Abstract: The paper is focused to the evaluation railway tracks
in the Slovakia by using Multi-Criteria method. Evaluation of railway
tracks has important impacts for the assessment of investment in
technical equipment. Evaluation of railway tracks also has an
important impact for the allocation of marshalling yards. Marshalling
yards are in transport model as centers for the operation assigned
catchment area. This model is one of the effective ways to meet the
development strategy of the European Community's railways. By
applying this model in practice, a transport company can guarantee a
higher quality of service and then expect an increase in performance.
The model is also applicable to other rail networks. This model
supplements a theoretical problem of train formation problem of new
ways of looking at evaluation of factors affecting the organization of
wagon flows.
Abstract: Batch production plants provide a wide range of
scheduling problems. In pharmaceutical industries a batch process
is usually described by a recipe, consisting of an ordering of tasks
to produce the desired product. In this research work we focused
on pharmaceutical production processes requiring the culture of
a microorganism population (i.e. bacteria, yeasts or antibiotics).
Several sources of uncertainty may influence the yield of the culture
processes, including (i) low performance and quality of the cultured
microorganism population or (ii) microbial contamination. For
these reasons, robustness is a valuable property for the considered
application context. In particular, a robust schedule will not collapse
immediately when a cell of microorganisms has to be thrown away
due to a microbial contamination. Indeed, a robust schedule should
change locally in small proportions and the overall performance
measure (i.e. makespan, lateness) should change a little if at all.
In this research work we formulated a constraint programming
optimization (COP) model for the robust planning of antibiotics
production. We developed a discrete-time model with a multi-criteria
objective, ordering the different criteria and performing a
lexicographic optimization. A feasible solution of the proposed
COP model is a schedule of a given set of tasks onto available
resources. The schedule has to satisfy tasks precedence constraints,
resource capacity constraints and time constraints. In particular
time constraints model tasks duedates and resource availability
time windows constraints. To improve the schedule robustness, we
modeled the concept of (a, b) super-solutions, where (a, b) are input
parameters of the COP model. An (a, b) super-solution is one in
which if a variables (i.e. the completion times of a culture tasks)
lose their values (i.e. cultures are contaminated), the solution can be
repaired by assigning these variables values with a new values (i.e.
the completion times of a backup culture tasks) and at most b other
variables (i.e. delaying the completion of at most b other tasks).
The efficiency and applicability of the proposed model is
demonstrated by solving instances taken from a real-life
pharmaceutical company. Computational results showed that
the determined super-solutions are near-optimal.
Abstract: ABC classification is widely used by managers for
inventory control. The classical ABC classification is based on Pareto
principle and according to the criterion of the annual use value only.
Single criterion classification is often insufficient for a closely
inventory control. Multi-criteria inventory classification models have
been proposed by researchers in order to consider other important
criteria. From these models, we will consider a specific model in
order to make a sensitive analysis on the composite score calculated
for each item. In fact, this score, based on a normalized average
between a good and a bad optimized index, can affect the ABC-item
classification. We will focus on items differently assigned to classes
and then propose a classification compromise.
Abstract: The Analytic Hierarchy Process is frequently used
approach for solving decision making problems. There exists wide
range of software programs utilizing that approach. Their main
disadvantage is that they are relatively expensive and missing
intermediate calculations. This work introduces a Microsoft Excel
add-in called DAME – Decision Analysis Module for Excel.
Comparing to other computer programs DAME is free, can work
with scenarios or multiple decision makers and displays intermediate
calculations. Users can structure their decision models into three
levels – scenarios/users, criteria and variants. Items on all levels can
be evaluated either by weights or pair-wise comparisons. There are
provided three different methods for the evaluation of the weights of
criteria, the variants as well as the scenarios – Saaty’s Method,
Geometric Mean Method and Fuller’s Triangle Method.
Multiplicative and additive syntheses are supported. The proposed
software package is demonstrated on couple of illustrating examples
of real life decision problems.
Abstract: Rapid industrialization results in increased use of natural resources bring along serious ecological and environmental imbalance due to the dumping of industrial wastes. Principles of sustainable construction have to be accepted with regard to the consumption of natural resources and the production of harmful emissions. Cement is a great importance raw material in the building industry and today is its large amount used in the construction of concrete pavements. Concerning raw materials cost and producing CO2 emission the replacing of cement in concrete mixtures with more sustainable materials is necessary. To reduce this environmental impact people all over the world are looking for a solution. Over a period of last ten years, the image of fly ash has completely been changed from a polluting waste to resource material and it can solve the major problems of cement use. Fly ash concretes are proposed as a potential approach for achieving substantial reductions in cement. It is known that it improves the workability of concrete, extends the life cycle of concrete roads, and reduces energy use and greenhouse gas as well as amount of coal combustion products that must be disposed in landfills.
