Analysis of Production Loss on a Linear Walking Worker Line

This paper mathematically analyses the varying magnitude of production loss, which may occur due to idle time (inprocess waiting time and traveling time) on a linear walking worker assembly line. Within this flexible and reconfigurable assembly system, each worker travels down the line carrying out each assembly task at each station; and each worker accomplishes the assembly of a unit from start to finish and then travels back to the first station to start the assembly of a new product. This strategy of system design attempts to combine the flexibility of the U-shaped moving worker assembly cell with the efficiency of the conventional fixed worker assembly line. The paper aims to evaluate the effect of idle time that may offset the labor efficiency of each walking worker providing an insight into the mechanism of such a flexible and reconfigurable assembly system.




References:
[1] W. J. Hopp, M. R. Iravani, and B. Shou, "Serial agile production systems
with automation," Operations Research, vol. 52, pp. 852-866, 2005.
[2] H. Bley, G. Reninhart, G. Seliger, M. Bernardi, and T. Korne,
"Appropriate human involvement in assembly and disassembly," CIRP
Annals, vol. 53, pp. 487-509, 2004.
[3] A. I. Bractu, and A. Dolgui, "A survey of the self-balancing production
lines ("bucket brigades")," Journal of Intelligent Manufacturing, vol. 16,
pp. 139-158, 2005.
[4] A. I. Bratcu, and A. Dolgui, "Some new results on the analysis and
simulation of bucket brigades (self-balancing production lines),"
International Journal of Production Research, vol. 47, pp. 369-387,
2009.
[5] J. J. Bartholdi, D. Leonid, and D. D. Eisenstein, "Dynamics of two- and
three-worker "bucket brigade" production lines," Operations Research,
vol. 47, pp. 488-491, 1999.
[6] E. Zavadlav, J. O. McClain, and L. J. Thomas, "Self-buffering, selfbalancing,
self-flushing production lines," Management Science, vol. 42,
pp. 1151-1164, 1996.