Abstract: Back-to-back static synchronous compensator (BtBSTATCOM) consists of two back-to-back voltage-source converters (VSC) with a common DC link in a substation. This configuration extends the capabilities of conventional STATCOM that bidirectional active power transfer from one bus to another is possible. In this paper, VSCs are designed in quasi multi-pulse form in which GTOs are triggered only once per cycle in PSCAD/EMTDC. The design details of VSCs as well as gate switching circuits and controllers are fully represented. Regulation modes of BtBSTATCOM are verified and tested on a multi-machine power system through different simulation cases. The results presented in the form of typical time responses show that practical PI controllers are almost robust and stable in case of start-up, set-point change, and line faults.
Abstract: The ability to detect and classify the type of fault
plays a great role in the protection of power system. This procedure
is required to be precise with no time consumption. In this paper
detection of fault type has been implemented using wavelet analysis
together with wavelet entropy principle. The simulation of power
system is carried out using PSCAD/EMTDC. Different types of
faults were studied obtaining various current waveforms. These
current waveforms were decomposed using wavelet analysis into
different approximation and details. The wavelet entropy of such
decompositions is analyzed reaching a successful methodology for
fault classification. The suggested approach is tested using different
fault types and proven successful identification for the type of fault.
Abstract: The two significant overvoltages in power system,
switching overvoltage and lightning overvoltage, are investigated in
this paper. Firstly, the effect of various power system parameters on
Line Energization overvoltages is evaluated by simulation in ATP.
The dominant parameters include line parameters; short-circuit
impedance and circuit breaker parameters. Solutions to reduce
switching overvoltages are reviewed and controlled closing using
switchsync controllers is proposed as proper method.
This paper also investigates lightning overvoltages in the
overhead-cable transition. Simulations are performed in
PSCAD/EMTDC. Surge arresters are applied in both ends of cable to
fulfill the insulation coordination. The maximum amplitude of
overvoltages inside the cable is surveyed which should be of great
concerns in insulation coordination studies.