Abstract: Up to this point business process management projects
in general and business process modelling projects in particular
could not rely on a practical and scientifically validated method to
estimate cost and effort. Especially the model development phase
is not covered by a cost estimation method or model. Further
phases of business process modelling starting with implementation
are covered by initial solutions which are discussed in the literature.
This article proposes a method of filling this gap by deriving a cost
estimation method from available methods in similar domains namely
software development or software engineering. Software development
is regarded as closely similar to process modelling as we show. After
the proposition of this method different ideas for further analysis and
validation of the method are proposed. We derive this method from
COCOMO II and Function Point which are established methods of
effort estimation in the domain of software development. For this
we lay out similarities of the software development process and the
process of process modelling which is a phase of the Business Process
Management life-cycle.
Abstract: The accomplished study is based on the appointment
and identification of ageing effects and according to this absorption
of moisture of aircraft cabin components over the life-cycle. In the
first step of the study ceiling panels from same age and from the
same aircraft cabin have been examined according to weight changes
depending on the position in the aircraft cabin. In the second step of
the study different aged ceiling panels have been examined
concerning deflection, weight changes and the acoustic sound
transmission loss. To prove the assumption of water absorption
within the study and with the theoretical background from literature
and scientific papers, an older test panel was exposed extreme
thermal conditions (humidity and temperature) within a climate
chamber to show that there is a general ingress of water to cabin
components and that this ingress of water leads to the change of
different mechanical properties.
Abstract: This paper provides some thoughts about the lack of
attentiveness of building commissioning in the construction industry
and the lack of handling in project commissioning as an integral part
of the project life-cycle. Many have perceived commissioning as the
problem solving process of a project, rather than the start up of the
equipment, or the handing over of the project to the client. Therefore,
there is a lack of proper attention in the planning of commissioning
as a vital part of the project life-cycle. This review paper aims to
highlight the benefits of building commissioning and to propose the
lacking of knowledge gap on building commissioning. Finally, this
paper hopes to propose the shift of focus on this matter in future
research.
Abstract: In this paper a multi-objective nonlinear programming
model of cellular manufacturing system is presented which minimize
the intercell movements and maximize the sum of reliability of cells.
We present a genetic approach for finding efficient solutions to the
problem of cell formation for products having multiple routings.
These methods find the non-dominated solutions and according to
decision makers prefer, the best solution will be chosen.