Abstract: The article presents a plasma chemical technology for
processing solid fuels, using examples of bituminous and brown
coals. Thermodynamic and experimental investigation of the
technology was made. The technology allows producing synthesis
gas from the coal organic mass and valuable components (technical
silicon, ferrosilicon, aluminum, and carbon silicon, as well as
microelements of rare metals, such as uranium, molybdenum,
vanadium, etc.) from the mineral mass. The thusly produced highcalorific
synthesis gas can be used for synthesis of methanol, as a
high-calorific reducing gas instead of blast-furnace coke as well as
power gas for thermal power plants.
Abstract: The formulated problem of optimization of the
technological process of water treatment for thermal power plants is
considered in this article. The problem is of multiparametric nature.
To optimize the process, namely, reduce the amount of waste water, a
new technology was developed to reuse such water. A mathematical
model of the technology of wastewater reuse was developed.
Optimization parameters were determined. The model consists of a
material balance equation, an equation describing the kinetics of ion
exchange for the non-equilibrium case and an equation for the ion
exchange isotherm. The material balance equation includes a
nonlinear term that depends on the kinetics of ion exchange. A direct
problem of calculating the impurity concentration at the outlet of the
water treatment plant was numerically solved. The direct problem
was approximated by an implicit point-to-point computation
difference scheme. The inverse problem was formulated as relates to
determination of the parameters of the mathematical model of the
water treatment plant operating in non-equilibrium conditions. The
formulated inverse problem was solved. Following the results of
calculation the time of start of the filter regeneration process was
determined, as well as the period of regeneration process and the
amount of regeneration and wash water. Multi-parameter
optimization of water treatment process for thermal power plants
allowed decreasing the amount of wastewater by 15%.
Abstract: In this study, the performance analyses of the twenty
five Coal-Fired Power Plants (CFPPs) used for electricity generation
are carried out through various Data Envelopment Analysis (DEA)
models. Three efficiency indices are defined and pursued. During the
calculation of the operational performance, energy and non-energy
variables are used as input, and net electricity produced is used as
desired output (Model-1). CO2 emitted to the environment is used as
the undesired output (Model-2) in the computation of the pure
environmental performance while in Model-3 CO2 emissions is
considered as detrimental input in the calculation of operational and
environmental performance. Empirical results show that most of the
plants are operating in increasing returns to scale region and Mettur
plant is efficient one with regards to energy use and environment.
The result also indicates that the undesirable output effect is
insignificant in the research sample. The present study will provide
clues to plant operators towards raising the operational and
environmental performance of CFPPs.
Abstract: Since large part of electricity is generated by using
fossil based resources, energy is an important agenda for countries. In
this context, renewable energy sources are alternative to conventional
sources due to the depletion of fossil resources, increasing awareness
of climate change and global warming concerns. Solar, wind and
hydropower energy are the main renewable energy sources. Among
of them, since installed capacity of wind power has increased
approximately eight times between 2008 - November of 2014, wind
energy is a promising source for Turkey. Furthermore, signing of
Kyoto Protocol can be accepted as a milestone for Turkey's energy
policy. Turkish Government has announced Vision 2023 (energy
targets by 2023) in 2010-2014 Strategic Plan prepared by Ministry of
Energy and Natural Resources (MENR). Energy targets in this plan
can be summarized as follows: Share of renewable energy sources in
electricity generation is 30% of total electricity generation by 2023.
Installed capacity of wind energy will be 20 GW by 2023. Other
renewable energy sources such as solar, hydropower and geothermal
are encouraged with new incentive mechanisms. Dependence on
foreign energy is reduced for sustainability and energy security. On
the other hand, since Turkey is surrounded by three coastal areas,
wind energy potential is convenient for wind power application. As
of November of 2014, total installed capacity of wind power plants is
3.51 GW and a lot of wind power plants are under construction with
capacity 1.16 GW. Turkish government also encourages the locally
manufactured equipments. In this context, one of the projects funded
by private sector, universities and TUBİTAK names as MILRES is
an important project aimed to promote the use wind energy in
electricity generation. Within this project, wind turbine with 500 kW
power has been produced and will be installed at the beginning of the
2015. After that, by using the experience obtained from the first
phase of the project, a wind turbine with 2.5 MW power will be
manufactured in an industrial scale.
