Virtual Container Yard: A Paradigm Shift in Container Inventory Management

A paradigm shift in container inventory management (CIM) is a long-awaited industry need. Virtual container yard (VCY) is a concept developed in 2013 and its primary objective is to minimize shipping transport cost through implementing container exchange between carriers. Shipping lines always try to maintain lower container idle time and provide higher customer satisfaction. However, it is disappointing to note that carriers turn a blind eye to the escalating cost resulted from the present inefficient CIM mechanism. The cost of empty container management is simply transferred to the importers and exporters as freight adjustments. It also creates an environmental hazard. Therefore, it has now become a problem for the society. Therefore, a paradigm shift may be required as the present CIM system is not working for common interests of human beings as it should be.

Multi-Stage Multi-Period Production Planning in Wire and Cable Industry

This paper presents a methodology for serial production planning problem in wire and cable manufacturing process that addresses the problem of input-output imbalance in different consecutive stations, hoping to minimize the halt of machines in each stage. To this end, a linear Goal Programming (GP) model is developed, in which four main categories of constraints as per the number of runs per machine, machines’ sequences, acceptable inventories of machines at the end of each period, and the necessity of fulfillment of the customers’ orders are considered. The model is formulated based upon on the real data obtained from IKO TAK Company, an important supplier of wire and cable for oil and gas and automotive industries in Iran. By solving the model in GAMS software the optimal number of runs, end-of-period inventories, and the possible minimum idle time for each machine are calculated. The application of the numerical results in the target company has shown the efficiency of the proposed model and the solution in decreasing the lead time of the end product delivery to the customers by 20%. Accordingly, the developed model could be easily applied in wire and cable companies for the aim of optimal production planning to reduce the halt of machines in manufacturing stages.

Benchmarking Role in Internal Supply Chain Management of Indian Manufacturing Industries

Due to day by day competition in the market, the implementation of benchmarking practice is necessary for improving existing internal supply chain management performance of manufacturing industries. The continuous benchmarking practice might be helpful to increase the productivity of middle scale medium enterprises (MSMEs) by reducing the idle time during the flow of raw material/products, funds and information. The objective of this research paper is to provide an overview of benchmarking, benchmarking wheel, benchmarking tool and techniques and its importance through literature review of reputed journals. This concept of benchmarking may be fruitful in the process of gap identification and for improving the performance of internal supply chain management of Indian manufacturing industries.

Framework Study on Single Assembly Line to Improve Productivity with Six Sigma and Line Balancing Approach

Six sigma is a framework that is used to identify inefficiency so that the cause of inefficiency will be known and right improvement to overcome cause of inefficiency can be conducted. This paper presents result of implementing six sigma to improve piston assembly line in Manufacturing Laboratory, Universitas Indonesia. Six sigma framework will be used to analyze the significant factor of inefficiency that needs to be improved which causes bottleneck in assembly line. After analysis based on six sigma framework conducted, line balancing method was chosen for improvement to overcome causative factor of inefficiency which is differences time between workstation that causes bottleneck in assembly line. Then after line balancing conducted in piston assembly line, the result is increase in efficiency. Efficiency is shown in the decreasing of Defects per Million Opportunities (DPMO) from 900,000 to 700,000, the increasing of level of labor productivity from 0.0041 to 0.00742, the decreasing of idle time from 121.3 seconds to 12.1 seconds, and the increasing of output, which is from 1 piston in 5 minutes become 3 pistons in 5 minutes.

Implementation and Demonstration of Software-Defined Traffic Grooming

Since the traditional network is closed and it has no architecture to create applications, it has been unable to evolve with changing demands under the rapid innovation in services. Additionally, due to the lack of the whole network profile, the quality of service cannot be well guaranteed in the traditional network. The Software Defined Network (SDN) utilizes global resources to support on-demand applications/services via open, standardized and programmable interfaces. In this paper, we implement the traffic grooming application under a real SDN environment, and the corresponding analysis is made. In our SDN: 1) we use OpenFlow protocol to control the entire network by using software applications running on the network operating system; 2) several virtual switches are combined into the data forwarding plane through Open vSwitch; 3) An OpenFlow controller, NOX, is involved as a logically centralized control plane that dynamically configures the data forwarding plane; 4) The traffic grooming based on SDN is demonstrated through dynamically modifying the idle time of flow entries. The experimental results demonstrate that the SDN-based traffic grooming effectively reduces the end-to-end delay, and the improvement ratio arrives to 99%.