Life cycle assessment also proved that a concrete pavement with fly ash cement replacement is considerably more environmentally friendly compared to standard concrete roads. In addition, fly ash is cheap raw material, and the costs saving are guaranteed. The strength properties, resistance to a frost or de-icing salts, which are important characteristics in the construction of concrete pavements, have reached the required standards as well. In terms of human health it can´t be stated that a concrete cover with fly ash could be dangerous compared with a cover without fly ash. Final Multi-criteria analysis also pointed that a concrete with fly ash is a clearly proper solution.
Abstract: In our business field today, one of the most important issues for any enterprises is cost minimization and profit maximization. Second issue is how to develop a strong and capable model that is able to give us desired forecasting of these two issues. Many researches deal with these issues using different methods. In this study, we developed a model for multi-criteria production program optimization, integrated with Artificial Neural Network.
The prediction of the production cost and profit per unit of a product, dealing with two obverse functions at same time can be extremely difficult, especially if there is a great amount of conflict information about production parameters.
Feed-Forward Neural Networks are suitable for generalization, which means that the network will generate a proper output as a result to input it has never seen. Therefore, with small set of examples the network will adjust its weight coefficients so the input will generate a proper output.
This essential characteristic is of the most important abilities enabling this network to be used in variety of problems spreading from engineering to finance etc.
From our results as we will see later, Feed-Forward Neural Networks has a strong ability and capability to map inputs into desired outputs.
Abstract: Supplier selection is considered as one of the most critical issues encountered by operations and purchasing managers to sharpen the company’s competitive advantage. In this paper, a novel fuzzy multi-criteria group decision making approach integrating quality function deployment (QFD) and decision making trial and evaluation laboratory (DEMATEL) method is proposed for supplier selection. The proposed methodology enables to consider the impacts of inner dependence among supplier assessment criteria. A house of quality (HOQ) which translates purchased product features into supplier assessment criteria is built using the weights obtained by DEMATEL approach to determine the desired levels of supplier assessment criteria. Supplier alternatives are ranked by a distance-based method.
Abstract: Globalization is putting enormous pressure on the business organizations specially manufacturing one to rethink the supply chain in innovative manners. Inventory consumes major portion of total sale revenue. Effective and efficient inventory management plays a vital role for the successful functioning of any organization. Selection of inventory policy is one of the important purchasing activities. This paper focuses on selection and ranking of alternative inventory policies. A deterministic quantitative model based on Distance Based Approach (DBA) method has been developed for evaluation and ranking of inventory policies. We have employed this concept first time for this type of the selection problem. Four inventory policies economic order quantity (EOQ), just in time (JIT), vendor managed inventory (VMI) and monthly policy are considered. Improper selection could affect a company’s competitiveness in terms of the productivity of its facilities and quality of its products. The ranking of inventory policies is a multi-criteria problem. There is a need to first identify the selection criteria and then processes the information with reference to relative importance of attributes for comparison. Criteria values for each inventory policy can be obtained either analytically or by using a simulation technique or they are linguistic subjective judgments defined by fuzzy sets, like, for example, the values of criteria. A methodology is developed and applied to rank the inventory policies.
Abstract: Proper maintenance and preservation of significant cultural heritages or historic buildings is necessary. It can not only enhance environmental benefits and a sense of community, but also preserve a city's history and people’s memory. It allows the next generation to be able to get a glimpse of our past, and achieve the goal of sustainable preserved cultural assets. However, the management of maintenance work has not been appropriate for many designated heritages or historic buildings so far. The planning and implementation of the reuse has yet to have a breakthrough specification. It leads the heritages to a mere formality of being “reserved”, instead of the real meaning of “conservation”. For the restoration and preservation of cultural heritages study issues, it is very important due to the consideration of historical significance, symbolism, and economic benefits effects. However, the decision makers such as the officials from public sector they often encounter which heritage should be prioritized to be restored first under the available limited budgets. Only very few techniques are available today to determine the appropriately restoration priorities for the diverse historical heritages, perhaps because of a lack of systematized decision-making aids been proposed before. In the past, the discussions of management and maintenance towards cultural assets were limited to the selection of reuse alternatives instead of the allocation of resources. In view of this, this research will adopt some integrated research methods to solve the existing problems that decision-makers might encounter when allocating resources in the management and maintenance of heritages and historic buildings.