Abstract: The operation of nuclear power plants involves
continuous monitoring of the environment in their area. This
monitoring is performed using a complex data acquisition system,
which collects status information about the system itself and values
of many important physical variables e.g. temperature, humidity,
dose rate etc. This paper describes a proposal and optimization of
communication that takes place in teledosimetric system between the
central control server responsible for the data processing and storing
and the decentralized measuring stations, which are measuring the
physical variables. Analyzes of ongoing communication were
performed and consequently the optimization of the system
architecture and communication was done.
Abstract: This article describes the information system for
measuring and evaluating the dose rate in the environment of nuclear
power plants Mochovce and Bohunice in Slovakia.
The article presents the results achieved in the implementation of
the EU project – Research of monitoring and evaluation of nonstandard
conditions in the area of nuclear power plants. The
objectives included improving the system of acquisition, measuring
and evaluating data with mobile and autonomous units applying new
knowledge from research.
The article provides basic and specific features of the system and
compared to the previous version of the system, also new functions.
Abstract: The use of permanent magnets (PM) is increasing in
permanent magnet synchronous machines (PMSM) to fulfill the
requirements of high efficiency machines in modern industry. PMSM
are widely used in industrial applications, wind power plants and the
automotive industry. Since PMSM are used in different
environmental conditions, the long-term effect of NdFeB-based
magnets at high temperatures and their corrosion behavior have to be
studied due to the irreversible loss of magnetic properties.
In this paper, the effect of magnetic properties due to corrosion
and increasing temperature in a climatic chamber has been presented.
The magnetic moment and magnetic field of the magnets were
studied experimentally.
Abstract: Fly ash is an important waste, produced in thermal
power plants which causes very important environmental pollutions.
For this reason the usage and evaluation the fly ash in various areas
are very important. Nearly, 15 million tons/year of fly ash is
produced in Turkey. In this study, usage of fly ash with diatomite and
molasses for heavy metal (Cd) adsorption from wastewater is
investigated. The samples of Seyitomer region fly ash were analyzed
by X-ray fluorescence (XRF) and Scanning Electron Microscope
(SEM) then diatomite (0 and 1% in terms of fly ash, w/w) and
molasses (0-0.75 mL) were pelletized under 30 MPa of pressure for
the usage of cadmium (Cd) adsorption in wastewater. After the
adsorption process, samples of Seyitomer were analyzed using
Optical Emission Spectroscopy (ICP-OES). As a result, it is seen that
the usage of Seyitomer fly ash is proper for cadmium (Cd) adsorption
and an optimum adsorption yield with 52% is found at a compound
with Seyitomer fly ash (10 g), diatomite (0.5 g) and molasses (0.75
mL) at 2.5 h of reaction time, pH:4, 20ºC of reaction temperature and
300 rpm of stirring rate.
Abstract: The dry-storage systems of nuclear power plants (NPPs) in Taiwan have become one of the major safety concerns. There are two steps considered in this study. The first step is the verification of the TRACE by using VSC-17 experimental data. The results of TRACE were similar to the VSC-17 data. It indicates that TRACE has the respectable accuracy in the simulation and analysis of the dry-storage systems. The next step is the application of TRACE in the dry-storage system of Kuosheng NPP (BWR/6). Kuosheng NPP is the second BWR NPP of Taiwan Power Company. In order to solve the storage of the spent fuels, Taiwan Power Company developed the new dry-storage system for Kuosheng NPP. In this step, the dry-storage system model of Kuosheng NPP was established by TRACE. Then, the steady state simulation of this model was performed and the results of TRACE were compared with the Kuosheng NPP data. Finally, this model was used to perform the safety analysis of Kuosheng NPP dry-storage system. Besides, FRAPTRAN was used tocalculate the transient performance of fuel rods.
Abstract: This article analyzes the applicability of known renewable energy technical means as mobile power sources under the field and extreme conditions. The requirements are determined for the parameters of mobile micro HPP. The application prospectively of the mobile micro HPP with intelligent control systems is proved for this purpose. Variants of low-speed electric generators for micro HPP are given. Variants of designs for mobile micro HPP are presented with direct (gearless) transfer of torque from the hydraulic drive to the rotor of the electric generator. Variant of the hydraulic drive for micro HPP is described workable at low water flows. A general structure of the micro HPP intelligent system control is offered that implements the principle of maximum energy efficiency. The legitimacy of construction and application of mobile micro HPP is proved as electrical power sources for life safety of people under the field and extreme conditions.