Using the Simple Fixed Rate Approach to Solve Economic Lot Scheduling Problem under the Basic Period Approach

The Economic Lot Scheduling Problem (ELSP) is a valuable mathematical model that can support decision-makers to make scheduling decisions. The basic period approach is effective for solving the ELSP. The assumption for applying the basic period approach is that a product must use its maximum production rate to be produced. However, a product can lower its production rate to reduce the average total cost when a facility has extra idle time. The past researches discussed how a product adjusts its production rate under the common cycle approach. To the best of our knowledge, no studies have addressed how a product lowers its production rate under the basic period approach. This research is the first paper to discuss this topic. The research develops a simple fixed rate approach that adjusts the production rate of a product under the basic period approach to solve the ELSP. Our numerical example shows our approach can find a better solution than the traditional basic period approach. Our mathematical model that applies the fixed rate approach under the basic period approach can serve as a reference for other related researches.

Some Issues with Extension of an HPC Cluster

Homemade HPC clusters are widely used in many small labs, because they are easy to build and cost-effective. Even though incremental growth is an advantage of clusters, it results in heterogeneous systems anyhow. Instead of adding new nodes to the cluster, we can extend clusters to include some other Internet servers working independently on the same LAN, so that we can make use of their idle times, especially during the night. However extension across a firewall raises some security problems with NFS. In this paper, we propose a method to solve such a problem using SSH tunneling, and suggest a modified structure of the cluster that implements it.

A Study of Lean Principles Implementation in the Libyan Healthcare and Industry Sectors

Lean technique is very important in the service and industrial fields. It is defined as an effective tool to eliminate the wastes. In lean the wastes are defined as anything which does not add value to the end product. There are wastes that can be avoided, but some are unavoidable for many reasons.     The present study aims to apply the principles of lean in two different sectors, healthcare and industry. Two case studies have been selected to apply the experimental work. The first case was Al-Jalaa Hospital, while the second case study was the Technical Company of Aluminum Sections in Benghazi, LIBYA. In both case studies the Value Stream Map (VSM) of the current state has been constructed. The proposed plans have been implemented by merging or eliminating procedures or processes. The results obtained from both case studies showed improvement in Capacity, Idle time and Utilized time.

Power Saving System in Green Data Center

Power consumption is rapidly increased in data centers because the number of data center is increased and more the scale of data center become larger. Therefore, it is one of key research items to reduce power consumption in data center. The peak power of a typical server is around 250 watts. When a server is idle, it continues to use around 60% of the power consumed when in use, though vendors are putting effort into reducing this “idle" power load. Servers tend to work at only around a 5% to 20% utilization rate, partly because of response time concerns. An average of 10% of servers in their data centers was unused. In those reason, we propose dynamic power management system to reduce power consumption in green data center. Experiment result shows that about 55% power consumption is reduced at idle time.

Analysis of Production Loss on a Linear Walking Worker Line

This paper mathematically analyses the varying magnitude of production loss, which may occur due to idle time (inprocess waiting time and traveling time) on a linear walking worker assembly line. Within this flexible and reconfigurable assembly system, each worker travels down the line carrying out each assembly task at each station; and each worker accomplishes the assembly of a unit from start to finish and then travels back to the first station to start the assembly of a new product. This strategy of system design attempts to combine the flexibility of the U-shaped moving worker assembly cell with the efficiency of the conventional fixed worker assembly line. The paper aims to evaluate the effect of idle time that may offset the labor efficiency of each walking worker providing an insight into the mechanism of such a flexible and reconfigurable assembly system.

A Scatter Search and Help Policies Approaches for a New Mixed Model Assembly Lines Sequencing Problem

Mixed Model Production is the practice of assembling several distinct and different models of a product on the same assembly line without changeovers and then sequencing those models in a way that smoothes the demand for upstream components. In this paper, we consider an objective function which minimizes total stoppage time and total idle time and it is presented sequence dependent set up time. Many studies have been done on the mixed model assembly lines. But in this paper we specifically focused on reducing the idle times. This is possible through various help policies. For improving the solutions, some cases developed and about 40 tests problem was considered. We use scatter search for optimization and for showing the efficiency of our algorithm, experimental results shows behavior of method. Scatter search and help policies can produce high quality answers, so it has been used in this paper.