Software Engineering Inspired Cost Estimation for Process Modelling

Up to this point business process management projects in general and business process modelling projects in particular could not rely on a practical and scientifically validated method to estimate cost and effort. Especially the model development phase is not covered by a cost estimation method or model. Further phases of business process modelling starting with implementation are covered by initial solutions which are discussed in the literature. This article proposes a method of filling this gap by deriving a cost estimation method from available methods in similar domains namely software development or software engineering. Software development is regarded as closely similar to process modelling as we show. After the proposition of this method different ideas for further analysis and validation of the method are proposed. We derive this method from COCOMO II and Function Point which are established methods of effort estimation in the domain of software development. For this we lay out similarities of the software development process and the process of process modelling which is a phase of the Business Process Management life-cycle.

The Influence of Water Ingress to Aircraft Cabin Components

The accomplished study is based on the appointment and identification of ageing effects and according to this absorption of moisture of aircraft cabin components over the life-cycle. In the first step of the study ceiling panels from same age and from the same aircraft cabin have been examined according to weight changes depending on the position in the aircraft cabin. In the second step of the study different aged ceiling panels have been examined concerning deflection, weight changes and the acoustic sound transmission loss. To prove the assumption of water absorption within the study and with the theoretical background from literature and scientific papers, an older test panel was exposed extreme thermal conditions (humidity and temperature) within a climate chamber to show that there is a general ingress of water to cabin components and that this ingress of water leads to the change of different mechanical properties.

Attentiveness of Building Commissioning in the Malaysian Construction Industry

This paper provides some thoughts about the lack of attentiveness of building commissioning in the construction industry and the lack of handling in project commissioning as an integral part of the project life-cycle. Many have perceived commissioning as the problem solving process of a project, rather than the start up of the equipment, or the handing over of the project to the client. Therefore, there is a lack of proper attention in the planning of commissioning as a vital part of the project life-cycle. This review paper aims to highlight the benefits of building commissioning and to propose the lacking of knowledge gap on building commissioning. Finally, this paper hopes to propose the shift of focus on this matter in future research.

Multi-Objective Cellular Manufacturing System under Machines with Different Life-Cycle using Genetic Algorithm

In this paper a multi-objective nonlinear programming model of cellular manufacturing system is presented which minimize the intercell movements and maximize the sum of reliability of cells. We present a genetic approach for finding efficient solutions to the problem of cell formation for products having multiple routings. These methods find the non-dominated solutions and according to decision makers prefer, the best solution will be chosen.