The purpose of this study is to develop a sustainable decision making model for local governments to resolve these problems. We propose an alternative decision support model to prioritize restoration needs within the limited budgets. The model is constructed based on fuzzy Delphi, fuzzy analysis network process (FANP) and goal programming (GP) methods. In order to avoid misallocate resources; this research proposes a precise procedure that can take multi-stakeholders views, limited costs and resources into consideration. Also, the combination of many factors and goals has been taken into account to find the highest priority and feasible solution results. To illustrate the approach we propose in this research, seven cultural heritages in Taipei city as one example has been used as an empirical study, and the results are in depth analyzed to explain the application of our proposed approach.
Abstract: The paper proposes an approach to ranking a set of potential countries to invest taking into account the investor point of view about importance of different economic indicators. For the goal, a ranking algorithm that contributes to rational decision making is proposed. The described algorithm is based on combinatorial optimization modeling and repeated multi-criteria tasks solution. The final result is list of countries ranked in respect of investor preferences about importance of economic indicators for investment attractiveness. Different scenarios are simulated conforming to different investors preferences. A numerical example with real dataset of indicators is solved. The numerical testing shows the applicability of the described algorithm. The proposed approach can be used with any sets of indicators as ranking criteria reflecting different points of view of investors.
Abstract: The paper describes an approach for defining of k-best night vision devices based on multi-criteria mixed-integer optimization modeling. The parameters of night vision devices are considered as criteria that have to be optimized. Using different user preferences for the relative importance between parameters different choice of k-best devices can be defined. An ideal device with all of its parameters at their optimum is used to determine how far the particular device from the ideal one is. A procedure for evaluation of deviation between ideal solution and k-best solutions is presented. The applicability of the proposed approach is numerically illustrated using real night vision devices data. The proposed approach contributes to quality of decisions about choice of night vision devices by making the decision making process more certain, rational and efficient.
Abstract: The management of the health-care wastes is one of
the most important problems in Istanbul, a city with more than 12
million inhabitants, as it is in most of the developing countries.
Negligence in appropriate treatment and final disposal of the healthcare
wastes can lead to adverse impacts to public health and to the
environment. This paper employs a fuzzy multi-criteria group
decision making approach, which is based on the principles of fusion
of fuzzy information, 2-tuple linguistic representation model, and
technique for order preference by similarity to ideal solution
(TOPSIS), to evaluate health-care waste (HCW) treatment
alternatives for Istanbul. The evaluation criteria are determined
employing nominal group technique (NGT), which is a method of
systematically developing a consensus of group opinion. The
employed method is apt to manage information assessed using multigranularity
linguistic information in a decision making problem with
multiple information sources. The decision making framework
employs ordered weighted averaging (OWA) operator that
encompasses several operators as the aggregation operator since it
can implement different aggregation rules by changing the order
weights. The aggregation process is based on the unification of
information by means of fuzzy sets on a basic linguistic term set
(BLTS). Then, the unified information is transformed into linguistic
2-tuples in a way to rectify the problem of loss information of other
fuzzy linguistic approaches.
Abstract: The many feasible alternatives and conflicting
objectives make equipment selection in materials handling a
complicated task. This paper presents utilizing Monte Carlo (MC)
simulation combined with the Analytic Hierarchy Process (AHP) to
evaluate and select the most appropriate Material Handling
Equipment (MHE). The proposed hybrid model was built on the base
of material handling equation to identify main and sub criteria critical
to MHE selection. The criteria illustrate the properties of the material
to be moved, characteristics of the move, and the means by which the
materials will be moved. The use of MC simulation beside the AHP
is very powerful where it allows the decision maker to represent
his/her possible preference judgments as random variables. This will
reduce the uncertainty of single point judgment at conventional AHP,
and provide more confidence in the decision problem results. A small
business pharmaceutical company is used as an example to illustrate
the development and application of the proposed model.
Abstract: In practice, we often come across situations where it is
necessary to make decisions based on incomplete or uncertain data.
In control systems it may be due to the unknown exact mathematical
model, or its excessive complexity (e.g. nonlinearity) when it is
necessary to simplify it, respectively, to solve it using a rule base. In
the case of databases, searching data we compare a similarity
measure with of the requirements of the selection with stored data,
where both the select query and the data itself may contain vague
terms, for example in the form of linguistic qualifiers. In this paper,
we focus on the processing of uncertain data in databases and
demonstrate it on the example multi-criteria decision making in the
selection of variants, specified by higher number of technical
parameters.