Abstract: This article deals with the possibility of increasing efficiency, reliability and safety of the system for teledosimetric data collection management and their evaluation as a part of complex study for activity “Research of data collection, their measurement and evaluation with mobile and autonomous units” within project “Research of monitoring and evaluation of non-standard conditions in the area of nuclear power plants”. Possible weaknesses in existing system are identified. A study of available cluster solutions with possibility of their deploying to analysed system is presented
Abstract: The lignite-fired power plants in the Western Macedonia Lignite Center produce more than 8106 t of fly ash per year. Approximately 90% of this quantity is used for restoration-reclamation of exhausted open-cast lignite mines and slope stabilization of the overburden. The purpose of this work is to evaluate the environmental behavior of the mixture of waste rock and fly ash that is being used in the external deposition site of the South Field lignite mine. For this reason, a borehole was made within the site and 86 samples were taken and subjected to chemical analyses and leaching tests. The results showed very limited leaching of trace elements and heavy metals from this mixture. Moreover, when compared to the limit values set for waste acceptable in inert waste landfills, only few excesses were observed, indicating only minor risk for groundwater pollution. However, due to the complexity of both the leaching process and the contaminant pathway, more boreholes and analyses should be made in nearby locations and a systematic groundwater monitoring program should be implemented both downstream and within the external deposition site.
Abstract: Distributed generation units (DGs) are grid-connected or stand-alone electric generation units located within the electric distribution system at or near the end user. It is generally accepted that centralized electric power plants will remain the major source of the electric power supply for the near future. DGs, however, can complement central power by providing incremental capacity to the utility grid or to an end user. This paper presents an efficient power dispatching model for hybrid wind-Solar power generation system, to satisfy some essential requirements, such as dispersed electric power demand, electric power quality and reducing generation cost and so on. In this paper, presented some elements of the main parts in the hybrid system; and then made fundamental dispatching strategies according to different situations; then pointed out four improving measures to improve genetic algorithm, such as: modify the producing way of selection probability, improve the way of crossover, protect excellent chromosomes, and change mutation range and so on. Finally, propose a technique for solving the unit's commitment for dispatching problem based on an improved genetic algorithm.
Abstract: This article presents a current and future energy situation in Libya. The electric power efficiency and operating hours in power plants are evaluated from 2005 to 2010. Carbon dioxide emissions in most of power plants are estimated. In 2005, the efficiency of steam power plants achieved a range of 20% to 28%. While, the gas turbine power plants efficiency ranged between 9% and 25%, this can be considered as low efficiency. However, the efficiency improvement has clearly observed in some power plants from 2008 to 2010, especially in the power plant of North Benghazi and west Tripoli. In fact, these power plants have modified to combine cycle. The efficiency of North Benghazi power plant has increased from 25% to 46.6%, while in Tripoli it is increased from 22% to 34%. On the other hand, the efficiency improvement is not observed in the gas turbine power plants. When compared to the quantity of fuel used, the carbon dioxide emissions resulting from electricity generation plants were very high. Finally, an estimation of the energy demand has been done to the maximum load and the annual load factor (i.e., the ratio between the output power and installed power).
Abstract: Carbon capture, transport and underground storage have become a major solution to reduce CO2 emissions from power plants and other large CO2 sources. A big part of this captured CO2 stream is transported at high pressure dense phase conditions and stored in offshore underground depleted oil and gas fields. CO2 is also transported in offshore pipelines to be used for enhanced oil and gas recovery. The captured CO2 stream with impurities may contain water that causes severe corrosion problems, flow assurance failure and might damage valves and instrumentations. Thus, free water formation should be strictly prevented. The purpose of this work is to study the solubility of water in pure CO2 and in CO2 mixtures under real pipeline pressure (90-150 bar) and temperature operation conditions (5-35°C). A set up was constructed to generate experimental data. The results show the solubility of water in CO2 mixtures increasing with the increase of the temperature or/and with the increase in pressure. A drop in water solubility in CO2 is observed in the presence of impurities. The data generated were then used to assess the capabilities of two mixture models: the GERG-2008 model and the EOS-CG model. By generating the solubility data, this study contributes to determine the maximum allowable water content in CO2 pipelines.
