resonance nitrogen plasma source has been used to
generate atomic nitrogen during the growth of the nitride layers. The
indium composition changed from sample to sample to give
compressive and tensile strained InGaAsN layers. Layer
characteristics have been assessed by high-resolution x-ray
diffraction to determine the relationship between the lattice constant
of the GaAs1-yNy layer and the fraction x of In. The objective was to
determine the In fraction x in an InxGa1-xAs1-yNy epitaxial layer which
exactly cancels the strain present in a GaAs1-yNy epitaxial layer with
the same nitrogen content when grown on a GaAs substrate.
Abstract: Rapid economic development and population growth
in Malaysia had accelerated the generation of solid waste. This issue
gives pressure for effective management of municipal solid waste
(MSW) to take place in Malaysia due to the increased cost of landfill.
This paper discusses optimal planning of waste-to-energy (WTE)
using a combinatorial simulation and optimization model through
mixed integer linear programming (MILP) approach. The proposed
multi-period model is tested in Iskandar Malaysia (IM) as case study
for a period of 12 years (2011 -2025) to illustrate the economic
potential and tradeoffs involved in this study. In this paper, 3
scenarios have been used to demonstrate the applicability of the
model: (1) Incineration scenario (2) Landfill scenario (3) Optimal
scenario. The model revealed that the minimum cost of electricity
generation from 9,995,855 tonnes of MSW is estimated as USD
387million with a total electricity generation of 50MW /yr in the
optimal scenario.