Abstract: The decision of information technology (IT) outsourcing requires close attention to the evaluation of supplier selection process because the selection decision involves conflicting multiple criteria and is replete with complex decision making problems. Selecting the most appropriate suppliers is considered an important strategic decision that may impact the performance of outsourcing engagements. The objective of this paper is to aid decision makers to evaluate and assess possible IT outsourcing suppliers. An axiomatic design based fuzzy group decision making is adopted to evaluate supplier alternatives. Finally, a case study is given to demonstrate the potential of the methodology. KeywordsIT outsourcing, Supplier selection, Multi-criteria decision making, Axiomatic design, Fuzzy logic.
Abstract: The decision to recruit manpower in an organization
requires clear identification of the criteria (attributes) that distinguish
successful from unsuccessful performance. The choice of appropriate
attributes or criteria in different levels of hierarchy in an organization
is a multi-criteria decision problem and therefore multi-criteria
decision making (MCDM) techniques can be used for prioritization
of such attributes. Analytic Hierarchy Process (AHP) is one such
technique that is widely used for deciding among the complex criteria
structure in different levels. In real applications, conventional AHP
still cannot reflect the human thinking style as precise data
concerning human attributes are quite hard to be extracted. Fuzzy
logic offers a systematic base in dealing with situations, which are
ambiguous or not well defined. This study aims at defining a
methodology to improve the quality of prioritization of an
employee-s performance measurement attributes under fuzziness. To
do so, a methodology based on the Extent Fuzzy Analytic Hierarchy
Process is proposed. Within the model, four main attributes such as
Subject knowledge and achievements, Research aptitude, Personal
qualities and strengths and Management skills with their subattributes
are defined. The two approaches conventional AHP
approach and the Extent Fuzzy Analytic Hierarchy Process approach
have been compared on the same hierarchy structure and criteria set.
Abstract: In this paper we address a multi-objective scheduling problem for unrelated parallel machines. In unrelated parallel systems, the processing cost/time of a given job on different machines may vary. The objective of scheduling is to simultaneously determine the job-machine assignment and job sequencing on each machine. In such a way the total cost of the schedule is minimized. The cost function consists of three components, namely; machining cost, earliness/tardiness penalties and makespan related cost. Such scheduling problem is combinatorial in nature. Therefore, a Simulated Annealing approach is employed to provide good solutions within reasonable computational times. Computational results show that the proposed approach can efficiently solve such complicated problems.
Abstract: Need for an appropriate system of evaluating students-
educational developments is a key problem to achieve the predefined
educational goals. Intensity of the related papers in the last years; that
tries to proof or disproof the necessity and adequacy of the students
assessment; is the corroborator of this matter. Some of these studies
tried to increase the precision of determining question weights in
scientific examinations. But in all of them there has been an attempt
to adjust the initial question weights while the accuracy and precision
of those initial question weights are still under question. Thus In
order to increase the precision of the assessment process of students-
educational development, the present study tries to propose a new
method for determining the initial question weights by considering
the factors of questions like: difficulty, importance and complexity;
and implementing a combined method of PROMETHEE and fuzzy
analytic network process using a data mining approach to improve
the model-s inputs. The result of the implemented case study proves
the development of performance and precision of the proposed
model.
Abstract: Environmental decision making, particularly about
hazardous waste management, is inherently exposed to a high
potential conflict, principally because of the trade-off between sociopolitical,
environmental, health and economic factors. The need to
plan complex contexts has led to an increasing request for decision
analytic techniques as support for the decision process. In this work,
alternative systems of asbestos-containing waste management
(ACW) in Puglia (Southern Italy) were explored by a multi-criteria
decision analysis. In particular, through Analytic Hierarchy Process
five alternatives management have been compared and ranked
according to their performance and efficiency, taking into account
environmental, health and socio-economic aspects. A separated
valuation has been performed for different temporal scale. For short
period results showed a narrow deviation between the disposal
alternatives “mono-material landfill in public quarry" and “dedicate
cells in existing landfill", with the best performance of the first one.
While for long period “treatment plant to eliminate hazard from
asbestos-containing waste" was prevalent, although high energy
demand required to achieve the change of crystalline structure. A
comparison with results from a participative approach in valuation
process might be considered as future development of method
application to ACW management.
Abstract: The optimal operation of proton exchange membrane fuel cell (PEMFC) requires good water management which is presented under two forms vapor and liquid. Moreover, fuel cells have to reach higher output require integration of some accessories which need electrical power. In order to analyze fuel cells operation and different species transport phenomena a biphasic mathematical model is presented by governing equations set. The numerical solution of these conservation equations is calculated by Matlab program. A multi-criteria optimization with weighting between two opposite objectives is used to determine the compromise solutions between maximum output and minimal stack size. The obtained results are in good agreement with available literature data.