Abstract: A failure of the non-structural component can cause significant damages in critical facilities such as nuclear power plants and hospitals. Historically, it was reported that the damage from the leakage of sprinkler systems, resulted in the shutdown of hospitals for several weeks by the 1971 San Fernando and 1994 North Ridge earthquakes. In most cases, water leakages were observed at the cross joints, sprinkler heads, and T-joint connections in piping systems during and after the seismic events. Hence, the primary objective of this study was to understand the seismic performance of T-joint connections and to develop an analytical Finite Element (FE) model for the T-joint systems of 2-inch fire protection piping system in hospitals subjected to seismic ground motions. In order to evaluate the FE models of the piping systems using OpenSees, two types of materials were used: 1) Steel02 materials and 2) Pinching4 materials. Results of the current study revealed that the nonlinear moment-rotation FE models for the threaded T-joint reconciled well with the experimental results in both FE material models. However, the system-level fragility determined from multiple nonlinear time history analyses at the threaded T-joint was slightly different. The system-level fragility at the T-joint, determined by Pinching4 material was more conservative than that of using Steel02 material in the piping system.
Abstract: One of the most challenging times in operation of big industrial plant or utilities is the time that alert lamp of Bently Nevada connection in main board substation turn on and show the alert condition of machine. All of the maintenance groups usually make a lot of discussion with operation and together rather this alert signal is real or fake. This will be more challenging when condition monitoring vibrationdata shows 1X(X=current rotor frequency) in fast Fourier transform(FFT) and vibration phase trends show 90 degree shift between two non-contact probedirections with overall high radial amplitude amounts. In such situations, CM (condition monitoring) groups usually suspicious about unbalance in rotor. In this paper, four critical case histories related to SIEMENS V94.2 Gas Turbines in Iran power industry discussed in details. Furthermore, probe looseness and fake (unreal) trip in gas turbine power plants discussed. In addition, critical operation decision in alert condition in power plants discussed in details.
Abstract: Research on the utilization of fly ash will no longer refer the fly ash as a waste material of thermal power plants. Use of fly ash in concrete making, makes the concrete economical as well as durable. The fly ash is being added to the concrete in three ways namely, as partial replacement to cement, as partial replacement to fine aggregates and as admixture. Addition of fly ash to the concrete in any one of the form mentioned above, makes the concrete more workable and durable than the conventional concrete. Studies on fly ash as partial replacement to cement gained momentum as such replacement makes the concrete economical. In the present study, an attempt has been made to understand the effects of fly ash on the workability characteristics and strength aspects of fly ash concretes. In India major number of thermal power plants is producing low calcium fly ash. Hence in the present investigation low calcium fly ash has been used. Fly ash in concrete was considered for the partial replacement of cement. The percentage replacement of cement by fly ash varied from 0% to 40% at regular intervals of 10%. More over the fine aggregate to coarse aggregate ratio also has been varied as 1:1, 1:2 and 1:3. The workability tests revealed that up to 30% replacement of cement by fly ash in concrete mixes water demand for reduces, beyond 30% replacement of cement by fly ash demanded more water content for constant workability.
Abstract: The objective of this work was to study potential of rice straw for power plant in the Central region of Thailand. Provincial power plant capacity was studied. The results showed that provinces central region had potential for small power plants with a capacity of over 10 MW in 13 provinces, 1-10 MW in 6 provinces and less than 1 MW in 3 provinces.
Abstract: Vibration analysis is the most important factor in preventive maintenance. Gas turbine vibration analysis is also one of the most challenging categories in most critical equipment monitoring systems. Utilities are heart of the process in big industrial plants like petrochemical zones. Vibration analysis methods and condition monitoring systems of this kind of equipment developed too much in recent years. On the other hand, too much operation condition consideration in this kind of equipment should be adjusted properly like inlet and outlet pressure and temperature for both turbine and compressor. In this paper the most important tools and hypothesis used for analyzing of gas turbine power plants discussed in details through a real case history related to an Alstom Typhoon gas turbine power plant in Iran oil industries. In addition, the basic principal of vibration behavior caused by mechanical unbalance in gas turbine rotor discussed in details.